District Magistrate Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
District Magistrate Tender
Civil And Construction
Building Construction
Eprocure
Opening Date17 Jan 2025
Closing Date10 Feb 2025
Tender Amount₹ 11,45,401
Costs
EMD
₹ 22,908Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DMHGP_798974_1Tender No
91-BCWTD/HugTender Authority
District Magistrate ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Single Brick Flat Soling …. And Filling Joints with Local Sand , Page no- 14/1, 3rd Corrigendum. B F S Area =76X0.75MX0.75M= 42.75Sq.M. and Main Entry Columns footing B F S Area =2X1.8MX1.8M= 6.48 Sq.M Tie Beam trench =135.73 Mtr-76X0.75Mtr-2X0.9Mtr.=135.73Mtr.-57.0Mtr-1.8mtr=76.93Mtr.. 76.93MtrX0.25Mtr=19.232 Sq.M. Therefore Total B F S Area= 68.382 Sq.M.
68.38
357
24412.37
... More
Cement Concrete with graded kJhama Khoa 30 MM Size Excluding Shuttering in Ground Floor and Foundation a ) 1:3:6 Proportion below footing . Page No-23/1-1A 3rd Corrigendum . Jhama Khoa Concrete Volume=120X0.75MX0.75MX0.10M=6.75 Cu.M. and Main Entry Columns footing Jhama Khoa Cement Concrete Volume=2X1.8MX1.8MX0.10M=0.972Cu.M Tie Beam trench =135.73 Mtr-76X0.75Mtr-2X0.9Mtr.=135.73Mtr.-57.0Mtr-1.8mtr=76.93Mtr.. 76.93MtrX0.25MtrX0.10Mtr.=1.923 Cu.M.
9.65
4778
46083.81
... More
Ordinary Cement Concrete ( mix 1:1.5:3) with Graded stone chipps ( 200 MM nominal Size ) excluding shuttering and reinforcement , if any , in Ground Floor as per relevant IS Codes , footing for RCC Column , Tie Bveams , ( 250MM X 300M M) Cfoping , Page 24/4( i ) , 3rd Corrigendum) . Columns=76X2.625Mtr.X0.25MtrX0.25Mtr=12.468Cu.M. Column Pedestals=76X0.75MtrX0.75MtrX0.30M=12.825Cu.M. Column Pedestal Sloping Portion=
( 0.75MtrX0.75Mtr+0.25MtrX0.25Mtr)+2X0.1Mtr=(0.562+0.062)/2X0.1M
t=0.031Cu.M.
Tie Beams’ Concrete length=2X(40+30) Mtr-76X0.25Mtr=140Mtr-19Mtr=121Mtr.
Tie Beam Concrete Volume=121MtrX0.25MtrX0.25Mtr=7.562Cu.M.
Coping Beam=121MtrX0.25MtrX0.125Mtr=3.781Cu.M.
TOTAL CONCRETE ( 1:1.5:3) VOLUME=36.667Cu.M.
36.67
5950
218202.02
... More
Reinforcvement for Reinforced Concrete Works in all sorts of Structurews including distribution bars , Stirrups, Binders etc. Initial straightening and removal of Loose rust , if necessary ) , Cutting to resitite length , hooking and bending to correct shape , placing in proper position and binding with 16 gauge black annealed wire at every intersection , pomplete as per drawing and direction for woirk in foundation , basement and upoto roof of ground floor by up to 4 M, Tor Steel, Page No-43/40(ii) 10th Corrigendum. Providing TOR STEEL-Fe-550( I.S.I Marked) @ 1.2 % of Concrete Volume=1.2%X36.667Cu.MX7850K.G./Cu.M.=3454.03 K.G.=3.45403M.T.
3.45
60003
207252.16
... More
Hire and Labour Charges for Shuttering and Centering and necessary stagging up to 4 M using stout Props and thick hard wood planks of approved thickness with required bracing for concrete slabs , Beams and Coluumns and lintels , Culvert or Curved or Straight including fitting fixing and Striking out after completion of work ( up to Roof of Ground Floor 0 a) 25 mm to 30 mkm Thick wooden Shuttering as per decision of E-in-C. . Page No-42/36(a) . Column Footings 76X2X(0.75Mtr+0.75Mtr)X0.30Mtr=68.40 Sq.M.
Columns=76X2X(0.25Mtr+0.25Mtr)X2.625Mtr=199.50 Sq.M.
Tie Beam Length=121Mtrx0.25MtrX2 ( Both Sides)=60.50 Sq.M.
Coping Beams=121X0.125MtrX2 ( Both Sides)=30.25 Sq. M.
TOTAL AREA OF SHUTTERING=358.65 Sq.M.
358.65
334
119789.1
... More
125 MM thick Brick Work with 1st Cklass Bricks in Cement mortar 1:4 in Ground Floor . Page No-16/16 3rd Corrigendum CLEAR LENGTH OF TIE BEAM ( as the Brick Work is over the Tie Beams) 121.0 MtrX1.675Mtr=202.675Sq.M.
202.68
722
146331.35
... More
M.S or W.I Omanmental grill of approved design joints continuouskly welded with M.S W.I Flats and bars of windows, ralling etc. fitted and fixed with necessary screws and Lungs in Grtound Floor , Grill weighing above 16 KG Per sq. M and Above. Page No- 104/13 , 3rd Corrigendum. 4.2 MtrX1.8Mtr=7.56 Sq.M.X 16 K.G.=120.96 K.G.=3.024 Qntle
3.02
9696
29320.7
... More
Plaster ( To wall, floor, Ceiling etc. ) with sand and cement mortar including rounding off or chamferring cormners as directed and racking out joints including throating , nosing and drip course , scaffolding , stagging where necessary ( ground Floor) Page -164/2 3rd Corrigendum 135.73 MtrX1.80MtrX2=488.628 Sq.M.
Top of Coping Beam=135.73MtrX0.25Mtr=33.932sq.M.
TOTAL=522.56 Sq.M.
522.56
144
75248.64
... More
Neat Cement Punning about 1.5 MM thick in wall , dado , window seal , Floor etc. , Note - Cement -0.15 2 Cu. M. Per 100 Sq. M. Page 192/15 2x135.73MtrX0.35Mtr=95.011 sq.M.
95.01
32
3040.35
... More
Priming one coat on steel or other Metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. . Page -176/7, Area same as Grill Gate areaX Multiplying Factor=7.56 Sq.M.X1..8=13.608Sq.M.
13.61
29
394.63
... More
Painting on Grill gate with best quality synthetic enamel paint of approved make and brand including smoothening surfces by sand papering including using approved putty etc. on the surface if necessary ( b ) on Steel or other metal surfaces with super Gloss ( Hi Gloss ) , Two Coats with any shade except white . Area same as Grill Gate areaX Multiplying Factor=7.56 Sq.M.X1..8=13.608Sq.M.
13.61
79
1075.03
... More
Applying exterior grade acrylic primer of approved quality and brand of plaster or concrte surfce old or new surface to receive decorative textured ( mat Finish ) or Smooth finish acrylic exterior emulsion paint including scrapping and preparing the surface Thoroughly , Complete as per manufacturer' s specification as pewr direction of the E-iin- C. , In Ground Floor , One Coatb e, Page -196/7 Area Same as plastered area=522.56 Sq.M.
522.56
31
16408.38
... More
Protectyive and Decorative Textureed Exterior High Class Mat Finish Paint of Approved quality , composed special thermoplastic resincontening fine crystalline additive derived from granite as per manufacturer's specificationj and as per direction of the E-in-C to the applyied over acrylic primer as required . The rate includes the cost of Materials labours , scaffolding and all incidental charges but excluding the cost of primer in ground floor, Two Coats Out side, page -173/18 Area Same as plastered area=522.56 Sq.M.
522.56
101
52778.56
... More
Providing and fixing Concrete Sign Board as per IRC Specification of Size 900X750X37 MM Thick made with RCC1:1.5:3 with Pakur variety stoione chipps rteinforced with double layer IRC Fabric 75X75MM mesh fixed with necessary nuts and bolts on two Rc precast post 100MM X 150MM height 2.65 M of which top 750mm is of section 100X13mm and 1.5M above GL and 0.75 M below GL including digging hole s , repacking the same with cement concrete 1;3:6 with jhama khoa or with local astomne chips complewte including paintoing two coats on both faces lettering etc . ( The rate in is inclusicvve of cost of reinforcement concrete shuttering , nuts and bolts , washer etc. page No-270, Item No-8.07 of PWD Scvhedule of Roads and Bridges .
1
2230
2230
... More
Adding 18% Total GST
1
172992
172992.31
... More
Adding Labour welfare cess @ 1%
1
11340
11340.61
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%