Department Of Paschimanchal Unnayan Affairs Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Department Of Paschimanchal Unnayan Affairs - DPUA Tender

Works
Eprocure
Opening Date11 Nov 2020
Closing Date7 Dec 2020
Tender Amount₹ 35,09,216 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.W.D(W.B) Road Schedule of Rates P-244 It. no.4.08(B) B. By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) Grading – I (75mm thick 1st Layers) Pakur variety stone materials.

196.87

-

2213.86

... More
P.W.D(W.B) Road Schedule of Rates P-244 It. no.4.08(B) B. By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) Grading – I (75mm thick 2nd Layers) Pakur variety stone materials.

196.87

-

2213.86

... More
P.W.D(W.B) Road Schedule of Rates P-235 It. no.3.10 Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD.

787.5

-

27.9

... More
P.W.D(W.B) Road Schedule of Rates P-280 It. no. 12.05(F)(i) Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. F) RCC Grade M30 (Mix design required) I) Using concrete mixer Pakur variety stone materials.

525

-

6334.61

... More
P.W.D(W.B) Road Schedule of Rates P-306 It. no. 14.14(iv) Filler joint (iv) Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight

873.75

-

20

... More
P.W.D(W.B)Building Schedule of Rates P-47 It. no.03 Supplying & laying Polythene sheet over damp proof course or below flooring or roof terracing or in foun dation or in

2625

-

24

... More
P.W.D(W.B) Roads Schedule of Rates P-236 It. no. 3.14 Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement)

1512

-

94.8

... More
P.W.D(W.B) Roads Schedule of Rates P-242 It. no. 4.04 Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. local variety

78.75

-

346.68

... More
Cross Drainage Works (All items PWD schedule rates)

-

-

-

... More
P.W.D(W.B) Road Schedule of Rates P-278 It. no. 12.01(I)(a)(ii) Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (ii) With pumping out water excluding shoring

16.08

-

124

... More
P.W.D(W.B) Road Schedule of Rates P-280 It. no. 12.04 Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.

2.63

-

534.63

... More
P.W.D(W.B) Road Schedule of Rates P-280 It. no. 12.05(A) Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A PCC Grade M20 Pakur variety stone materials.

7.57

-

6122.27

... More
P.W.D(W.B) Road Schedule of Rates P-280 It. no. 12.05(A) Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A PCC Grade M20 Pakur variety stone materials.

1.01

-

6120.27

... More
P.W.D(W.B) Roads Schedule of Rates P-293 It. no. 12.21 Supplying, fitting and placing un-coated HYSD bar reinforcement in Bridge Foundation including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and be nt to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge

0.1

-

45334.94

... More
P.W.D(W.B) Building Schedule of Rates P-164 It. no. 2(ii)(b) Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (ii) With 1:4 cement mortar (b) 15 mm thick plaster

2.48

-

163

... More
P.W.D(W.B) Building Schedule of Rates P-195 It. no. 5(b) Cement washing including cleaning and smoothening surface thoroughly (cement to be used @15 kg./100 sq.m. of surface for one coat and @25 kg./100 sq.m of surface for two coats): External surface (Ground floor) (b) Two coats (on new works only).

2.48

-

14.24

... More
P.W.D(W.B)Building Schedule of Rates P-47 It. no.03 Supplying & laying Polythene sheet over damp proof course or below flooring or roof terracing or in foun dation or in

13.13

-

24

... More
GST @ 12 % as applicable on Bill amount.

0.12

-

4641157.92

... More
Labour Welfare Cess @ 1 % on sum of GST and Bill amount.

0.01

-

5198096.87



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.