Department Of School Education Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Department Of School Education Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date20 Dec 2024
Closing Date13 Jan 2025
Tender Amount₹ 31,48,596 
Notes
Download

Costs

Summary

Construction Of Double Storried School Building At Bhabta Rashidia J.b. School Sargachi Circle.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

160.52

368

59194.96

... More
Cement concrete with graded stone ballast (40mm size excluding shutterring) Pakur variety 6:3:1 proprtion

13.91

5869

81625.44

... More
Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth

19.5

5574

108703.73

... More
Brick work with 1st class bricks in cement mortar (1:6) In superstructure, ground floor

30.13

5826

175561.79

... More
Brick work with 1st class bricks in cement mortar (1:6) In superstructure, First floor

11.4

5952

67857.02

... More
125mm Brick work with first class bricks in cement morter (4:1)

156.09

765

119533.01

... More
In 1st floor

12

779

9352.8

... More
75mm Brick work with first class bricks in cement morter (4:1)

18.5

529

9793.9

... More
Ordinary cement concrete (mix 3:1.5:1) with graded stone chips--etc (i) Pakur variety.

79.61

6810

542138.44

... More
1st Floor level

13.5

6917

93387.06

... More
Hire and labour charges for shuttering with cantering and necessary staging…after completion of work (Foundation Level.) 25mm. To 30mm. Thick wooden shuttering as per.

16.72

231

3877.37

... More
Hire and labour charges for shuttering with cantering and necessary staging…after completion of work (Foundation Level.) 25mm. To 30mm. Thick wooden shuttering as per.

641.24

373

239373.77

... More
Hire and labour charges for shuttering with cantering and necessary staging…after completion of work (Foundation Level.) 25mm. To 30mm. Thick wooden shuttering as per.

205

393

80700.3

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. For works in foundation, basement and upto roof of ground floor/upto 4m Tor steel/ Mild Steel JSW/ SHYAM/ JSPL/ SRMB/ BMAS/ SSL assume 1.3% of the Volm of RCC

8.12

67875

551148.25

... More
First Floor

1.27

68361

86819.49

... More
Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 00mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement oncrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete. Ground floor

8.97

4898

43921.26

... More
M.S. or W.I. Ornamental gril of approved design joints continuously welded with M.S, WI. Flats and bars of windows. Railling etc. fitted and fixed with necessary screws and lugs in ground gloor. (i) Grill weighing above 10 Kg/sq. mtr and up to 16 Kg/sq. mtr. Qntl For above Boundary wall

2.64

11185

29473.27

... More
First Floor

0.88

11297

9918.91

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 20 mm thick plaster (i) 15 mm thickness

181.07

184

33387.31

... More
First Floor

120

188

22669.2

... More
(c) 15 mm thick plaster. Ground Floor

522.84

178

93446.48

... More
First Floor

180

183

32985

... More
With 1:4 cement mortar Ground Floor (c) 10 mm thick plaster

423.16

143

60790.73

... More
First Floor

72

148

10669.68

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

497.33

38

19127.31

... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). Neem, Jam, Jackfruits

0.67

60018

40392.11

... More
First Floor

0.21

60244

12470.57

... More
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made) 25mm thick shutters with 12mm thick panel of size 30 to 45 cm. Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak.

39.2

2430

95293.24

... More
First Floor

12.76

2463

31437.45

... More
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (a) 40mm X 6mm, 250mm Length

376

32

12332.8

... More
Oxidised Iron socket bolt of approved quality fitted and fixed complete. 150mm long x 10mm dia bolt.

86

71

6129.22

... More
Oxidised Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. 100mm. X 50mm. X 1.25mm.

276

48

13424.64

... More
Anodised aluminium D-Type handle of approved quality ……..(a) With continuous plate base (Hexagonal/Round). (vii) 150mm grip x 12 mm dia rod Door

16

125

2008.96

... More
i) Oxidised Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (c) 250mm long.

32

179

5755.52

... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement 25 mm. thick

340.22

298

101603.3

... More
In 1st floor

60

303

18187.2

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. Two coats

120

55

6651.6

... More
In 1st floor

120

59

7194

... More
Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

329.66

42

14172.08

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

48.32

32

1584.9

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On timber or plastered surface :With super gloss (hi-gloss) - Two coats (with any shade except white)

135.1

91

12379.21

... More
On steel or other metal surface : With super gloss (hi-gloss) - Two coats (with any shade except white)

48.32

89

4317.88

... More
Sanitary & Plumbing Works for all bathrooms and toilets & kitchen space and wash space(using I.S standard materials) at Ground & First Floor including one Septic Tank (20 users) and Soak Chamber.

1

121100

121100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.