Changrabandha Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Changrabandha Development Authority Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 May 2022
Closing Date3 Jun 2022
Tender Amount₹ 22,78,859 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). For Construction of Sub Base by compacting River Bed Materials.Using manual means:

310.33

-

1463.36

... More
Manufacturing, laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of Cement Concrete (C.C.) M30 grade and spreading 25 mm thick sandn underneath and filling joints with sand on existing W.B.M. base as per Technical Specification Clause1503 for Rural Roads of MORD.

1234.98

-

932

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mmm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.

63.33

-

4069

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. 25 mm to 30 mm shuttering without staging in foundation

506.66

-

205

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.

26.39

-

119.27

... More
Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds at top as directed dressing complete. (Borrowpit measurement) By Carried Earth Lead 5.00 Km

50.67

-

349.55

1

-

241746.06

... More
Labour Wellfare Cess

1

-

22562.47



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.