Eastern Coalfields Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Coalfields Limited - ECL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Dec 2024
Closing Soon8 Jan 2025
Tender Amount₹ 8,99,897 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Demolishing cement concrete including disposal of material within 50 metres lead : 1:3:6 or richer mix

1.72

1494

2571.23

... More
Earth work in excavation by mechanical means/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms,lift upto 1.5m,including getting out the excavated soil and disposal of surplas excavated soil as directed,within a lead of 50m.All kinds of soil.

51.55

188

9730.06

... More
Supplying & filling in plinth with sand under floors including,watering,ramming consolidating and dressing complete.

8.92

1061

9469.47

... More
Single BF soling with picked Jhama bricks including preparation of the bed as necessary

118.86

312

37084.32

... More
Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases of Columns

12.83

269

3455.12

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level (1:3:6)(20mm nominal size aggregate

2.76

5434

14999.36

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level (1:2:4)(20mm nominal size aggregate

13.87

6007

83319.86

... More
Brick work with F.P.S. bricks of class designation 7.5 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand)

16.48

5737

94557.3

... More
Brick work with F.P.S. bricks of class designation 7.5 in superstructure above plinth level upto floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)

0.74

6973

5160.46

... More
Half brick masonry with bricks of class designation 7.5 in foundations and plinth in : Cement mortar 1:4 (1 Cement : 4 coarse sand)

6.6

721

4764.54

... More
Half brick masonry with bricks of class designation 7.5 in superstructure above plinth up to floor V level in : Cement mortar 1:4 (1 Cement : 4 coarse sand)

1.47

858

1262

... More
Steel work in built up tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes.

726

128

93363.6

... More
Welding by gas or electric plant including transportation of plant at site.

250

2

737.5

... More
Structural steel work riveted or bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete:

855.6

97

83506.56

... More
Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 micronsepoxy primer on both side of the sheet and polyester top coat 15-18microns. Sheet should have protective guard film of 25 micronsminimum to avoid scratches during transportation and should besupplied in single length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tappingscrews of size (5.5x 55 mm) with EPDM seal, complete upto anypitch in horizontal/ vertical or curved surfaces, excluding the cost ofpurlins, rafters and trusses and including cutting to size and shapewherever required.

252.48

606

153116.5

... More
Providing and fixing precoated galvanised steel sheets roofing accessories 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 micronsepoxy primer on both side of the sheet and polyester top coat 15-18microns using self drilling /self tappingscrews complete :Ridges Plain (500-600mm)

1

393

393.45

... More
Providing corrugated G.S. sheet roofing including vertical or curved surfacefixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto a pitch of 60 degrees) excluding the cost of purlins, rafters and trusses.(0.63 mm thick with zinc coating not less than 275 gm/sqm)

55.59

826

45950.69

... More
Providing ridges or hips of width 60 cm over all width plain G.S.sheet fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete 0.63mm thick with zinc coating not less than 275gm/m²

1.2

648

778.08

... More
12 mm cement plaster of mix :1:6 (1 cement : 6 fine sand)

127.37

226

28887.52

... More
6 mm plaster of cement mix:1:3 (1 cement:3 fine sand)

8.76

203

1783.97

... More
Neat cement punning

59.18

56

3349.59

... More
Extra for providing and fixing wind ties of 40x 6 mm flat iron section.

105

150

15849.75

... More
Colour washing such as green, blue or buff to give an even shade New work (two or more coats) with a base coat of whiting

738.07

34

25389.61

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work

90

103

9342

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : one or more coats on old work

130

68

8872.5

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m

5.51

121

666.99

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

6.68

190

1271.87

... More
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. All kinds of soi

55

20

1152.25

... More
Supplying and Laying polythene Sheet (150 gm/Sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.

81.24

24

1949.76

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.