Bharat Sanchar Nigam Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Telecommunication Services
Eprocure
Opening Date31 Jan 2025
Closing Date21 Feb 2025
Tender Amount₹ 57,95,400.4 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Pgm/nwp D/cfa/e-tender/ofc Laying/eb-cm/swc/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
e-Tender for OFC laying by Open Trench and Aerial Erection methods and associated works in the jurisdiction of DE/TI/South, DE/TI/West and DE/TI/Central under PGM/TX/KTD
e-Tender for OFC laying by Open Trench and Aerial Erection methods and associated works in the jurisdiction of DE/TI/South, DE/TI/West and DE/TI/Central under PGM/TX/KTD
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Solid laying with cement concrete (1:2:4) as per instruction of the competent authority in case of low depth in plain,hard and rocky soil where depth is not possible including the cost of materials (ISI marked cement to be used).

28

2365

66231.2

... More
Brick soling, if necessary including the cost of class and brick

30

358

10752

... More
Laying,jointing and levelling PLB HDPE pipe (50mm dia) in the excavated trench including pulling of standard Nylon rope (4mm dia) into the pipe line with sealing of the section ends by end caps as per specification. (Excluding the cost PLB HDPE pipe and including the supply of Nylon rope & std. socket as per specification for connecting the PLB HDPE pipes).N.B.: The item includes collection of PLB HDPE pipes from departmental store and transportation to the work site.

2000

10

20000

... More
Laying,jointing with threaded sockets and levelling GI pipe (2 inch dia)/DWC pipe in the excavated trench including pulling of standard Nylon rope (4mm dia) onto the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI pipe/DWC pipe with sealing of the section ends by end caps as per DOT's specification. (Including the supply of Nylon rope & excluding the cost of PLB HDPE pipe and GI/DWC pipes).N.B.: For This item PLB HDPE pipes (to be put inside the GI pipes)are not to be connected by socket.The item includes collection PLB HDPE/GI pipes/DWC pipes from departmental stores and transportation to the work site.(Charges for insertion of PLB in GI pipe will be paid separately)

250

10

2500

... More
Construction of guard/retaining wall to provide protection to pipes (any type) on slopes and embankment of the ponds,water tank, culvert,bridges(as per instruction on the competent authority) upto a normal depth providing 15mm thick layer of plaster (1:6) surrounding the brick work (thickness of wall 25cms, ratio of cement morter (1:6).First class brick (picked) and ISI mark cement to be used.(Rate/cubic meter includes supply of brick,cement,sand etc by contractor)

10

3200

32000

... More
Pulling/Blowing of optical fibre cable as per laying standard using appropriate means as per specification through PLB HDPE/GI/ TEFLON/ DWC pipes.The rate should include digging / reinstatement of manholes / pits (required for pulling the OFC),replacement of Nylon ropes, cleaning PLB HDPE/GI/DWC pipelines if necessary and covering the cable by split PLB HDPE/GI/DWC pipes in the manhole / pits.This items will be applicable for leading in the optical fibre cable in the Telephone Exchange also.The items includes collection of optical fibre cable drums from Departmental store and tansportation to the work site.

23700

10

237000

... More
Laying of optical fibre cable using appropriate means through existing DUCT (including pumping out of any accumulated water and cleaning of DUCT pipes if necessary).

2000

10

20000

... More
Rate per welding joint for removing and welding Manhole covers of Troughs / Ducts. -Dewelding

50

5

250

... More
Rate per welding joint for removing and welding Manhole covers of Troughs / Ducts. -Welding

50

8

400

... More
Bridge crossing-Laying,jointing and levelling PLB HDPE pipes (50mm dia) in the existing through of bridges / footpaths by removing the concrete slabs including pulling of standard nylon rope (4mm dia.) into the pipeline. The work is to be executed as per the instruction of the supervising officer in the site.On completion of work slabs are to be set into the original condition.(excluding the cost of PLB HDPE pipe and including the supply of nylon rope & standard socket as per specification for the PLB HDPE pipes).

800

9

7200

... More
Bridge crossing-Laying,jointing and levelling GI pipes/DWC pipes (2 inch dia.)in the existing through of bridges / footpaths by removing the concrete slabs including pulling of standard nylon rope (4mm dia) into the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI/DWC pipes.The work is to be executed as per the instruction of the supervising officer in the site.On completion of of the work slabs are to be set into the original condition.(excluding the cost of PLB HDPE pipe and GI pipes/DWC pipes and including the supply of nylon rope). N.B.:For this item PLB HDPE pipes are not to be connected by socket.

200

10

2000

... More
Bridge crossing-Fixing of GI pipes/DWC pipes (2 inch dia) connected in tandem and supported on hangers,brackets and clamps attached to the outside parapet wall railing of road bridge at 1 Mtr internal.GI pipes/DWC pipes are to be perforated before fixing and to be painted black with (ICI/Asian)synthetic enamel paints after fixing including the supply of iron nuts,bolts,clamps,brackets,hangers and accessories required for the above work.All the materials to be coated with red oxide followed by black painting(ICI/Asian).

20

107

2144

... More
Laying of PLB/GI pipe pipe duct through horizontal manual boring method for road/rail crossing including transportation of GI pipe for laying of 40mm PLB pipe(The GI Pipe of 65mm dia will be supplied by BSNL)

20

130

2600

... More
Supply and installation of AL-identification collar (as per specification) with the route name engraved on the collar.(for undergorund cable laying)

40

20

800

... More
Supply,fitting and fixation of PVC identification collar alongwith tie (as per specification) with BSNL OFC ID tag engraved on the collar.(for Overhead laying)

6600

6

39600

... More
Providing and fixing precast RCC (1:2:4) (with 4 no. 4mm dia iron rods placed vertically) joint/route indicators per specification embedded 800 mm in earth at an interval of 200 mtr. Throughout the route as per direction of the executive officer of the site.The route indicator should be painted in "Yellow" and the joint indicator in "Red". The indicator should have "OFC/CTD" engraved on the top.

3

535

1605

... More
Construction of brick wall type OFC joint chamber / hand hole of internal size 1.2MX1.2MX1M(depth)as per latest Engineering Instructions and construction practise available in tender document

2

23500

47000

... More
Construction of brick wall type OFC joint chamber/hand hole of internal size lesser than above mentioned in sl.22 )as per latest Engineering Instructions and construction practise available in tender document(depth will be same as above)

4

16319

65276

... More
Earthing of Joint Closer (For Armoured OFC): Supply and fixing of spike earth arrangement consist of one number of 25.0 mm or more dia. GI pipe of 275 cm or more length, Connecting the joint closer earthing point with Earth rod by soft copper wire, minimum 2.5 mm. diameters and fixing with nuts and bolts properly as per specification available in tender document. (Earth value should be 5 Ω)

2

3500

7000

... More
Earthing of Termination Box (For Armoured OFC): Earthing with GI earth pipe 4.5 M long, 40 mm dia including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc (but without charcoal/coke and salt) as required as per specification available in tender document. . (Earth value should be 5Ω)

2

5368

10736

... More
Embedding of GI /DWCpipe-proposed chamber to chamber.

60

14

840

... More
Embedding of GI /DWCpipe-proposed chamber to trough.

60

16

960

... More
Lifting and refilling of sand from P/C, M/H, through C/J chamber etc.

20

80

1600

... More
Supply of white sand to fill up the MH/PC/CJ etc.

20

336

6720

... More
Leading IN of OFC from main road to equipment room:Horizontal portion in the ground level:

-

-

-

... More
Compound pavement cutting

80

260

20800

... More
Compound tiles cutting & replacement with new one

75

400

30000

... More
RCC floor

75

310

23250

... More
Insertion of PLP in GI pipe

500

6

3000

... More
Cutting of brick wall for insertion of GI/PLP & restoration of the side of the hole including supply of necessary materials.

40

225

9000

... More
Fixing of GI/PLB/DWC(store items) with iron clamp horizontally through the outside wall of customer premises including scaffolding Clamp to be supplied by vendor.

140

250

35000

... More
Supply & fixing of PVC(1” dia) with saddles, bend and accessories like iron clamp horizontally through the outside wall of customer premises including scaffolding(No cost of material will be paid)

460

250

115000

... More
Supply and fixation of PVC(1” dia) with saddles(3nos./mtr), bend and accessories for clamping inside customer room (horizontal and vertical)

200

43

8600

... More
Vertical portion above ground level:

-

-

-

... More
GI/DWC blend - Long

20

180

3600

... More
GI/DWC blend - Short

30

150

4500

... More
Clamp providing and fixing

170

100

17000

... More
Nylon rope insertion including supply of materials

200

8

1600

... More
GI/PLB/DWC (store spply)fixing with iron clamp including scaffolding charges - 1st to 5th floor. Clamp to be supplied by vendor

50

300

15000

... More
GI/PLB/DWC fixing with clamp including scaffolding charges - 6th to 14th floor.Clamp to be supplied by vendor

50

450

22500

... More
Supply and fixing of PVC pipe (1" dia) with iron clamp in vertical clamping 1st to 5th floor with scaffolding

197

300

59100

... More
Supply and fixing of PVC pipe (1" dia) with iron clamp in vertical clamping 6th to 14th floor with scaffolding

60

400

24000

... More
Where riser available - fixing of PLB in the riser by clamp/hook -1st to 5th floor.with scaffolding

50

125

6250

... More
Where riser available - fixing of PLB in the riser by clamp/hook - 6th to 14th floor.with scaffolding

30

175

5250

... More
Where riser available-supply & fixing of PVC in the riser by clamp/hook -where scaffolding is not required

25

45

1125

... More
In case of concealing of PLP/GI including plastering, cementing as it was before.

50

470

23500

... More
Horizontal at the roof top:

-

-

-

... More
Construction of brick pillar of specific size

2

3500

7000

... More
Fixing of GI by MS clamp

40

100

4000

... More
Supply,fitting,fixing of PVC/ Teflon pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.(including cost of PVC/teflon pipe and fitting accessories for fixing)

520

60

31200

... More
Fitting,fixing of PLB pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.

310

12

3720

... More
Renovation/Relocation of different items related with OFC laying

-

-

-

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing (Considering the size of standard OFC chamber 1MX1M) -1 to 8 inch

12

4070

48840

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing(Considering the size of standard OFC chamber 1MX1M)-9 to 12 inch

2

5000

10000

... More
Cost of cleaning J/C, rearrangement of existing cable property,checking of each pipe, including lifting and disposing of materials from J/C by own transportation.

15

800

12000

... More
Constructing,fitting,fixing of angle frame over brick wall of J/C as per standard specification of OFC laying tender.

26

3300

85800

... More
Supplying and fitting of J/C slab cover will be as per standard of OFC laying specification.

30

3880

116400

... More
Repairing of damaged footpath with existing tiles of footpath.

20

750

15000

... More
Sloping down of J/C after brick working and fitting/fixing of angle frame and slab cover on brick wall of J/C(Considering the size of standard OFC chamber 1MX1M)-1 to 8 inch

5

3300

16500

... More
Sloping down of J/C after brick working and fitting/fixing of angle frame and slab cover on brick wall of J/C(Considering the size of standard OFC chamber 1MX1M)-9 to 12 inch

2

3800

7600

... More
Repairing, plastering and net comenting of damaged portion caused due to water pipe inside the J/C.

5

1350

6750

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only upto 1 KM

65

150

9750

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only beyond 1 KM

55

250

13750

... More
Splicing work under supervision of BSNL officials. N.B: The OTDR & Splicing Machine will be supplied by BSNL.All small items are to be supplied by Vendor

15

600

9000

... More
Splicing of 4F OFC at route or terminal including termination of pigtails in FDMS/ODF

62

800

49600

... More
All type of Splicing of 24F OFC

-

-

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

502

800

401600

... More
Additional splicing for each of the remaining 20F in 24F OFC including termination of pigtails in FDMS/ODF

7840

60

470400

... More
Splicing of Fibres(48F non ribbon type OFC) in route or terminal including testing of fibres,termination of pigtails in FDMS/ODF

-

-

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

24

800

19200

... More
Additional splicing for each of the remaining 44F in 48F OFC including termination of pigtails in FDMS/ODF

836

55

45980

... More
Splicing of Fibres(96F non ribbon type OFC) in route or terminal including testing of fibres,termination of pigtails in FDMS/ODF

-

-

-

... More
Splicing of first 4F OFC including terminations of pigtails in FDMS/ODF

12

800

9600

... More
Additional splicing for each of the remaining 92F in 96F OFC including termination of pigtails in FDMS/ODF

1112

35

38920

... More
Splicing of Fibres(48F ribbon type OFC /96F ribbon type OFC) in route or terminal including testing of fibres for full 48F/96F splicing, termination of pigtails in FDMS/ODF .

-

-

-

... More
splicing per ribbon including termination of pigtails in FDMS/ODF

24

500

12000

... More
In case of single fibre splicing of 48F ribbon type/96F ribbon type including termination of pigtails in FDMS/ODF .

14

800

11200

... More
Additional splicing for each of the remaining fibres in 48F ribbon type including termination of pigtails in FDMS/ODF .

750

55

41250

... More
Additional splicing for each of the remaining fibres in 96F ribbon type including termination of pigtails in FDMS/ODF

460

35

16100

... More
Recovery of Empty Optical Fibre Cable Drum

30

200

6000

... More
Collection of post (A4 B8 C8) with sole plate and other fittings and transportation from BSNL store

8

2400

19200

... More
Supply of post(GI) of 20ft length and 3 inch dia with sole plate.

54

2500

135000

... More
Supply of 4F OFC termination /joint box

330

70

23100

... More
Installation/Dismantling of termination box with fitting materials and arrangement of pigtails

30

500

15000

... More
Arrangement of Pigtails in existing/New FDF/FDP from Termination box after splicing including fitting materials (0 DB connector is to be provided by BSNL)

15

500

7500

... More
Erection of post (With necessary fittings) with RCC base with painting

331

600

198600

... More
Erection of post (With necessary fittings) without RCC base with painting

6

344

2064

... More
Pulling of Optical Fibre Cable other than 4F cable aerially including necessary fittings.

124800

10

1248000

... More
Pulling of 4F Optical Fibre Cable aerially including necessary fittings.

16000

8

128000

... More
Supply of Stay steel wire (4 mm) with insulation coating

101300

10

1013000

... More
Supply of Stay stainer 5/8 inch - 12 inch.

142

33

4771.2

... More
Supply & fixing of Cable binder PVC flexable roll

534

448

239232

... More
Supply of Cable binding collar (4inch)

133876

1

133876

... More
Supply & installation of 33 mm dia taflon pipe (thickness 4mm)

2110

25

54016

... More
Supply of porciline insulator with accessories

1630

14

23472

... More
Supply of pole clamp with 30X30X06 mm angle insulator (30/6 mm MS flat) fixture,nut-bolt, washer.

1630

64

104320

... More
Recovery of aerially erected Optical fibre Cable and rolling it in cable drum.

1000

8

8000

... More
Duct manhole slab(Standard RCC) repair by sand,stone,cement rod,MS sheet with labour charges

4

550

2200

... More
Duct manhole cleaning - Lifting of mud/soil/garbage from duct

2

1000

2000

... More
Duct manhole cleaning - mud/soil/garbage disposal from manhole

2

2000

4000

... More
Project Management Cost (PMC) for Open Trench method of OFC laying upto 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people..

80

30

2400

... More
Project Management Cost (PMC) for Open Trench method of OFC laying of more than 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people.(Subject to minimum of Rs 30000/-)

80

20

1600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.