Eastern Coalfields Limited Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Eastern Coalfields Limited - ECL Tender
Eprocure
Opening Date11 Jan 2025
Closing Date21 Jan 2025
Tender Amount₹ 3,62,142
Costs
EMD
₹ 4,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ECL_325301_1Bid Award Id
ViewTender No
ECL/SSA/GM/E M/E-NIT/2024-25/149 Date 07.01.2024Tender Authority
Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.easterncoal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
The defective fusible plug is to be removed and the mounting pad to be repaired by necessary build up and rethreaded in original manner.Then new fusible plug is to be in IBR approved manner
3
4600
-
... More
The vertical boiler needs to be lifted using hydraulic boiler jacks from three sides so that the damaged base plate can be cut out using oxy0acetylene cutter
3
2300
-
... More
The foundation brick work needs to be repaired including materials
3
2200
-
... More
The defective rivets from the foundation seam are to be cut out and reemoved from the boiler as Director by the Asst. Directors of Boilers
3
2300
-
... More
The wasting places of the foundation rivets area are to be build up by BQ electrodes and dressed smooth
3
3900
-
... More
The enlargeed rivet holes are to be repaired
3
2200
-
... More
The boiler quality new rivets are to be forged steel as per IBR50
3
3000
-
... More
The new BQ rivets are to be fitted to the boiler in approved manner
3
4500
-
... More
The wasting shell extension plate are to be cut and removed,Then new plate are to be fabricated and fitted to the boiler by necessary welding as per IBR approved manner
3
8300
-
... More
Finally the boiler needs to be reseated with proper alignment on the new foundation
3
3000
-
... More
The staggered and isolated pitting were noticed upto 2mm was found on the up-take tube,The position where the thickness gauging was carried are to be built up by electric arc welding with pre-post heating treatment and dressed smooth to original shape and thickness
3
13400
-
... More
The furnace crown was found to be pitted locally at isolated places between 4 o'clock to 8 o'clock position on water side.The position where the thickness gauging was carried are to be built up by electric arc welding with pre-post heat treatment and dressed smooth to original shape and thickness
3
6200
-
... More
The mud hole cover area are to be build up with pre-post heat treatment and dressed smooth to original shape and thicknessmaintaining the spigot clearance to upto 1mm.All mud plugs studs are to be replaced with new ones
3
7200
-
... More
The gauge column cocks are to be repaired by replacing all the worn out spares and reassembled the same in original manner….02 sets
3
5100
-
... More
Repairing of stop valve including its dismantling,welding,machining, grinding where everequired of valves and seats.Then the valve is to be reassembled and refitted in existing manner
3
3100
-
... More
Repaiirng of safety valve including its dismantling,rebuilding with proper materials,maching grinding uo to leak proof.Then it it to be reassembled and refitted in existing manner
3
2400
-
... More
The blow down valve is to be dismantled throughly and inner spares and mounting studs are to be replaced with new ones.Then fitted to the boiler with necessary joint packings upto running order
3
2200
-
... More
The feed check valve worn out SSNRV is to be dismantled and to be rebuild by SS welding & machining & grinding throughly then reassembled the above valve with necessary joints packing etc. & to be fitted up to running order
3
1800
-
... More
The fire door caulking edge has to be V cut and then welded with pre-post heat tratment and then dressed smooth. Aftewelding the edge has to be caulked up to leak proof
3
4800
-
... More
The fire door plate was getting damaged due to constant firing of boiler hence as advised by Dy. Director of Boilers, a new protection cover needs to be made over the bottom half of the fire door
3
2900
-
... More
Charges for necessary blanking the boiler with necessary joint packings etc. and then the boiler is to be tested hydraulically at apressure of 150PSI
3
2700
-
... More
Charges for fitting all the valves and mounting fittings with necessary high pressure steam joints, asbestos tape joint etc. The boiler is to be made rerady for commissioning
3
4600
-
... More
Total impact of GST for the purpose of CTC
1
-
-