Department Of Paschimanchal Unnayan Affairs Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Department Of Paschimanchal Unnayan Affairs - DPUA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date12 Dec 2023
Closing Date2 Jan 2024
Tender Amount₹ 1,21,67,869 
Notes
Download

Costs

Summary

Construction Of P.c.c Road With Side Drain At Opposite Colony Of Sunil Petrol Pump

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For depth upto 150 to300mm

4560

86640

19

... More
GSB : Granular Sub-base with Graded Material - By Mix in Place Method Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). GSB Grading-II:

695.33

897469

1290.71

... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. E PCC Grade M30 I) Using concrete mixer

880.05

5117297

5814.78

... More
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. Note: A separation membrane shall be used between the concrete slab and the sub-base. Separation membrane shall be impermeable PVC sheet 125 micron thick transparent or white in colour laid flat with minimum creases.

5587.56

134101

24

... More
JOINT SEALING COMPOUND Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight.

975

19500

20

... More
Removal of Unserviceable Soil with Disposal upto 1000 metres Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per Technical Specification Clause 302.3.11 for Rural Roads of MORD. (Mode of measurement: pre works and post works)

2496.5

69652

27.9

... More
SIDE DRAIN ( CC )

-

-

-

... More
Earth work in excavation of foundation trenches or drains in all sorts of soil(including mixed soil part excluding laterrite or sandstone) including removing. Spreading or stacking the spils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches. leveling. dressing and ramming the bottom. bailing out water as required complete. Depth of excavation not exceeding 1500mm.

1680

200373

119.27

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

1190

314160

264

... More
Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. (d) M-20 Grade: (i) Using concrete mixer. Pakur variety

451.5

2581577

5717.78

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc including supply of rods, initial straightening & removal of loose rust(if necessary), cutting to requisite length, hooking & bending to correct shape placing in proper position & binding with 16 gauge black annealed wire at every inter-section ,complete as per drawing & direction. For works in foundation basement and upto roof of ground floor/ up to 4m(tor steel/mild steel)

3.06

177882

58103

... More
Plaster (to wall, floor, ceiling etc.) with sand & cement mortar including rounding off or chamfering corners as directed and racking out joints or roughening of concrete surface including throating, nosing and brief course where necessary a) 20mm thick (1:4)

2660

452200

170

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.

2660

90440

34

... More
Add GST @18%

10209656.59

1837738

0.18

... More
Add Cess @1%

12047394.78

120473

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.