Department Of Urban Development And Municipal Affairs Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Department Of Urban Development And Municipal Affairs Tender
Civil Works Roads
Eprocure
Opening Date5 Feb 2021
Closing Date24 Feb 2021
Tender Amount₹ 4,72,75,945
Costs
EMD
₹ 9,45,519Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UDMA_323439_1Bid Award Id
ViewTender No
UDMA/SE-VI_ITA/05/2020-21Tender Authority
Department Of Urban Development And Municipal Affairs ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H(5th Revision) i) Grading – I
1350
-
2482.78
... More
Brick edging75mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction. (a) Brick-on-end edging (250 mm) depth
4000
-
89.13
... More
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub-base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision)
900
-
2736.15
... More
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm).
9000
-
34.7
... More
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
18000
-
11.07
... More
Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Grading -2 (19 mm nominal size . 50-75 mm thick) (iii) Using Drum mix Type HMP of minimum capacity 40-60 TPH.
707
-
6516.09
... More
Semi-dense Bituminous Concrete Providing & laying Semi-dense Bituminous Concrete (SDBC) as wearing coarse by Hot Mix Plant, using coarse aggregates, fine aggregates, filler materials and binder of required specification and grading as per approved job mix formula, over thoroughly cleaned surface coated with tack coat, including screening, cleaning of aggregates, mixing the components as per approved Job Mix Formula with hot binder, carrying the mixture by tipper truck or any other approved suitable arrangements, laying the mixture uniformly, maintaining the specified laying temperature, thorough rolling with power roller with necessary hand packing and pinning to give an uniform surface to achieve the desired density of at least 98% of that of Laboratory Marshall specimen, including the cost and carriage of aggregates, filler and binder, heating the binder, preheating the aggregates, and filler to the specified temperature, including the hire charges of Hot Mix Plant and other machineries, pay of operators, cost of fuel and lubricants and all other incidental charges complete. For Grading 2 (10 mm nominal size, 25-30 mm thick.) (i) Using Drum mix Type HMP of minimum capacity 40-60 TPH.
205
-
7761.42
... More
Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30.
4800
-
12.2
... More
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed (i) 200 mm diameter
46806.5
-
305
... More
Supplying, fitting and fixing M.S iron shoe to Jhaw/ Eucalyptus bullah piles including necessary cleats, nails etc. complete. a) For bullahs above 10 cm & up to 20 cm av. Diameter
7201
-
180
... More
Labour for driving Sal-bullah / Eucalyptus bullah pilesby monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (Driven by Pile engine with out Staging) (i) 200mm diameter
32404.5
-
123
... More
Coal tarring on wooden surfaces including cost of materials (a)Single coat
29414
-
22
... More
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site. a) Width of thinner end above 10 cm. and less than 15 cm. (i) Jhaw / Eucalyptus
3600
-
104
... More
Supplying empty Cement bags in good condition.
5000
-
3.3
... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
5000
-
3.5
... More
Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
29
-
119.27
... More
Filling in foundation or plinth by sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) a) Do- by fine sand.
4
-
1317.14
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
27
-
361
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement ,if any, in ground floor as per relevant IS codes. a) Pakur Variety
2
-
5701.91
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. a) Pakur Variety
10
-
6078.58
... More
Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor)
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
17
-
335
... More
b) 25 mm to 30 mm shuttering without staging in foundation.
8
-
209
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction a) For works in foundation and upto roof of ground floor/upto 4 m. I. Other than SAIL/ TATA/RINL (i) Tor steel/Mild Steel
1.2
-
54656.42
... More
Brick work with 1st class bricks in cement mortar (1:4) a) In foundation and plinth
5.3
-
5614.18
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (a) 15 mm thick plaster
17
-
163.22
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
17
-
32.74
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (i) 25 mm. thick
14
-
266.02
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
15.14
-
77.54
... More
Earth work in filling in compound, tank, lowland, ditches etc with good earth, inlayers not exceeding 150mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work (i) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth.
2608.47
-
419.58
... More
Drum Sheet Walling 1.40m (av.) high on Sal-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fixing 3 nos. of half bullah pieces (from 10 cm dia.) and drum(empty bitumen) sheet (approved condition) of height 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete as per direction. i) Using Eucalyptus bullah
700
-
1569
... More
Construction of Embankment with Material Deposited from Roadway Cutting. Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 for Rural Roads of MORD including carriage of material for a distance of 1 km.
3600
-
46.8
... More
Construction of Sub grade and Earthen Shoulders Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement
4000
-
94.8
... More
Add GST 12% on Item no 1 to 33
1
-
5015128.52
... More
Add Labour cess 1% on Item 1 to 34
1
-
468078.66
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements