Eastern Coalfields Limited Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Eastern Coalfields Limited - ECL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date25 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 4,46,077
Costs
EMD
₹ 5,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Maintenance Of The Following Lighting Transformer Installed At Different Location Of Bankola Colliery.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ECL_321973_1Tender No
ECL/GM/BA/E TENDER/24-25/EnM/282 Dt 25.11.2024Tender Authority
Eastern Coalfields Limited ViewPurchaser Address
-Website
http://http://www.easterncoal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
disconnection ,dismentelling ,reconnection of primary secondary cable
2
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
4
-
-
supply of insulating material for N/A tape paspon paper cotton tape HT monoplus tape etc
1
-
-
dehydration and filteration of transformer oil
200
-
-
transport charge for filter machinetools & manpower etc
1
-
-
B) 100KVA, 550V/440V.dismentelling of top cover,inspection chhember 3 bnos conservator tan k vent pipe and HV & LV connection box with new gaskit fixing including all materials
1
-
-
drain out of transformer oil in empty oil in empty oil barrel after maintenance top up the same
200
-
-
disconnection ,dismentelling ,reconnection of primary secondary cable
2
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
4
-
-
supply of insulating material for N/A tape paspon paper cotton tape HT monoplus tape etc
1
-
-
dehydration and filteration of transformer oil
200
-
-
transport charge for filter machinetools & manpower etc
1
-
-
C) 100KVA, 550V/440V. dismentelling of top cover,inspection chhember 3 bnos conservator tan k vent pipe and HV & LV connection box with new gaskit fixing including all materials
1
-
-
drain out of transformer oil in empty oil in empty oil barrel after maintenance top up the same
200
-
-
disconnection ,dismentelling ,reconnection of primary secondary cable
2
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
4
-
-
supply of insulating material for N/A tape paspon paper cotton tape HT monoplus tape etc
1
-
-
dehydration and filteration of transformer oil
200
-
-
transport charge for filter machinetools & manpower etc
1
-
-
D) 100KVA, 550V/440V. dismentelling of top cover,inspection chhember 3 bnos conservator tan k vent pipe and HV & LV connection box with new gaskit fixing including all materials
1
-
-
drain out of transformer oil in empty oil in empty oil barrel after maintenance top up the same
200
-
-
disconnection ,dismentelling ,reconnection of primary secondary cable
2
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
4
-
-
supply of insulating material for N/A tape paspon paper cotton tape HT monoplus tape etc
1
-
-
dehydration and filteration of transformer oil
200
-
-
transport charge for filter machinetools & manpower etc
1
-
-
E) 250KVA, 11KV/440V. supply and fixing of brass stud with insulator ( Bushing )
4
-
-
drain out of transformer oil in empty oil in empty oil barrel after maintenance top up the same
460
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
6
-
-
dismentelling of top cover,inspection chamber stud bushes and making crock sheet 8 mm/6mm as sand where required basis
1
-
-
supply of insulating material for making connection of primary and seconday side cable
1
-
-
dehydration and filteration of transformer oil
460
-
-
labor charge for assembelling ,fitting testing commissioning etc
1
-
-
F) 250KVA, 11KV/440V. supply and fixing of brass stud with insulator ( Bushing )
2
-
-
drain out of transformer oil in empty oil in empty oil barrel after maintenance top up the same
460
-
-
dismentelling ,refixing of primery ,secondory side stud busing including new gaskit fixing
7
-
-
dismentelling of top cover,inspection chamber stud bushes and making crock sheet 8 mm/6mm as sand where required basis
1
-
-
supply of insulating material for making connection of primary and seconday side cable
1
-
-
dehydration and filteration of transformer oil
460
-
-
labor charge for assembelling ,fitting testing commissioning etc
1
-
-
G) 500KVA, 11KV/550V. drain out of transformer oil in empty oil from the transformer
1
-
-
dismentelling stud and taking out of damamaged gasket of fixing of new gasket insulator etc
1
-
-
dismentelling of top cover,inspection chamber etc and fixing new gasket of 70C X 8 mm
1
-
-
supply of insulating material for material after disconnection of inner jumper etc
6
-
-
dehydration and filteration of transformer oil
600
-
-
supply and fixing of primery stud
3
-
-
transport charge for filter machine testing machine tools and tackles etc
1
-
-
H) 500KVA, 11KV/550V. drain out of transformer oil in empty oil
1
-
-
dismentelling stud and taking out of damamaged gasket of fixing of new gasket insulator etc
1
-
-
dismentelling of top cover,inspection chamber ec , and fixing new gasket of 70X 8 mm
1
-
-
supply of insulating material after disconnection of inner jamper etc
7
-
-
dehydration and filteration of transformer oil
600
-
-
supply and fixing of primery stud
3
-
-
transport charge for filter machinetesting machine tools and tackles etc
1
-
-
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%