Eastern Coalfields Limited Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Eastern Coalfields Limited - ECL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Jan 2025
Closing Date4 Feb 2025
Tender Amount₹ 13,83,540
Costs
EMD
₹ 17,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ECL_326436_1Bid Award Id
ViewTender No
SLN/GM/EandM/E-Tender/24-25/79 Dt.-21/01/2025Tender Authority
Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.easterncoal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Erection of 8M PCC/PSC pole including excavation for pole having depth of 1.5-2.0 Mtr as per site condition
12
-
-
... More
Laying of LT AB Cable (3Cx50+16+35) Sq.mm.
(AB cable will be supplied departmentally)
230
-
-
... More
Supply & fitting of iron materials (Bracket) on pole
150
-
-
... More
Supply & fitting of Dead end, suspension clamp etc
15
-
-
... More
Supply & fitting of AB cable connector
40
-
-
... More
Supply & fitting of AB cable distribution box
5
-
-
... More
Supply & fitting of earth spike for pole earthing
12
-
-
... More
Making of earthpit and continuous earth continuity
2
-
-
... More
Supply & fitting of 100Amp MCCB 4 pole
1
-
-
... More
Supply & fitting of 63A ICTPN 4 pole with enclosure
2
-
-
... More
Supply & fitting of 32/25/16 A MCB Single pole 'C'
24
-
-
... More
Supply & fitting of 63A Busbar for distribution
2
-
-
... More
Supply & laying of LT 3.5 core 70 sqmm Armoured Aluminium cable
80
-
-
... More
B) Power Supply to B type Quarter and Area Dispensary: (Approx. length 350 Mtr)
-
-
-
... More
Supply of 8M PCC/PSC pole
10
-
-
... More
Shifting of existing 8M long PCC pole to new location
6
-
-
... More
Erection of 8M PCC/PSC pole including excavation for pole having depth of 1.5-2.0 Mtr as per site condition
16
-
-
... More
Laying of LT AB Cable (3Cx50+16+35) Sq.mm. (AB cable will be supplied departmentally)
350
-
-
... More
Supply & fitting of iron materials (Bracket) on pole
180
-
-
... More
Supply & fitting of Dead end, suspension clamp etc
25
-
-
... More
Supply & fitting of AB cable connector
60
-
-
... More
Supply & fitting of AB cable distribution box
8
-
-
... More
Supply & fitting of earth spike for pole earthing
16
-
-
... More
Making of earthpit and continuous earth continuity
2
-
-
... More
Supply & fitting of 100Amp MCCB 4 pole
1
-
-
... More
Supply & fitting of 63A ICTPN 4 pole with enclosure
3
-
-
... More
Supply & fitting of 63A Busbar for distribution
3
-
-
... More
Supply & fitting of 32/25/16 A MCB Single pole 'C'
36
-
-
... More
Supply & laying of LT 3.5 core 70 sqmm Armoured Aluminium cable
120
-
-
... More
C) Power Supply to D type quarter & GM Bungalow (Approx length 270 Mtr):
-
-
-
... More
Supply of 8M PCC/PSC pole
8
-
-
... More
Shifting of existing 8M long PCC pole to new location
6
-
-
... More
Erection of 8M PCC/PSC pole including excavation for pole having depth of 1.5-2.0 Mtr as per site condition
14
-
-
... More
Laying of LT AB Cable (3Cx70+16+50) Sq.mm.- 270 mtr and Laying of LT AB cable (3Cx50+16+35) sq.mm-270 mtr for DG set separate supply (AB cable will be supplied departmentally)
540
-
-
... More
Supply & fitting of iron materials (Bracket) on pole
280
-
-
... More
Supply & fitting of Dead end, suspension clamp etc
28
-
-
... More
Supply & fitting of AB cable connector
60
-
-
... More
Supply & fitting of AB cable distribution box
10
-
-
... More
Supply & fitting of earth spike for pole earthing
14
-
-
... More
Making of earthpit and continuous earth continuity
2
-
-
... More
Supply & fitting of 100Amp MCCB 4 pole
1
-
-
... More
Supply & fitting of 100A Busbar for distribution
2
-
-
... More
Supply & fitting of 100Amp 4 pole changeover switch
1
-
-
... More
Supply & fitting of 63A ICTPN 4 pole with enclosure
4
-
-
... More
Supply & fitting of 63A Busbar for distribution
4
-
-
... More
Supply & fitting of 32/25/16 A MCB Single pole 'C'
36
-
-
... More
Supply & laying of LT 3.5 core 70 sqmm Armoured Aluminium cable
120
-
-
... More
Supply & laying of LT 3.5 core 95 sqmm Armoured Aluminium cable
50
-
-
... More
D) Power Supply arrangement for Area Office building exterior lights
-
-
-
... More
Supply & laying of 3 core 4 sq mm aluminium cable for power supply to exterior building flood lights
270
-
-
... More
30 Amp auto timer switch with 32A Contactor,MCB in a enclosure for controlling of flood lights
2
-
-
... More
Dismantling of existing poles, AB cable, ACSR conductor and other accessories
1
-
-
... More
Consummable items like nut-bolt, tape, GI wire, switch, PVC conduit etc as per requirement
1
-
-
... More
Trimming of tree branches for drawing of OHL
(High Skilled labour 2 head @948 + Skilled Labour 4 head @862)+12% PF
4
-
-
... More
Add: Overhead profit & contingencies
1
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements