Bharat Sanchar Nigam Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Civil And Construction
Eprocure
Opening Date28 Sep 2024
Closing Date19 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Pgm/nwp D/cfa/e-tender/ofc Laying/ws/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
E-Tender for Laying and associated works by MT through HDD/OT method/Aerial erection method, Laying through existing duct, OFC Pulling/Blowing and splicing works etc to restore the lossy routes under DE/TI/South, West under PGM/TX/KTD
E-Tender for Laying and associated works by MT through HDD/OT method/Aerial erection method, Laying through existing duct, OFC Pulling/Blowing and splicing works etc to restore the lossy routes under DE/TI/South, West under PGM/TX/KTD
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Horizontal Directional Drilling(MT) & laying of PLB pipe of 33/40 mm dia upto three pipes through boring by "NO DIG" method using trench-less technology and other associated works along road and under railway/road/canal/streams crossing in all type of soil(including soft rock and hard rock) at suitable depth(at least 200 cms) and entry cum exit pits depth at least be 165 cms including all civil works.The work inlcudes DIT test, i.e. pressure,sponge,air test and all other test associated with DIT test.Supply of all testing tools and tackling of other required equipments and consumable items,labourers,etc and making all such necessary arrangements are under vendor's scope.The rate includes transportation of materails from departmental store depot to the work site.Depth detector and machine generated graphical view printout readily be available at site & be submitted as depth proof.

20730

5182500

250

... More
Solid laying with cement concrete (1:2:4) as per instruction of the competent authority in case of low depth in plain,hard and rocky soil where depth is not possible including the cost of materials (ISI marked cement to be used).

3

7096

2365.4

... More
Brick soling, if necessary including the cost of class and brick

0.1

35

358.4

... More
Laying,jointing and levelling PLB HDPE pipe (50mm dia) in the excavated trench including pulling of standard Nylon rope (4mm dia) into the pipe line with sealing of the section ends by end caps as per specification. (Excluding the cost PLB HDPE pipe and including the supply of Nylon rope & std. socket as per specification for connecting the PLB HDPE pipes).N.B.: The item includes collection of PLB HDPE pipes from departmental store and transportation to the work site.

740

7400

10

... More
Laying,jointing with threaded sockets and levelling GI pipe (2 inch dia)/DWC pipe in the excavated trench including pulling of standard Nylon rope (4mm dia) onto the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI pipe/DWC pipe with sealing of the section ends by end caps as per DOT's specification. (Including the supply of Nylon rope & excluding the cost of PLB HDPE pipe and GI/DWC pipes).N.B.: For This item PLB HDPE pipes (to be put inside the GI pipes)are not to be connected by socket.The item includes collection PLB HDPE/GI pipes/DWC pipes from departmental stores and transportation to the work site.

0.1

1

10

... More
Construction of guard/retaining wall to provide protection to pipes (any type) on slopes and embankment of the ponds,water tank, culvert,bridges(as per instruction on the competent authority) upto a normal depth providing 15mm thick layer of plaster (1:6) surrounding the brick work (thickness of wall 25cms, ratio of cement morter (1:6).First class brick (picked) and ISI mark cement to be used.(Rate/cubic meter includes supply of brick,cement,sand etc by contractor)

0.1

320

3200

... More
Pulling/Blowing of optical fibre cable as per laying standard using appropriate means as per specification through PLB HDPE/GI/ TEFLON/ DWC pipes.The rate should include digging / reinstatement of manholes / pits (required for pulling the OFC),replacement of Nylon ropes, cleaning PLB HDPE/GI/DWC pipelines if necessary and covering the cable by split PLB HDPE/GI/DWC pipes in the manhole / pits.This items will be applicable for leading in the optical fibre cable in the Telephone Exchange also.The items includes collection of optical fibre cable drums from Departmental store and tansportation to the work site.

44137

441370

10

... More
Laying of optical fibre cable using appropriate means through existing DUCT (including pumping out of any accumulated water and cleaning of DUCT pipes if necessary).

0.1

1

10

... More
Rate per welding joint for removing and welding Manhole covers of Troughs / Ducts. -Dewelding

1

5

5

... More
Rate per welding joint for removing and welding Manhole covers of Troughs / Ducts. -Welding

1

8

8

... More
Bridge crossing-Laying,jointing and levelling PLB HDPE pipes (50mm dia) in the existing through of bridges / footpaths by removing the concrete slabs including pulling of standard nylon rope (4mm dia.) into the pipeline. The work is to be executed as per the instruction of the supervising officer in the site.On completion of work slabs are to be set into the original condition.(excluding the cost of PLB HDPE pipe and including the supply of nylon rope & standard socket as per specification for the PLB HDPE pipes).

0.1

-

9

... More
Bridge crossing-Laying,jointing and levelling GI pipes/DWC pipes (2 inch dia.)in the existing through of bridges / footpaths by removing the concrete slabs including pulling of standard nylon rope (4mm dia) into the pipeline with PLB HDPE pipe of 50mm dia inserted inside the GI/DWC pipes.The work is to be executed as per the instruction of the supervising officer in the site.On completion of of the work slabs are to be set into the original condition.(excluding the cost of PLB HDPE pipe and GI pipes/DWC pipes and including the supply of nylon rope). N.B.:For this item PLB HDPE pipes are not to be connected by socket.

0.1

1

10

... More
Bridge crossing-Fixing of GI pipes/DWC pipes (2 inch dia) connected in tandem and supported on hangers,brackets and clamps attached to the outside parapet wall railing of road bridge at 1 Mtr internal.GI pipes/DWC pipes are to be perforated before fixing and to be painted black with (ICI/Asian)synthetic enamel paints after fixing including the supply of iron nuts,bolts,clamps,brackets,hangers and accessories required for the above work.All the materials to be coated with red oxide followed by black painting(ICI/Asian).

0.1

10

107.2

... More
Road crossing including the following items: Boring,trenching,concreting (if necessary) embedding of GI/DWC pipes, insertion of standard nylon rope at a depth of 1.65 mtrs. and reinstatement as per specification excluding the cost of GI/DWC pipes. Proportional rate will be applicable for depth less than 1.65 mtrs. (if depth of 1.65 mtrs. is not possible then a lower depth can be allowed only with the permission supervising officer in the site.

0.1

86

865

... More
Laying of PLB/GI pipe pipe duct through horizontal manual boring method for road/rail crossing including transportation of GI pipe for laying of 40mm PLB pipe(The GI Pipe of 65mm dia will be supplied by BSNL)

0.1

13

130

... More
Supply and installation of AL-identification collar (as per specification) with the route name engraved on the collar.(for undergorund cable laying)

90

1800

20

... More
Supply,fitting and fixation of PVC identification collar alongwith tie (as per specification) with BSNL OFC ID tag engraved on the collar.(for Overhead laying)

1

6

6

... More
Providing and fixing precast RCC (1:2:4) (with 4 no. 4mm dia iron rods placed vertically) joint/route indicators per specification embedded 800 mm in earth at an interval of 200 mtr. Throughout the route as per direction of the executive officer of the site.The route indicator should be painted in "Yellow" and the joint indicator in "Red". The indicator should have "OFC/CTD" engraved on the top.

109

58315

535

... More
Construction of brick wall type OFC joint chamber / hand hole of internal size 1.2MX1.2MX1M(depth)as per latest Engineering Instructions and construction practise available in tender document

1

23500

23500

... More
Construction of brick wall type OFC joint chamber/hand hole of internal size lesser than above mentioned in sl.22 )as per latest Engineering Instructions and construction practise available in tender document(depth will be same as above)

76

1240244

16319

... More
Earthing of Joint Closer (For Armoured OFC): Supply and fixing of spike earth arrangement consist of one number of 25.0 mm or more dia. GI pipe of 275 cm or more length, Connecting the joint closer earthing point with Earth rod by soft copper wire, minimum 2.5 mm. diameters and fixing with nuts and bolts properly as per specification available in tender document. (Earth value should be 5 Ω)

8

28000

3500

... More
Earthing of Termination Box (For Armoured OFC): Earthing with GI earth pipe 4.5 M long, 40 mm dia including accessories and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc (but without charcoal/coke and salt) as required as per specification available in tender document. . (Earth value should be 5Ω)

2

10736

5368

... More
Earthing of Termination Box (For Armoured OFC): Providing and laying earth connection from earth electrode with 4.00 mm dia copper wire in 15 mm dia G.I pipe from earth electrode including connection with copper thimble excavation and re-filling as required as per specification available in tender document. . (Earth value should be 5 Ω)

200

73800

369

... More
Lifting and refilling of sand from P/C, M/H, through C/J chamber etc.

0.1

8

80

... More
Supply of white sand to fill up the MH/PC/CJ etc.

0.1

33

336

... More
Leading IN of OFC from main road to equipment room:Horizontal portion in the ground level:

-

-

-

... More
Compound pavement cutting

6

1560

260

... More
Compound tiles cutting & replacement with new one

0.1

40

400

... More
RCC floor

0.1

31

310

... More
Insertion of PLP in GI pipe

60

360

6

... More
Cutting of brick wall for insertion of GI/PLP & restoration of the side of the hole including supply of necessary materials.

10

2250

225

... More
Fixing of GI/PLB/DWC(store items) with iron clamp Horizontally through the wall at ground level. Clamp to be supplied by vendor(through outside wall of customer premises including scaffolding)

30

7500

250

... More
Supply and fixing of PVC(1” dia) with saddles, bend and accessories like iron clamp horizontally through the outside wall of customer premises including scaffolding

10

2500

250

... More
Supply and fixation of PVC(1” dia) with saddles(3nos./mtr), bend and accessories for clamping inside customer room (horizontal and vertical)

0.1

4

43

... More
Vertical portion above ground level:

-

-

-

... More
GI/DWC blend - Long

1

180

180

... More
GI/DWC blend - Short

1

150

150

... More
Clamp providing and fixing

1

100

100

... More
Nylon rope insertion including supply of materials

0.1

-

8

... More
GI/PLB/DWC (store spply)fixing with iron clamp including scaffolding charges - 1st to 5th floor. Clamp to be supplied by vendor

0.1

30

300

... More
GI/PLB/DWC fixing with clamp including scaffolding charges - 6th to 14th floor.Clamp to be supplied by vendor

0.1

45

450

... More
Supply and fixing of PVC pipe (1" dia) with iron clamp in vertical clamping 1st to 5th floor

0.1

30

300

... More
Supply and fixing of PVC pipe (1" dia) with iron clamp in vertical clamping 6th to 14th floor

0.1

40

400

... More
Where riser available - fixing of PLB in the riser by clamp/hook -1st to 5th floor.

0.1

12

125

... More
Where riser available - fixing of PLB in the riser by clamp/hook - 6th to 14th floor.

0.1

17

175

... More
In case of concealing of PLP/GI including plastering, cementing as it was before.

0.1

47

470

... More
Horizontal at the roof top:

-

-

-

... More
Construction of brick pillar of specific size

0.1

350

3500

... More
Fixing of GI by MS clamp

0.1

10

100

... More
Supply,fitting,fixing of PVC/ Teflon pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.

10

600

60

... More
Fitting,fixing of PLB pipe on iron rack in side of eqpt.Room through which OFC is to be pulled for horizontal and vertical LI purposes.

20

240

12

... More
Renovation/Relocation of different items related with OFC laying

-

-

-

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing-1 to 8 inch

1

4070

4070

... More
Raising of J/C by constructing brick wall and fixing existing angle frame and slab cover along with net cementing-9 to 12 inch

1

5000

5000

... More
Cost of cleaning J/C, rearrangement of existing cable property,checking of each pipe, including lifting and disposing of materials from J/C by own transportation.

1

800

800

... More
Constructing,fitting,fixing of angle frame over brick wall of J/C as per standard specification of OFC laying tender.

1

3300

3300

... More
Supplying and fitting of J/C slab cover will be as per standard of OFC laying specification.

1

3880

3880

... More
Repairing of damaged footpath with existing tiles of footpath.

0.1

75

750

... More
Sloping down of J/C after brick working and fitting/fixing of angle frame and slab cover on brick wall of J/C-1 to 8 inch

1

3300

3300

... More
Sloping down of J/C after brick working and fitting/fixing of angle frame and slab cover on brick wall of J/C-9 to 12 inch

1

3800

3800

... More
Repairing, plastering and net comenting of damaged portion caused due to water pipe inside the J/C.

1

1350

1350

... More
Pit repairing- Pucca surface

0.1

210

2100

... More
Pit repairing- Kacha surface

0.1

120

1200

... More
Making test pit(only for survey or design of the following size -0.3 MX0.7 MX1 M)

1

300

300

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only upto 1 KM

1

150

150

... More
ROUTE INDEX DIAGRAM-Supply of Route Index Diagram in Hard as well as Soft copy on CD for Capital work only beyond 1 KM

14.37

3592

250

... More
Videography of the Route for Capital work only

14.37

4311

300

... More
Splicing work under supervision of BSNL officials. N.B: The OTDR & Splicing Machine will be supplied by BSNL.All small items are to be supplied by Vendor

1

600

600

... More
Splicing of 4F OFC at route or terminal including termination of pigtails in FDMS/ODF

1

800

800

... More
All type of Splicing of 24F OFC

-

-

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

1

800

800

... More
Additional splicing for each of the remaining 20F in 24F OFC including termination of pigtails in FDMS/ODF

20

1200

60

... More
Splicing of Fibres(48F non ribbon type OFC) in route or terminal including testing of fibres,termination of pigtails in FDMS/ODF

-

-

-

... More
Splicing of first 4F OFC including termination of pigtails in FDMS/ODF

37

29600

800

... More
Additional splicing for each of the remaining 44F in 48F OFC including termination of pigtails in FDMS/ODF

1628

89540

55

... More
Splicing of Fibres(96F non ribbon type OFC) in route or terminal including testing of fibres,termination of pigtails in FDMS/ODF

-

-

-

... More
Splicing of first 4F OFC including terminations of pigtails in FDMS/ODF

1

800

800

... More
Additional splicing for each of the remaining 92F in 96F OFC including termination of pigtails in FDMS/ODF

92

3220

35

... More
Splicing of Fibres(48F ribbon type OFC /96F ribbon type OFC) in route or terminal including testing of fibres for full 48F/96F splicing, termination of pigtails in FDMS/ODF .

-

-

-

... More
splicing per ribbon including termination of pigtails in FDMS/ODF

4

2000

500

... More
In case of single fibre splicing of 48F ribbon type/96F ribbon type including termination of pigtails in FDMS/ODF .

4

3200

800

... More
Additional splicing for each of the remaining fibres in 48F ribbon type including termination of pigtails in FDMS/ODF .

132

7260

55

... More
Additional splicing for each of the remaining fibres in 96F ribbon type including termination of pigtails in FDMS/ODF

92

3220

35

... More
Recovery of Empty Optical Fibre Cable Drum

1

200

200

... More
Collection of post (A4 B8 C8) with sole plate and other fittings and transportation from BSNL store

1

2400

2400

... More
Supply of post(GI) of 20ft length and 3 inch dia with sole plate.

1

2500

2500

... More
Supply of 4F OFC termination /joint box

1

74

74

... More
Installation/Dismantling of termination box with fitting materials and arrangement of pigtails

1

500

500

... More
Arrangement of Pigtails in existing/New FDF/FDP from Termination box after splicing including fitting materials (0 DB connector is to be provided by BSNL)

1

500

500

... More
Erection of post (With necessary fittings) with RCC base with painting

1

600

600

... More
Erection of post (With necessary fittings) without RCC base with painting

1

344

344

... More
Pulling of Optical Fibre Cable other than 4F cable aerially including necessary fittings.

0.1

1

10

... More
Pulling of 4F Optical Fibre Cable aerially including necessary fittings.

0.1

-

8

... More
Straightening of OFC under Sagging and binding with the poles

0.1

-

8

... More
Supply of Stay steel wire (4 mm) with insulation coating

0.1

1

10

... More
Supply of Stay stainer 5/8 inch - 12 inch.

1

33

33.6

... More
Supply & fixing of Cable binder PVC flexable roll

1

448

448

... More
Supply of Cable binding collar (4inch)

1

1

1

... More
Supply & installation of 33 mm dia taflon pipe (thickness 4mm)

0.1

2

25.6

... More
Supply of porciline insulator with accessories

1

14

14.4

... More
Supply of pole clamp with 30X30X06 mm angle insulator (30/6 mm MS flat) fixture,nut-bolt, washer.

1

64

64

... More
Recovery of aerially erected Optical fibre Cable and rolling it in cable drum.

0.1

-

8

... More
Road cutting vibrator with generator

1

2500

2500

... More
Lifting and replacement of duct manhole slabs after testing of existing fibers

0.1

6

60

... More
Change of angle frame(5"X5"10mm) with welding and renting of generator machine .

0.1

100

1000

... More
Raising of duct wall(upto 6") with concrete and brick including materials

0.1

40

400

... More
Duct manhole slab(Standard RCC) repair by sand,stone,cement rod,MS sheet with labour charges

0.1

55

550

... More
Supply and installation/fixing of New Duct Manhole Slab (RCC)

0.1

72

725

... More
Duct manhole cleaning - Lifting of mud/soil/garbage from duct

1

1000

1000

... More
Duct manhole cleaning - mud/soil/garbage disposal from manhole

1

2000

2000

... More
Supply of tag block 128 pin

1

450

450

... More
Project Management Cost (PMC) for Open Trench method of OFC laying upto 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people..

0.1

3

30

... More
Project Management Cost (PMC) for Open Trench method of OFC laying of more than 1000m length. Includes liaisoning works and getting permission from other departments like PWD, KMC, Municipality, Police Station, water supply, CESC, WBSEDCL, PHE etc and liaisoning to sort out objections from local people.(Subject to minimum of Rs 30000/-)

14370

287400

20



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.