Eastern Coalfields Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Eastern Coalfields Limited - ECL Tender
Civil And Construction
Eprocure
Opening Date12 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 1,13,31,846
Costs
EMD
₹ 1,41,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ECL_317370_1Bid Award Id
ViewTender No
ECL/GM/BA/E TENDER/24-25/EnM/176 Dt 11.09.2024Tender Authority
Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.easterncoal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Foundation bolting for fitting of tail end unit =24nos
24
-
-
Cleaning of coal & unused materials before installation job
1
-
-
Taken out and coiling of belt (270 mtr existing belting)
270
-
-
Cost of M.S. Nut bolts & washers
120
-
-
Making, and fabrication of tail end frame
1
-
-
Cost of Fabrication of bracket as per 1200mm conveyor
40
-
-
Cost of Fabrication of foot stool as per 1200mm conveyor
55
-
-
Cost of Fabrication of Stringer as per 1200mm conveyor
70
-
-
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-120mtr @68Kg/mtr = 8.16MT +2 times Tail end shifting(extension)-2MT= total weight =31.76 MT
31.76
-
-
Fitting of tail end and discharge scraper.
2
-
-
Belt laying including transporting of belt, jointing, tensioning, trail run etc
230
-
-
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
120
-
-
Cleaning of coal & unused materials before installation job
1
-
-
Making, and fabrication of tail end frame
1
-
-
Making of new base frame for dual drive unit consists of 2nos motor 2 no gear 2nos drum at surface workshop with proper alignment.
1
-
-
Making and fabrication of new discharge unit
1
-
-
Making, and fabrication of Load table
1
-
-
Fencing of drive ,loop take up & tail end .
1
-
-
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
1
-
-
Cost of M.S. Nut bolts & washers
135
-
-
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
6
-
-
Drive base frame , Loop take up base & discharge base cement concrete
14
-
-
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+ dual motor, winch starter & switches cables etc -3.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-720mtr @68Kg/mtr = 48.96MT +15 times Tail end shifting(extension)-15MT= total weight =86.56 MT
86.56
-
-
Fitting of tail end and discharge scraper.
4
-
-
Belt laying including transporting of belt, jointing, tensioning, trail run etc
1460
-
-
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
120
-
-
Cleaning of coal & unused materials before installation job
1
-
-
Making, and fabrication of tail end frame
1
-
-
Making, and fabrication of Load table
1
-
-
Fencing of drive ,loop take up & tail end unit
1
-
-
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
1
-
-
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -3.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-720mtr @68Kg/mtr =48.96MT= total weight =71.56 MT
71.56
-
-
Taken out and coiling of belt
1460
-
-
Cost of M.S. Nut bolts & washers
540
-
-
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
24
-
-
Drive base frame , Loop take up base & discharge base cement concrete
14
-
-
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+ dual motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-240mtr @68Kg/mtr = 19.04MT +5 times Tail end shifting(extension)-5MT= total weight =45.64 MT
45.64
-
-
Fitting of tail end and discharge scraper.
4
-
-
Belt laying including transporting of belt, jointing, tensioning, trail run etc
500
-
-
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
120
-
-
Cleaning of coal & unused materials before installation job
1
-
-
Making, and fabrication of Load table
1
-
-
Fencing of drive ,loop take up & tail end unit
1
-
-
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
1
-
-
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+ dual motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-240mtr @68Kg/mtr = 19.04MT =40.64 MT
40.64
-
-
Taken out and coiling of belt
500
-
-
Cost of M.S. Nut bolts & washers
230
-
-
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
10
-
-
Drive base frame , Loop take up base & discharge base cement concrete
14
-
-
Total impact of GST for the purpose of CTC