Department Of School Education Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Department Of School Education - DSE Tender
Civil And Construction
Building Construction
Eprocure
Opening Date17 Mar 2023
Closing Date24 Mar 2023
Tender Amount₹ 6,51,636
Costs
EMD
₹ 13,033Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
T-43-repairing And Renovation Works At Different Schools Of Nagrakata Block Under District Of Jalpaiguri
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DSE_494616_1Bid Award Id
ViewTender No
SSA-JAL/T-43-NAGRAKATA(R)22-23Tender Authority
Department Of School Education ViewPurchaser Address
-Website
http://http://www.wbsed.gov.in/default.html
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
REPAIRING AND RENOVATION WORKS AT DIFFERENT SCHOOLS OF NAGRAKATA BLOCK UNDER DISTRICT OF JALPAIGURI
BOQ Items
PWD(WB), BUILDING WORKS, Page-02,Item-4 Earthwork in filling in foundation trenches or plinthby silver sand in layers not exceeding 150 mm. as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand complete. a ) By excaveted earth
1.8
937
521.07
PWD(WB), BUILDING WORKS, Page-14, Item-1 Single brick flat soling of Picked Jhama Bricks including ramming and dressing the bed to Proper level and filling joints with powdered earth or local sand.
9
2916
324
PWD(WB), BUILDING WORKS, Page-35, Item-22(ii)a Cement Concrete with 30mm down graded Shingles excluding shuttering (1:3:6) in foundation :
6.75
22902
3393
PWD(WB), BUILDING WORKS, Page-15,Item-8(a) Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth.
2.25
11016
4896
PWD(WB), BUILDING WORKS, Page-26,Item-10(ii) Ordinary cement concrete ( mix 1:1.5:3) with graded stone chips (20mm down excluding shuttering and reinforcement,if any in ground floor. As per relevent I.S. Codes. b). River bazree.
7.5
35587
4745
PWD(WB), BUILDING WORKS, Page-43, Item-40(ii) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) ground floorI. TATA TISCON, SAIL…..
0.38
24938
66502
PWD(WB), BUILDING WORKS, Page-42, Item-36(f) Hire and labour charge for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to 1st floor) A) 25 mm. to 30 mm. thick wooden shuttering without staging in foundation.
30
6150
205
B) 25 mm. to 30 mm. thick wooden shuttering as per decission & direction of E-I-C. at ground / 1st floor.
9
2952
328
PWD(WB), BUILDING WORKS, Page-16, Item-16 125 mm. thick brick work with 1st class bricks in cement mortar (4:1) in Ground floor.
21
14154
674
PWD(WB), BUILDING WORKS, Page-114, Item-1 C Wood work in door and window frame fitted and fixed complete including a protective coat of painting at the contact surface of the frame. At 1st floor.(The quantum should be corrected upto three decimals)
0.18
12943
71907
PWD(WB), BUILDING WORKS, Page-123, Item-10(b)iii Z-batten shutter of door and window as per design having tongued and groove half lap joint as per direction of the E-I-C including fitting and fixing shutter in position,but excluding the cost of hinges and other fittings in 1st floor. B) Shutter with 19 mm thick planks 19 mm thick battens. Sisu, Gamar, Champ, Badam, Bhola, Morga, Hallak
6
15696
2616
PWD(WB), BUILDING WORKS, Page-107, Item- 20(b) Supplying, fitting and fixing windows and ventilators with or without integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction protecting type, box type hinges, glazing clips, lugs locking bracket, handle plate etc. including hoisting in position, straightening if required, fixing lugs locking bracket, handle plate etc, including hosting in position, straightening if required, fixing lugs in cement concrete (1:2:4) with stone chips 20 mm down cuttings holes and mending good damages to match with existing surface complete in all respect excluding glazing.In Ground Floor :Flash butt welded windows and ventilators(No shop priming will be allowed to facilate inspecation of workmanship)Without integrated grills.b)Openable steel windows as per IS sizes with side hung shutters and horizontal glazing bars with/without fixed type ventilators.
6.3
13853
2199
PWD(WB), BUILDING WORKS, Page-105. Item-15 Supplying 1.5 mm thick MS sheet fitted & fixed on one or both faces of MS / WI gate etc with point weilding at not more than 150 mm apart complite….. Materials.
6.3
8215
1304
PWD(WB), BUILDING WORKS, Page-189. Item-1 Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary (ground floor). ii) with 4:1 cement mortar i) 20 mm. thick plaster
90
16290
181
ii)15 mm. thick plaster
60
9420
157
iii) 10 mm. thick plaster
30
3780
126
PWD(WB), BUILDING WORKS, Page-100, Item-65 Artificial stone in floor,dado, staircase etc. with cement conctrete (4:2:1) with stone chips laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (2:1) including smooth finishing and rounding off corners and including application of cement slurry before flooring works, using cement @ 1.75 kg./sq.m. all complete including all materials and labour.In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted) with ordinary cement. In 1st floor. 20 mm. Thick
65.25
17617
270
PWD(WB), BUILDING WORKS, Page- 140, Item-4 c M.S. clamp for fixing door and window frame made of flat bent bar, end bifurcated, fixed in cement concrete with stone chips (4:2:1) fitted and fixed complete as per direction.Cost of cement concrete will be paid separately). 40 mm.x 6 mm. 125 mm. length.
18
450
25
PWD(WB), BUILDING WORKS, Page-64, Item-35 Supplying , fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work 4nos of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement (A) Floor with sand cement mortar (1:3) 15mm thick cement slurry at back side of tiles using cement @2.91 kg/Sq.m & joint filling using white a) Area of each tiles upto 0.09Sq.m i)Coloured decorative
45
33030
734
PWD(WB), BUILDING WORKS, Page-64, Item-35 (B) Wall with sand cement mortar(1:3) 15mm thick & 2 mm thick cement slurry at back side of tiles using cement @2.91kg/Sq.m & joint filling using white a) Area of each tiles upto 0.09Sq.m i) Coloured decorative.
90
67050
745
PWD(WB), BUILDING WORKS, Page-146, Item-30 Anodised aluminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S.230/72) fitted and fixed complete: With continuous plate base (hexagonal/round rod) 125 mm grip x 10 mm dia rod
12
1140
95
PWD(WB), BUILDING WORKS, Page: 140 Page-5 Iron butt hinges of approved quality fitted fixed with steel screws, with ISI mark. 75 mm x 40 mm x 1.12 mm
12
336
28
100 mm x 50 mm x 1.25 mm
18
774
43
PWD(WB), BUILDING WORKS, Page-192, Item-15 Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
15
510
34
PWD(WB), BUILDING WORKS, Page-104, Item-13(i) (a) M.S. or W.I. ornamental grill of approved design joints continuously welded with M.S., W.I. flats and bars for windows ,railing etc. fitted and fixed with necessary screws and lugs in 1st floor. Grill weighing above 10 kg./sq.m.and upto 16 kg / sq.m.
1.62
16234
10021
PWD(WB), BUILDING WORKS, Page-101, Item-2(a) M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete
0.9
66855
74284
PWD(WB), BUILDING WORKS, Page-197, Item-15 Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer"s specification: i) In Ground floor :b) Two coats
1050
51450
49
PWD(WB), BUILDING WORKS, Page-194, Item-1(b) White washing including cleaning and smoothing surface throughly .........Two Caots
2250
45225
20.1
PWD(WB), BUILDING WORKS, Page-200, Item-1(b) Priming one coat on timber or plastered surface with synthetic oil bound prinmer of approved quality including smoothening surfaces by sand papering etc.
18
684
38
PWD(WB), BUILDING WORKS, Page-200, Item-1(a) Priming one coat on steel or other metal surface with synthetic oil bound prinmer of approved quality including smoothening surfaces by sand papering etc.
15
435
29
PWD(WB), BUILDING WORKS, Page-200, Item-2(a) (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand parpering etc. including using of approved putty etc. on the surface, if necessary. (a) On timber or plastered surface:With super gloss (hi-gloss)iv) Two coats (with any shade except white)
15
1215
81
(b) On steel or other metal surface:With super gloss (hi-gloss)iv) Two coats (with any shade except white)
15
1185
79
PWD(WB), BUILDING WORKS, Page-81, Item-9 Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor) (i) In Roof:-a) With 0.60 mm thick sheet
18
11142
619
PWD(WB), BUILDING WORKS, Page-81, Item-10 Galvanised Iron sheet ridging fitted with necessary bolts screws,, washers, etc complete (225 mm end lapping) 300 mm.lapping each waya) With 0.60 mm thick sheet
10.8
3952
366
PWD(WB), BUILDING WORKS, Page-11, Item-8 Taking out carefully GCI or CI or Asbestos sheets (including Ridges etc.) from roof or wall after unscrewing bolts nuts screws etc. and stacking the materials at site as directed.
15
615
41
PWD(WB), BUILDING WORKS, Page-1, Item-1 Surface dressing of the Ground in any kind of soil........
450
4500
10
Repairing of Electrical Works.......
3
3000
1000
Repairing of S & P Work....
3
3000
1000
Repairing of Table & Bench Work....
3
3000
1000
Supplying fitting and fixing of Signboard and cost of photograph (payment will be made as per voucher)
3
3000
1000
GST 18%
1
98418
98418.06
Cess 1%
1
6451
6451
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements