Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
District Magistrate Tender
Civil And Construction
Building Construction
Eprocure
Opening Date28 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 3,47,127.7 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 10,000Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Memo No 193 Nez Dated 28.01.2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DMBAK_807660_1Tender No
193/Nez Dt-28.01.2025Tender Authority
District Magistrate ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
First class kiln burnt bricks in cement morter (6:1) including curing bricks,racking out joints,scaffolding etc. complete [ Rate from PWD SW schdule 2017 Page no-15 Item -8 (a) & 3rd corrigenda Sl. No. - 4(a), Page no.- 2] (A) Superstructure
10.2
4728
48225.6
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in
ground floor [3rd corrigenda Sl.no-8,P-3]
3
625
1875
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Including cost of chipping over concrete surface] C) 20 mm. Th. Sand cement plaster (6:1) to walls [ Rate from PWD SW schdule 2017 Page no-189 Item -1(i) © & 3rd corrigenda Sl. No. - 1, Page no.- 50]
96.51
153
14766.03
... More
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make
(excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made
on area of finished work) In roof 0.5 mm thick sheet. [Item No. - 14(a) , Page No. - 83]
58.06
896
52021.76
... More
Galvanised iron sheet ridging fitted with necessary bolts,
screws, washers etc complete.(225mm end lapping) 450 mm lapping each way With 0.63 mm sheet . [ Rate from PWD SW schdule2017 Page 81 Item no -10 A) b)]
7.5
490
3675
... More
Synthetic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer's specification) including cleaning and smoothning of surface.. [ Rate from PWD SW schdule2017 Page 196 Item no -11]
228.39
68
15530.52
... More
M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size,
fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as
electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The
rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. i) For trusses spanning up to 12.00 m [Rate from PWD SW schdule 2017 Item No. - 2(i).,Page No. - 100 & 3rd corrigenda Sl.no-2,P-85 ]
1150.14
72
83902.71
... More
M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. [ Rate from PWD SW schdule 2017 Page No.-104 Item -13(a) ; 3rd Corri Page no-91, Sl. No-10] (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
0.81
9880
8002.8
... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. [ Rate from PWD SW schdule2017 Page 200 Item no -1(a)]
55
29
1595
... More
Painting two coat on steel surface with synthetic enemel of approved make and brand including smoohtening surfaces by sand papering etc. including using of approved putty etc. on the surface if necessary [ Rate from PWD SW schdule2017 Page 200 Item no -2A(b)(ii)]
55
72
3960
... More
Adding for Electrification @ 10 % =
1
26478
26478.45
... More
Adding GST @18%
1
52427
52427.34
... More
Addding Labour Cess @1%
1
3436
3436.9