Central Mechanical Engineering Research Institute Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Central Mechanical Engineering Research Institute - CMERI Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 12,11,644
Costs
EMD
₹ 24,233Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSIR_220319_1Bid Award Id
ViewTender No
28/3117/24-25/CI/Maint/ESDTender Authority
Central Mechanical Engineering Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender acceptance letter, Bank Details, and Undertaking (format given)
Scope of work and list of approved make of Civil Items.
BOQ Items
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
2
-
-
... More
Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete
192
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more.
1500
-
-
... More
Providing and laying in position 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level
13
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
10
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
8
-
-
... More
Brick work by using the bricks manufactured by MSW, CSIR-CMERI is to be carried from MSW, CMERI colony to the site and brick work with the same brick in 1:6 ratio cement morter in superstructure above plinth level up to floor V level in all shapes and sizes in :
14
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)
21
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
7
-
-
... More
12 mm cement plaster of mix 1:4( 1 cement : 4 coarse sand).
255
-
-
... More
15mm cement plaster on rough side of mix 1:4 (1cement: 4coarse sand)
190
-
-
... More
Neat cement punning.
55
-
-
... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
390
-
-
... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
55
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
360
-
-
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
26
-
-
... More
Cleaning the assorted sizes of the drains (beside boundry wall the Institute campus) and removing the dirt to a distance as directed.
250
-
-
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
54
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements