Central Mechanical Engineering Research Institute Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Central Mechanical Engineering Research Institute - CMERI Tender
Eprocure
Opening Date16 Jun 2021
Closing Date23 Jun 2021
Tender AmountRefer Documents
Costs
EMD
₹ 60,569Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_CSIR_79337_1Bid Award Id
ViewTender No
3/04/2021-22/CI/ESD/MaintTender Authority
Central Mechanical Engineering Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for the work of Providing concrete pavement for patrolling track along with side drainage beside solar park at CSIR-CMERI Institute campus, Durgapur-09
BOQ for the work of Providing concrete pavement for patrolling track along with side drainage beside solar park at CSIR-CMERI Institute campus, Durgapur-09
Contract document for the work Providing concrete pavement for patrolling track along with side drainage beside solar park at CSIR-CMERI Institute campus, Durgapur-09
list of approved makes, drawing and scope of work and other details
Tender acceptance letter, Bank Details and undertaking (format given)
BOQ Items
... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
10
-
-
... More
Providing and laying in position 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded stone aggregate 20 mm nominal size) cement concrete of specified grade excluding the cost of centering and shuttering, all the work upto plinth level.
36
-
-
... More
Brick work with FPS bricks of class designation 75 upto plinth level in 1:6 grade (1 cement: 6 coarse sand).
130
-
-
... More
12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand)
975
-
-
... More
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
130
-
-
... More
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
350
-
-
... More
Providing and laying in position 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded stone aggregate 20 mm nominal size) cement concrete of specified grade excluding the cost of centering and shuttering, all the work upto plinth level.
40
-
-
... More
Providing and laying in position 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level
2
-
-
... More
Centering & shuttering including strutting, propping etc & removal of form for Foundations, footings, bases of columns, etc. for mass concrete
5
-
-
... More
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
250
-
-
... More
Supplying and laying Polythene Sheet (150gm / sq.m.) below concreting surface or in foundation or in foundation trenches.
1500
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements