Eastern Coalfields Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Eastern Coalfields Limited - ECL Tender

Eprocure
Opening Date22 Jun 2021
Closing Date9 Jul 2021
Tender Amount₹ 58,26,236 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and installation of monoblock pump & motor(7.5 HP/2900 RPM motor)

2

-

73800

... More
Supplying and installation of 30 HP single stage high speedmonoblock pump set 440v/550v.

2

-

167500

... More
Supplying and installation of 16mm diameter cable

60

-

870

... More
Providing fitting and fixing G.I pipe 100mm dia all complete

103

-

814

... More
Providing fitting and fixing gun non return valve 100mm site

2

-

3768.2

... More
One year maintenance and operation complete Unskilled labour

365

-

470.4

... More
One year maintenance and operation complete Semiskilled labour

365

-

551.04

... More
One year maintenance and operation complete Skilled labour

6

-

664.16

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge In all sorts of soil excluding marshy soil & rocks (soft or hard) by mechanical means (using excavator of suitable capacity). Depth upto 3 m (i) With pumping out water.

469.9

-

49.23

... More
P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

3.18

-

4936.2

... More
Single Brick flat soling

29.32

-

237.45

... More
Sand filling in foundation & plinth

9.38

-

504.72

... More
Providing and laying in position specified grade of RCC, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

152.41

-

6219.5

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete

27.05

-

165.3

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.

581.48

-

310.35

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform

202.52

-

344.85

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts

5.66

-

387.45

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers

40.54

-

283.4

... More
12 mm cement plaster finished with a floating coat of neat cement of mix- 1:4 (1 cement: 4 fine sand)

253.17

-

182.95

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars

9145.24

-

52.1

... More
P/L in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

11.24

-

4742.4

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

1038

-

60.95

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

8328.07

-

53.55

... More
12 mm cement plaster finished with a floating coat of neat cement of mix- 1:4 (1 cement: 4 fine sand)

320.29

-

182.95

... More
Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade- New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution

106.09

-

67.4

... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil.

9.5

-

143.5

... More
Brick work with common burnt clay F.P.S. bricks of class designation 7.5 in foundation and plinth in- Cement mortar 1:6 (1 cement : 6 coarse sand)

4.05

-

4291.65

... More
Brick work with common burnt clay F.P.S. bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)

11.52

-

4947.75

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).

7.48

-

6588.75

... More
RCC work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

4.64

-

6405.3

... More
P/L P.C.C. excluding the cost of centering and shuttering - All work up to plinth level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1.2

-

5437.75

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Weather shade, Chajjas, corbels etc., including edges

4.32

-

429.5

... More
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer- Using flats 30x6mm for diagonal braces and central cross piece

7.92

-

2393.15

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work

15.84

-

63.5

... More
CEMENT PLASTER (IN FINE SAND) 12mm thick cement plaster of mix 1:6 (1 cement: 6 fine sand)

31.14

-

130.5

... More
6mm thick cement plaster in ceiling 1:3 (1 cement : 3 fine sand)

20

-

120.2

... More
Finishing walls with Acrylic Smooth exterior paint of required shade- New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)

15.57

-

77.75

... More
Colour washing with stainer other than Yellow & Pink

46.59

-

15.96

... More
Supplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/ RCCB/ Isolator. 4 way (4 + 12), Double door

1

-

2048.93

... More
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface / recessed steel conduit, with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point with 1.5 sq.mm. FR PVC insulated copper conductor single core cable etc as required. Group A

10

-

598.2

... More
Supplying, installing, testing and commissioning of following capacity TPN tap off box / plug-in box made of 1.6mm thick sheet steel enclosure duly painted with powder coating on existing overhead bus bar system complete with TPN disconnector FSU and HRC fuses, connections, earthing etc. as required. 100 amps

2

-

5567.42

... More
Wiring for light/ power plug with 2X4 sq. mm FR PVC insulated copper conductor single core cable in surface/ recessed steel conduit along with 1 No 4 sq. mm FR PVC insulated copper conductor single core cable for loop earthing as required.

16

-

219.49

... More
Pension @ 7%

1

-

82346.37

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.