District Magistrate Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

District Magistrate Tender

Works
Civil And Construction
Eprocure
Opening Date4 Oct 2024
Closing DateCancelled
Tender Amount₹ 36,61,957 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.(payment to be made on measurement of finished quantity) for : Plinth of existing Rooms including Dining and Kitchen

45.06

-

-

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. - Pakur Variety, for: (i) Floors of Rooms of existing Hostel Building(ii) Kitchen (iii) Passage(iv) Plinth protection

19.15

-

-

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforce-ment if any, in ground floor as per relevant IS codes. (i) Pakur Variety : Add extra over the rate of ground floor for basement and each additional floor above ground floor for items 1, 4 to 22 of subhead B - upto 4 th floor, for : RCC Columns over th

1.03

-

-

... More
'Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) - Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work - Extra for works beyond the roof of ground floor per additional floor, upto 4th (per floor) and in basement, for : RCC Columns over the Roof of 3rd floor

16.5

-

-

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches, at : Ground Floor, below Room Floors

204.72

-

-

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m. : Tor steel - other than SAIL/ TATA/RINL (JSW/SHYAM/SRMB etc)

0.08

-

-

... More
Brick work with 1st class bricks in cement mortar (1:6) - In superstructure Gr. Floor, at : Kitchen for supporting Br. Pillars under Kitchen Slab

0.45

-

-

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in Ground floor, for : (i) Toilet Block(ii) Walls of existing RoomDeductions for : Door Openings

33.39

-

-

... More
Do- at 1st Floors : Add extra for each additional floor over the rate for ground (i) 29 to 35 except 31 (a) upto 4th floorDeductions for : Door Openings

28.55

-

-

... More
Do- over the Roof of 3rd floor, for : Parapet Walls

114.47

-

-

... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. for : Gr. floor: (i) Interior walls of Rooms of existing Hostel Building (ii) Inside of Toilet Block (iii) 1st Floor (iv) 2nd Floor(v) 3rd Floor (vi) Outside Walls : Ground Floor (vii) Outside Walls : 3rd Floor

1542.91

-

-

... More
Removing old scales, blisters etc. of interior surface of walls, ceiling by scraping etc. and preparing smooth and even surface with rendering or cement mortar (1:2) (as necessary), to make the surface suitable for receiving distemper. (Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge). for : A) 3rd Floor : (i) Inside walls (ii) Outside walls (Parapet) B) 2nd Floor : (i) Inside walls (ii) Outside walls C) 1st Floor : (i) Inside walls(ii) Outside walls D) Gr. Floor : (i) Inside walls (ii) Outside walls

2654.91

-

-

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface], ii) With 1:4 cement mortar - 10 mm thick plaster for : (i) ceiling of existing Building (ii) Toilet Block (iii) Chajja

193.55

-

-

... More
Do- at 1st floor for : (i) Ceiling (ii) Toilet Block '(iii) Chajja

230.58

-

-

... More
Do- at 2nd floor for : (i) Ceiling (ii) Toilet Block '(iii) Chajja

232.26

-

-

... More
Do- (Ground floor). [Excluding cost of chipping over concrete surface] - With 1:6 cement mortar : 15 mm thick plaster for : (i) Interior walls of existing Building'(ii) Toilet Block '(ii) Outside WallsDeductions for : (i) Door Openings (ii) Window Openings

636.17

-

-

... More
(1st floor). for : (i) Interior walls of existing Building '(ii) Toilet BlockDeductions for : (i) Door Openings (ii) Window Openings

423.29

-

-

... More
Do- (2nd floor). for : (i) Interior walls of existing Building '(ii) Toilet Block Deductions for : (i) Door Openings (ii) Window Openings

429.68

-

-

... More
Do- (3rd floor). for : (i) Interior walls of existing Building (ii) Outside Walls Deductions for : (i) Door Openings (ii) Window Openings

229.02

-

-

... More
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per 100 sq.m. for : (i) External walls of the existing Building(ii) Rooms (At Gr. Floor) (iii) Rooms (At 1st Floor) (iv) Rooms (At 2nd Floor) (v) Rooms (At 3rd Floor)

134.51

-

-

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement : 35 mm. thick, for floors of: (i) Rooms of existing Hostel Building(ii) Steps of staircases

58.75

-

-

... More
Do- (Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A) - at 1st Floor, for : (i) Rooms (ii) Steps of staircases

74.49

-

-

... More
Do- (Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A) - at 2nd Floor of the existing Hostel Building

48.1

-

-

... More
Do- (Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A) - at the Roof of 3rd Floor of the existing Hostel Building Deductions for : Staircase portion

343.42

-

-

... More
Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency] (a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana iii) Area of each Slab/tile exceeding 0.60 sq.m but not exceeding 1.00 sq.m. for : (i) floor of Kitchen (ii) Dining (iii) Dining Slab (iv) Toilet Block

85.71

-

-

... More
Do- Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. at 1st Floor for : Toilet Block'-Do- at 2nd Floor for : Toilet Block

21.38

-

-

... More
Do- at 3rd Floor for : Toilet Block

21.38

-

-

... More
Supplying, fitting, fixing marble slab/tiles, 15 mm. to 18 mm. thick in dado / wall in 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks applying white cement slurry @ 4.4 kg/ sq.m at the back side of marble & pointing in cement mortar (1:2) (1 cement, 2 marble dust) with admixture of pigment matching the stone shades including polishing all complete as per direction of the Engineer-in-charge including cost of materials, labours, scaffolding, staging, curing complete. [White cement, Pigment to be supplied by the Agency] (a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur Pink / Udaypur green / Black Bhalsana Area of each slab/tile exceeding 0.3 sq.m. but not exceeding 0.6 sq.m. for, Dado of : (i) Kitchen(ii) Dining (iii) Toilet Block Deductions for : (i) Door Openings

29.3

-

-

... More
-Do- at 1st Floor, for : Toilet BlockDeductions for : Door Openings

23.27

-

-

... More
-Do- at 2nd Floor, for : Toilet Block

23.27

-

-

... More
-Do- at 3rd Floor, for : Toilet Block

23.27

-

-

... More
Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall - With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/ Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. : Area of each tile upto 0.09 Sq.m. - other than Coloured decorative including white for, Walls of : (i) Kitchen(ii) Walls of Dining (iii) Toilet Block Deductions for : (i) Door Openings =(ii) Window Openings

180.21

-

-

... More
Do- Add extra for each addl, floor over the rate for item 35 & 36 of subhead A, at 1st floor for : Toilet BlockDeductions for : (i) Door Openings(ii) Window Openings

86.21

-

-

... More
Do- Add extra for each addl, floor over the rate for item 35 & 36 of subhead A, at 1st floor for : Toilet Block Deductions for : (i) Door Openings (ii) Window Openings

86.21

-

-

... More
Do- Add extra for each addl, floor over the rate for item 35 & 36 of subhead A, at 1st floor for : Toilet BlockDeductions for : (i) Door Openings(ii) Window Openings

86.21

-

-

... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). d) Sal : Local. for : Doors

0.19

-

-

... More
Do- Extra for Lifting Charges for each additional floor, at : 1st Floor

0.27

-

-

... More
Do- Extra for Lifting Charges for each additional floor, at : 2nd Floor

0.19

-

-

... More
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) - 25mm thick shutters with 12mm thick panel of size 30 to 45 cm. - Sishu, Gamar, Champ, Badam, Bhola, Mogra, Hallak. (A) Ground floor, for : Doors

8.56

-

-

... More
Do- Add extra over the rate of ground floor for each addl. Floor. - (i) Upto 4th floor. : At 1st floor for : Doors

14.98

-

-

... More
Do- At 2nd floor for : Doors'-Do- At 3rd floor for : Doors

12.21

-

-

... More
Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials, for : Doors

2

-

-

... More
M.S. works in brackets made from flats, angles, tees etc. to sizes specialy bent, twisted, forged; making holes drilled and fitted to rafter of trusses with necessary bolts, nuts, washer or screws etc. (length of straight not less than 230 mm) - Using M.S. Flat of size 25 mm x 5 mm

35.33

-

-

... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) : (a) 40mm X 6mm, 250 mm Length for : Doors

114

-

-

... More
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. (vi) 100mm. X 58mm. X 1.90 mm. for : (i) Doors (ii) Windows

366

-

-

... More
Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (c) 300mm long.

40

-

-

... More
Iron socket bolt of approved quality fitted and fixed complete. (b) 100 mm long x 10mm dia bolt. for : Windows

80

-

-

... More
Iron socket bolt of approved quality fitted and fixed complete. (e) 300 mm. long x 10 mm. dia. Bolt for : Doors =

38

-

-

... More
Iron catch hook of approved quality fitted and fixed to shutter and chowkat. (b) 6mm dia x 225mm long. for : Windows

172

-

-

... More
Supplying, Fitting & Fixing Factory made P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm, PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm long M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer’s specification and direction of Engineer-in-Charge.

114

-

-

... More
fitting and fixing P.V.C. door shutter of approved quality & shade in position, the style & rail of the P.V.C. door shutter will be made of rigid P.V.C. multicavity hollow chamber of 59 mm x30 mm section with 2.0 mm (+/-0.2 mm) wall thickness. Horizontal & vertical section shall be fixed to each other by self tapping screws and 1 solid polymeric or M.S. galvanised tubular 'L' shaped bracket 100mm x 200mm in each corner of the shutter frame for placing hinges. Polymer based multicavity hollow section of 120 mm x30mm with 2.0 mm (+/- 0.2 mm) wall thickness will be fitted in the middle, reinforced by solid polymer bar of 200 mm long at both ends and screws from both sides as lock rail. The section frame will then be fitted in by PVC panels of size 100 mmx25 mm with wall thickness of 1.2 mm (+/- 0.2 mm) and 2 nos. of 6 mm dia bright rod will be inserted horizontally with both side check and nut system and stretches where fixing of hinges / hasp bolt / tower bolt / door ring are required to be strong enough to with stand wear and tear. The rate is inclusive of cost of all materials, labour, and hire of tools and plants and appliancesi/c carriage of all materials taxes and all other incidental charges complete.

36

-

-

... More
M.S. works in framed gratings of window etc. made of round or square bars and frame work or M.S. flats (with the bars securely fixed to the flat bar frame) with or without intermediate flat bar stiffener and fixed with necessary screws etc. complete, as directed. In ground floor. (Weighing about 35.025 Kg./sq.mtr), for : Windows

5.04

-

-

... More
-Do- at : 1st Floor

6.3

-

-

... More
-Do- at : 2nd Floor

3.78

-

-

... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. for : Doors

291.57

-

-

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. for : (i) Steel Windows (ii) Doors (iii) Grills

481.49

-

-

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary (a) On timber or plastered surface : With super gloss (hi-gloss) (iv) Two coats (with any shade except white)

291.57

-

-

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)

481.49

-

-

... More
Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface. Two Coats, for : (i) interior walls of Rooms including Dining & Kitchen(ii) Toilet Block (iii) At 1st Floor : Interior Walls of Rooms(iv) Toilet Block (v) At 2nd Floor : Interior Walls of Rooms(vi) Toilet Block (vii) At 3rd Floor : Interior Walls of Roomsv (viii) Toilet Bloxk Deductions for : (i) Door Openings (ii) Window Openings(iii) 0rnamental Grills of verandah

4585.87

-

-

... More
Cement washing including cleaning and smoothening surface thoroughly (cement to be used @15 kg./100 sq.m. of surface for one coat and @25 kg./100 sq.m of surface for two coats): External surface (Ground floor) (a) One coat N.B. : Extra for each additional floor in external walls refer item 20 for : (i) Interior walls of the existing Building (ii) Toilet Block (iii) Exterior Walls (iv) Chajja

1793.79

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 1st floor for : (i) Inside walls of the existing Hostel Building (ii) Toilet Block (iii) Exterior Walls (iv) Chajja

1806.28

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 2nd floor

1806.28

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 3rd floor

11.31

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, over the Roof of 3rd floor, for : Parapet Walls

173.54

-

-

... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. - In Ground Floor: - One Coat

351.61

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 1st floor

315.87

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 2nd floor

315.87

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 3rd floor

315.87

-

-

... More
-Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, over the roof of 3rd floor, for Parapet Walls

173.54

-

-

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In Ground floor: (iii) Two coats.Deductions for : (i) Door Openings (ii) Window Openings

311.5

-

-

... More
-Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 1st floorDeductions for : (i) Window Openings(ii) Grills

271.22

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 2nd floor

271.22

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, at 3rd floor

271.22

-

-

... More
Do- Add extra for each additional floor over the rate for ground floor on items (3 to 6) and item (8), (15 to17) of subhead A - External surface - Upto 4th floor, over the roof of 3rd floor, for Parapet Deductions for : (i) Door Openings Walls

171.54

-

-

... More
Cleaning and removing paint mark from glass pane with spirit and removing strains etc.

139.7

-

-

... More
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete. (In all floors for internal wall & upto 6 M height for external wall) - 4 mm thick : Extra for fixing glass panes in steel window. for : Ground and 1st Floors

66.81

-

-

... More
Do- Note:- Add 5% extra for each 6 Mtr. height or part thereof beyond the initial height of 6 Mtr. for item A (1 to 5) & B (10) only. This extra rates is applicable for external works. For maintenance work, 20% extra on the rate of corresponding item to be added.

66.81

-

-

... More
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete. - A) UPVC Pipes: (ii) 110 mm. Dia.

99.2

-

-

... More
Do-B) UPVC Fittings: c) Bend 87.5 degree - (ii) 110 mm. Dia.

8

-

-

... More
Supplying, fitting and fixing Shallow water closet Indian pattern (I.P.W.C.) of approved make in white vitreous chinaware in position (excluding cost of concrete for fixing).-510 mm long

12

-

-

... More
Supplying, fitting and fixing 10 litre P.V.C. low-down cistern conforming to I.S. specification with P.V.C. fittings complete, C.I. brackets including two coats of painting to bracket etc.

12

-

-

... More
Supply of UPVC pipes (B Type) conforming to IS-13592-1992 - Double Socketed 3 Meter Length - 110 mm

170

-

-

... More
Supply of UPVC pipe fittings : (i) Coupler - 110 mm.

24

-

-

... More
(ii) Door Tee - 110 mm.

24

-

-

... More
(ii) Bend 87.5º - 110 mm.

12

-

-

... More
(iii) Vent Cowl - 110 mm.

4

-

-

... More
(iv) W.C. Connector (450 mm long) W / lipring - 75 mm.

12

-

-

... More
(v) 125/110 P Trap with W.C. Ring - 75 mm.

12

-

-

... More
Supplying, fitting and fixing white vitreous china best quality approved make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks, C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved quality P.V.C. connection pipe with heavy brass C.P. nut including painting the brackets with two coats of approved paint - 550 x 400 mm. size

8

-

-

... More
Supply of G.I. short piece of TATA make (Above 50 mm & upto 150 mm) - (i) 20 mm

44

-

-

... More
(ii) 32 mm

25

-

-

... More
Supply of G.I. Union - (i) 15 mm

40

-

-

... More
(ii) 20 mm

40

-

-

... More
(iii) 25 mm

40

-

-

... More
(iv) 32 mm

40

-

-

... More
Supplying, fitting and fixing bib cock or stop cock. - Chromium plated Bib Cock short body (Equivalent to Code No. 511 & Model - Tropical / Sumthing Special of ESSCO or similar brand).

45

-

-

... More
Supplying, fitting and fixing shower of approved brand and make. - Chromium plated round shower with revolving joint 100 mm dia with rubid cleaning system (Equivalent to Code No. 542(N) & Model - Tropical / Sumthing Special of ESSCO or similar brand).

16

-

-

... More
Supplying, fitting and fixing gunmetal wheel valve of approved brand and make tested to 21 kg per sq. cm. (for water lines only). - (i) 50 mm dia

2

-

-

... More
(ii) 32 mm dia

2

-

-

... More
(iii) 25 mm dia

2

-

-

... More
(iv) 20 mm dia

2

-

-

... More
Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all round and cement brick work (1:4) upto 0.90 metre from top with 20mm thick cement plastering (1:4) to inside face upto the depth of cement brick work, 15mm thick cement plaster (1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal (50 mm to 63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C. manhole cover (heavy type)of approved make supplied, fitted and fixed in the cover slab with necessary fittings, making nacessary arrangements for pipe connections, excavation of well including shoring, dewatering and removing the exess earth from the premises as per direction complete in all respect with all costs of labour and materials. With 250 mm thick dry brick work and 250 mm thick cement brick work (1:6) and 1.00m inside dia : For SAIL/TATA/RINL

1

-

-

... More
Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials - With Pakur variety (SAIL/TATA/RINL)

2

-

-

... More
Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer - 2000 litre capacity

3

-

-

... More
Labour for hoisting plastic water storage tank - Above 1500 litre upto 5000 litre capacity - Extra for each additional story (At 4th story)

3

-

-

... More
Supplying, fitting and fixing PVC pipes of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) (a) For Exposed Work PVC Pipes : (i) 15 mm. dia.

15

-

-

... More
(ii) 20 mm. dia.

80

-

-

... More
(iii) 25 mm. dia.

40

-

-

... More
(iv) 32 mm. dia

40

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.