Eastern Coalfields Limited Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Coalfields Limited - ECL Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date25 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 37,68,648 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fabrication of one no. of heavy duty tail-end assembly which including labour cost, oxygen, DA and welding

1

-

-

... More
1000 mm PVC Belting transportation from surface, laying, jointing tensioning trail run etc.

280

-

-

... More
4 times belt shifting (09 hole in each shift)

36

-

-

... More
4 times belt extension including Tail End Assembly and hopper Shifting - 14 hds. x 1.5 shifts = 21 hds. for one extension

4

-

-

... More
Fencing of Drive Head, Loop Take Up and Tail End (Tail end fencing 16 times)

1

-

-

... More
Consumable Nut & Bolt 1/2” X 11/2” – 65 Kg, , Plain washer- 05 Kg,

70

-

-

... More
Fabriation of complete drive head including gear and motor base frame

1

-

-

... More
Installation of new 350mtr long 1000mm belt conveyor at 9WL in RIV seam for development in Khottadih Colliery. (Inclusive of EPF/CMPF)

-

-

-

... More
Complete Installation after Transportation & with Necessary Fabrication of 350 mtr long 1000mm with belt conveyor 9WL in RIV seam which includes 1) Transportation, Carrying from Surface & Fitting of Discharge Head (800 X1150 mm) with Deck Plate, Chute, scrapper and 08 nos of Girders (125 X 250 mm) - 3.0 MT 2) Transportation, Carrying from Surface & Fitting of Drive head with Gear Box & Motor – 7.5 MT 3) Transportation, Carrying from Surface & Fitting 1 nos. of load table one for Discharge & 2nd for Tail End& decking plate – 3 MT. 4) Transportation & Fitting including grouting of Tail end Assembly with V-Scraper & Decking fabrication & Fitting - 1 MT 5) Transportation, Carrying from Surface & Fitting Loop take up assembly with heavy duty mechanical Winch. & Bend Pulley frame - 3.0 MT, 6) Fitting Complete 450 mtr Structure with Top & Bottom Rollers after transported from surface to work site laying ,and, fitting @ -110Kg-per-mtr, - 38.5MT

56.5

-

-

... More
Fabrication of One no of hopper 04 mtrs long which including labour cost, oxygen, DA and welding

2

-

-

... More
Fabrication of one no. of heavy duty tail-end assembly which including labour cost, oxygen, DA and welding

1

-

-

... More
Fabrication of loop take up assembly with trolley which including labour cost, oxygen, DA and welding and making 4 nos. of pullies

1

-

-

... More
1000 mm PVC Belting transportation from surface, laying, jointing tensioning trail run etc.

700

-

-

... More
1)Holding down bolts of Drive Hd & Stucture , and Tail End. – 40 Nos 2) 8 times belt shifting(09 holes in each shifting)

112

-

-

... More
Transportation of ACB, starter & PVC cable, Pull Cord, Signaling System etc surface to site.

1

-

-

... More
8 times belt extension including Tail End Assembly and hopper Shifting - 14 hds. x 1.5 shifts = 21 hds. for one extension,

8

-

-

... More
Fencing of Drive Head, Loop Take Up and Tail End (Tail end fencing 16 times)

1

-

-

... More
Consumable Nut & Bolt 1/2” X 11/2” – 240 Kg, 5/8 “X 2“ -50 Kg, Plain washer- 20 Kg, 5/8" X 21/2"-10 Kg

400

-

-

... More
Hanging by vartical support 30 mtr. length conveyor structure providing M.S. channel

40

-

-

... More
Fabriation of complete drive head including gear and motor base frame

1

-

-

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.