Central Mechanical Engineering Research Institute Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Central Mechanical Engineering Research Institute - CMERI Tender
Eprocure
Opening Date27 Nov 2020
Closing Date7 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 9,882Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CSIR_62906_1Bid Award Id
ViewTender No
19/07/2020-21/CI/ESD/MaintTender Authority
Central Mechanical Engineering Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for the work of Repairing and Renovation of backside of MPML at CSIR-CMERI Institute campus, Durgapur-09
BOQ for the work of Repairing and Renovation of backside of MPML at CSIR-CMERI Institute campus, Durgapur-09
Contract Document for the work Repairing and Renovation of backside of MPML at CSIR-CMERI Institute campus, Durgapur-09
Scope of work, Drawings and List of approve make.
Tender acceptance letter, Bank Details and undertaking (format given)
BOQ Items
... More
Demolishing brickwork manually/ by mechanical means including stacking of serviceable materials and disposal of unserviceable materials within 50m lead in cement mortar.
1
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
3350
-
-
... More
Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc complete. 40mm thick with 20mm nominal size stone aggregate.
20
-
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in All kinds of soil.
10
-
-
... More
Providing and laying in position 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level
6
-
-
... More
Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete
36
-
-
... More
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
500
-
-
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
0.6
-
-
... More
Providing and laying in position 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded stone aggregate 20 mm nominal size) cement concrete of specified grade excluding the cost of centering and shuttering, all the work upto plinth level.
2.2
-
-
... More
Brick work with FPS bricks of class designation 75 upto plinth level in 1:6 grade (1 cement: 6 coarse sand).
1
-
-
... More
Half brick masonry with bricks of class designation 75 in superstructure above plinth upto floor V level in cement mortar 1:4 (1 cement: 4 coarse sand)
14
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements