District Magistrate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
District Magistrate - DM Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date11 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 2,99,674
Costs
EMD
₹ 5,993Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DMM_798644_1Tender No
09(e)/OMPS /2024-2025_17Tender Authority
District Magistrate ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement concrete with graded stone chips ballast ( 40mm ) down size excluding shuttering in all floor. i) 1:3:6 proportion.
3.78
4330
16367.4
... More
Ordinary Cement conrete (mix 1: 1.5 : 3) with graded stone chips (20mm size) excluding shuttering and re-inforcement If any, Pakur varieties.
17.64
5086
89717.04
... More
Re-inforcement for RCC works in all sorts of structures including intersection, complete as per drawing and direction . ( TOR Steel or Mild Steel)
1.11
64243
71221.72
... More
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steelsheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(P-316,I-18.05)
142.8
205
29274
... More
Plaster of wall, floor etc with sand and cement morter (1 : 6) including rounding off or champhering corners as directed. (i) 20 mm thick plaster.
75.6
163
12322.8
... More
Neat cement punning about 1.5 mm thick in wall, dado, window sills floors, drains etc. in Ground Floor.
75.6
34
2570.4
... More
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in- Charge. (The rate is inclusive of cost of reinforcement,concrete, shuttering, nuts & bolts, washer etc.complete.) [Schedule P.W.D Vol III Page No- 263, I- 8.07]
1
2230
2230
... More
Earth work in filling in foundation treanches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (P.W.D schedule page No.04 & item No.3a).a) With earth obtained from excavation of foundation.Total Quantity = 1/5 of excavated earth.
6.56
77
508.4
... More
Add GST @ 18%
1
45260
45260.44
... More
Add Cess @ 1 %
1
2967
2967.07
... More
Fractional Daviation
1
-
-
... More
Total
1
299674
299674