Bharat Coking Coal Limited Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Bharat Coking Coal Limited - BCCL Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date26 Feb 2025
Closing Soon11 Mar 2025
Tender Amount₹ 1,46,390 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3. Cross supporting damaged girder, joist new joist by welding by suitable electrodes with all side supporting M.S.plate tightening by 97nos) H.T.Bolts, nuts with double washer. Skilled-3 men per shift, 8 shits= 24 shit x@ Rs. 478/per shift=11472 Semi skilled-4 men per shift, 8shift=32shift X Rs.363/- per shift=11616 welder (sklled)-1 men per shift, 8 shits = 8shift X @478/per shift = 3824

1

26912

26912

... More
All plate form plates resetting by bolting with welding after new holes making with plates and girdirs. Skilled-3 men per shift, 2 shifts= 6 shift x @ Rs. 478/ per shift=2868 Semi Skilled-4 men per shift, 2 shifts= 8 shift x @ Rs. 363/ per shift=2904 Welder (Skilled)-1 men per shift, 2 shifts= 2 shift x @ Rs. 478/ per shift=956

1

6728

6728

... More
CI weights/20Kg500pcs) shifting from store room to weighing plate form and then placing it in weighing plate- form as per requirement and unloading the CI. weight DOCP road weighbridge during calibration of the machine. Skilled-1 men per shift, 3 shifts-3 shift x@ Rs. 478/-per shift=1434 Semi skilled-2 men per shift,3 shifts= 6 shfits X Rs.363/-per shift=2178 Un skilled-8 men per shift,3 shifts= 24 shifts x @Rs.346/per shift=8304

1

11916

11916

... More
After calibration of weighing platform C.I. Weights (20Kg.x500pcs) are shifting from weighing plate form to store room. Un Skilled-8 men per shift, 2 shifts -16 shfitx @Rs. 346/per shift=5536

1

5536

5536

... More
B) New road W/B PLATFORM AT DOCP

-

-

-

... More
Labour requirement for weighing platform bottom portion cleaning surrounding area of load cell, etc. for verification of DOCP. Un Skilled-7 men per shift, 2 shifts= 14 shit X @Rs.345/per shit=4844

1

4844

4844

... More
C.I. weights(20Kg each X 750pcs) Shifting from DOCP weigh bridge-l to new weighing platform and then placing it in weighing platform as per requirement and unloading the C.I. weights at new road weigh bridge during calibration of machine and verification. Skilled-1 men per shift, 3 shifts =3 shift x @Rs. 478/-per shift=1434 Semi skilled-2 men per shift,3 shifts- 6 shifts @Rs.363/- per shift=2178 Un skilled -8 men per shift,3 shifts = 24 shifts X @Rs.346/- per shift=8304

1

11916

11916

... More
Transporting charges of C.I. Weights (20Kg each X 750 pcs)

1

5850

5850

... More
After calibration of weighing plate form Cl. weights(20kg X750pcs) are shifting from weighing platform to store room. Semi skilled-1 men per shift,2 shifts= 2 shifts X@ Rs.363/- per shift=726 Un skilled-9 men per shift,2 shifts = 18 shifts X @Rs.478/-=6228

1

6954

6954

... More
C) MATERIAL REQUIRED

-

-

-

... More
Industrial gas DA

1

1700

1700

... More
Oxygen

3

350

1050

... More
Low hydrogen electrodes E104 or equivalent

12

500

6000

... More
H.T. Bolts with nuts

97

135

13095

... More
H.T. washer (HD)

194

24

4753

... More
Grinding wheel

1

648

648

... More
Gouging electrode

1

500

500

... More
Transporting with tool & tackles

1

1200

1200

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.