Department Of Paschimanchal Unnayan Affairs Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Department Of Paschimanchal Unnayan Affairs - DPUA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date5 Jun 2023
Closing Date26 Jun 2023
Tender Amount₹ 1,80,13,107
Costs
EMD
₹ 3,60,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DPUA_539381_1Bid Award Id
ViewTender No
e-NIT No. 03/PUP/EC/BNK of 2023-24Tender Authority
Department Of Paschimanchal Unnayan Affairs ViewPurchaser Address
-Website
http://http://www.pupwb.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 1, Item no- 3 (a)
380.96
29539
77.54
Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 2, Item no- 4(B)
163.93
105056
640.86
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 14, Item no- 1
1350
437400
324
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 15, Item no- 8(a)
106.88
509452
4766.81
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 16, Item no-16
116.4
76423
656.56
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 26, Item no-10(i)
391.63
2163934
5525.5
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 24, Item no-4(a)
161.71
802700
4963.98
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 42, Item no- 36(a)
2854.6
1036219
363
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 43, Item no- 36(f)
876.6
179703
205
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 44, Item no- 40(a)(i) I
36.89
2031725
55075.23
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 47, Item no- 3
4390.74
105377
24
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as
necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
In ground floor.3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).
Using grey cement (ii) 25 mm. thick. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 48, Item no- 6(ii)
1649
424023
257.14
Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap.
(Payment to be made on area of finished work)(GCI sheet to be supplied by contractor) (i) In Roof:- a) With 0.60 mm thick sheet. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 81, Item no- 9(i) a
2017.42
1248784
619
Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping)
(A) 300 mm lapping each way
(a) With 0.60 mm sheet. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 81, Item no- 10(A) a
397.6
145521
366
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.
The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.
i) For roof truss works
a) Span up to 12 Mtr. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 101, Item no- 2(A)
18.66
1349633
72316
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:6 cement mortar (c) 15 mm thick plaster. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 189, Item no- 1(i) c
996.5
133242
133.71
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 192, Item no- 15
414.1
13607
32.86
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 200, Item no- 1(a)
749.55
21736
29
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(b) On steel or other metal surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white). (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 201, Item no- 2(b)(iv)
749.55
59214
79
Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly :
(ii) External surface (Ground floor)
(b) Two coats (on new works only). (i) Other than yellow, pink. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 195, Item no- 4 ii (b)(i)
565.6
12075
21.35
DRAINAGE WORK
-
-
-
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 1, Item no- 2 (a)
414
49377
119.27
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 1, Item no- 3 (a)
47.25
3663
77.54
Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 2, Item no- 4 (B)
25.88
16582
640.86
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 26, Item no- 10(i)
153
845401
5525.5
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 24, Item no- 4(a)
24.75
122858
4963.98
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 43, Item no- 36(f)
1215
249075
205
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 47, Item no- 3
1170
28080
24
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:6 cement mortar (c) 15 mm thick plaster. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 189, Item no- 1(i) c
930
124350
133.71
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m. (PWD BUILDING SCHEUDLE 30 Aug'18 upto date Page no- 192, Item no- 15
930
30559
32.86
PCC ROAD WORK (4.25 M WIDE)
-
-
-
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 240, Item no- 3.16(a)
637.5
9180
14.4
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 240, Item no- 3.16(b)
637.5
12112
19
Granular Sub-base with Graded Material
(Table:- 400-1)
B. By Mix in Place Method :
Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) Grading – II (Pakur Variety). (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 246, Item no- 4.08(B)(II)
97.54
138495
1419.91
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.
E PCC Grade M30
I) Using concrete mixer (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 286, Item no- 12.05
130.05
773209
5945.48
Filler joint
(iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 314, Item no- 14.13(iv)
140.25
2805
20
PCC ROAD WORK (2.5 M WIDE)
-
-
-
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 240, Item no- 3.16(a)
1250
18000
14.4
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 150 mm. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 240, Item no- 3.16(b)
1250
23750
19
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 245, Item no- 4.05
191.25
150142
785.06
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications.
E PCC Grade M30
I) Using concrete mixer (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 286, Item no- 12.05
255
1516097
5945.48
Filler joint
(iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight. (PWD ROAD & BRIDGE SCHEUDLE 30 Aug'18 upto date Page no- 314, Item no- 14.13(iv)
277.5
5550
20
Add: GST @18% on Total Cost of Civil Work
15114203.28
2720556
0.18
Add: Labour Walfare Cess @1% on Total Cost of (Civil Work + GST)
17834759.88
178347
0.01