Bharat Sanchar Nigam Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Civil And Construction
Consultancy Services
Eprocure
Opening Date25 Jul 2024
Closing Date15 Aug 2024
Tender Amount₹ 61,73,947 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Gm/nwp D/cfa/e-ender/ofc Laying/ne/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
E-Tender for Laying and associated works by MT through HDD/OT method/Aerial erection method, Laying through existing duct, OFC Pulling/ Blowing and splicing works etc to restore the lossy routes under DE/TI/North, East, CTD under GM/TX
E-Tender for Laying and associated works by MT through HDD/OT method/Aerial erection method, Laying through existing duct, OFC Pulling/ Blowing and splicing works etc to restore the lossy routes under DE/TI/North, East, CTD under GM/TX
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Solid laying with cement concrete (1:2:4) as per instruction of the competent authority in case of low depth in plain,hard and rocky soil where depth is not possible including the cost of materials (ISI marked cement to be used).

49

115904

2365.4

... More
Laying,jointing and levelling PLB HDPE pipe (50mm dia) in the excavated trench including pulling of standard Nylon rope (4mm dia) into the pipe line with sealing of the section ends by end caps as per specification. (Excluding the cost PLB HDPE pipe and including the supply of Nylon rope & std. socket as per specification for connecting the PLB HDPE pipes).N.B.: The item includes collection of PLB HDPE pipes from departmental store and transportation to the work site.

420

4200

10

... More
Laying,jointing with threaded sockets and levelling GI pipe (2 inch dia)/DWC pipe in the excavated trench including pulling of standard Nylon rope (4mm dia) onto the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI pipe/DWC pipe with sealing of the section ends by end caps as per DOT's specification. (Including the supply of Nylon rope & excluding the cost of PLB HDPE pipe and GI/DWC pipes).N.B.: For This item PLB HDPE pipes (to be put inside the GI pipes)are not to be connected by socket.The item includes collection PLB HDPE/GI pipes/DWC pipes from departmental stores and transportation to the work site.

10

100

10

... More
Pulling/Blowing of optical fibre cable as per laying standard using appropriate means as per specification through PLB HDPE/GI/ TEFLON/ DWC pipes.The rate should include digging / reinstatement of manholes / pits (required for pulling the OFC),replacement of Nylon ropes, cleaning PLB HDPE/GI/DWC pipelines if necessary and covering the cable by split PLB HDPE/GI/DWC pipes in the manhole / pits.This items will be applicable for leading in the optical fibre cable in the Telephone Exchange also.The items includes collection of optical fibre cable drums from Departmental store and tansportation to the work site.

22550

225500

10

... More
Bridge crossing-Laying,jointing and levelling GI pipes/DWC pipes (2 inch dia.)in the existing through of bridges / footpaths by removing the concrete slabs including pulling of standard nylon rope (4mm dia) into the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI/DWC pipes.The work is to be executed as per the instruction of the supervising officer in the site.On completion of of the work slabs are to be set into the original condition.(excluding the cost of PLB HDPE pipe and GI pipes/DWC pipes and including the supply of nylon rope). N.B.:For this item PLB HDPE pipes are not to be connected by socket.

10

100

10

... More
Supply,fitting and fixation of PVC identification collar alongwith tie (as per specification) with BSNL OFC ID tag engraved on the collar.

20

120

6

... More
Providing and fixing precast RCC (1:2:4) (with 4 no. 4mm dia iron rods placed vertically) joint/route indicators per specification embedded 800 mm in earth at an interval of 200 mtr. Throughout the route as per direction of the executive officer of the site.The route indicator should be painted in "Yellow" and the joint indicator in "Red". The indicator should have "OFC/CTD" engraved on the top.

113

60455

535

... More
Construction of brick wall type OFC joint chamber / hand hole of internal size 1.2MX1.2MX1M(depth)as per latest Engineering Instructions and construction practise available in tender document

58

1363000

23500

... More
Earthing of Joint Closer (For Armoured OFC): Supply and fixing of spike earth arrangement consist of one number of 25.0 mm or more dia. GI pipe of 275 cm or more length, Connecting the joint closer earthing point with Earth rod by soft copper wire, minimum 2.5 mm. diameters and fixing with nuts and bolts properly as per specification available in tender document. (Earth value should be 5 Ω)

58

203000

3500

... More
Earthing of Termination Box (For Armoured OFC): Earthing with GI earth pipe 4.5 M long, 40 mm dia including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc (but without charcoal/coke and salt) as required as per specification available in tender document. . (Earth value should be 5Ω)

5

26840

5368

... More
Earthing of Termination Box (For Armoured OFC): Providing and laying earth connection from earth electrode with 4.00 mm dia copper wire in 15 mm dia G.I pipe from earth electrode including connection with copper thimble excavation and re-filling as required as per specification available in tender document. . (Earth value should be 5 Ω)

5

1845

369

... More
Cutting of brick wall for insertion of GI/PLP & restoration of the side of the hole including supply of necessary materials.

0.5

112

225

... More
Fixing of GI/PLB/DWC(store items) with iron clamp Horizontally through the wall at ground level. Clamp to be supplied by vendor

20

5000

250

... More
Nylon rope insertion including supply of materials

10930

87440

8

... More
Supply,fitting,fixing of PVC/ Teflon pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.

130

7800

60

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing-1 to 8 inch

12

48840

4070

... More
Cost of cleaning J/C, rearrangement of existing cable property,checking of each pipe, including lifting and disposing of materials from J/C by own transportation.

12

9600

800

... More
Pit repairing- Pucca surface

29

60900

2100

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only upto 1 KM

11

1650

150

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only beyond 1 KM

7.98

1995

250

... More
Videography of the Route for Capital work only

18.98

5694

300

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

20

16000

800

... More
Additional splicing for each of the remaining 20F in 24F OFC including termination of pigtails in FDMS/ODF

400

24000

60

... More
Splicing of first 4F OFC including terminations of pigtails in FDMS/ODF

2

1600

800

... More
Additional splicing for each of the remaining 92F in 96F OFC including termination of pigtails in FDMS/ODF

184

6440

35

... More
splicing per ribbon including termination of pigtails in FDMS/ODF

60

30000

500

... More
In case of single fibre splicing of 48F ribbon type/96F ribbon type including termination of pigtails in FDMS/ODF .

60

48000

800

... More
Additional splicing for each of the remaining fibres in 96F ribbon type including termination of pigtails in FDMS/ODF

5520

193200

35

... More
Supply of 4F OFC termination /joint box

10

700

70

... More
Pulling of Optical Fibre Cable other than 4F cable aerially including necessary fittings.

300

3000

10

... More
Supply of Stay steel wire (4 mm) with insulation coating

300

3000

10

... More
Supply & fixing of Cable binder PVC flexable roll

2

896

448

... More
Supply of Cable binding collar (4inch)

300

300

1

... More
Supply of porciline insulator with accessories

10

144

14.4

... More
Supply of pole clamp with 30X30X06 mm angle insulator (30/6 mm MS flat) fixture,nut-bolt, washer.

10

640

64

... More
Duct manhole cleaning - mud/soil/garbage disposal from manhole

30

60000

2000

... More
Project Management Cost (PMC) for Open Trench method of OFC laying of more than 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people.(Subject to minimum of Rs 30000/-)

13270

265400

20



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.