Asansol Durgapur Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Asansol Durgapur Development Authority - ADDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Mar 2023
Closing Date17 Apr 2023
Tender Amount₹ 3,13,221 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
With earth obtained from excavation of foundation.

7.6

589

77.54

... More
Flling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water and ramming complete including cost of sand.

-

-

-

... More
By Fine sand .

1.8

1153

640.86

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand .

38

12312

324

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. [ Pakur variety]

1.8

8442

4690.49

... More
Brick work with 1st class bricks in cement mortar (1:6)

-

-

-

... More
In foundation and plinth

1.3

6255

4812

... More
In superstructure

-

-

-

... More
Ground floor

2.6

13091

5035

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor with HB netting

-

-

-

... More
Ground floor

10.5

7402

705

... More
Controlled Cement concrete with well graded stone chips (20 mm graded nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture]

-

-

-

... More
In Ground Floor & foundation with Concrete mixture [ M20 Grade]

14.4

76862

5337.69

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with rewuired bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting , fixing and stricking out after completion of works.

-

-

-

... More
25 mm to 30 mm wooden shuttering

-

-

-

... More
Upto Ground floor roof level

19.8

6494

328

... More
25 mm to 30 mm shuttering without staging in foundation etc.

45.1

9245

205

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, strips binders etc. including supplying of roads, initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending etc. complete as per drawing and direction.[SAIL/TATA/RINL.]

-

-

-

... More
For M.S. / Tor steel.

-

-

-

... More
Upto Ground floor roof level.

1.7

93627

55075.23

... More
Plaster (to wall, floor, etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints roughening of concrete surface including chipping and application of cement slurry where necessary etc. complete.

-

-

-

... More
With 6:1 cement mortar.

-

-

-

... More
20 mm thick plaster (Out side)

-

-

-

... More
In ground floor.

8.75

1356

155

... More
With 6:1 cement mortar.

-

-

-

... More
25 mm thick plaster (Inside)

-

-

-

... More
In ground floor.

8.75

1583

181

... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly, complete as per manufacturer's specification and as per direction of the EIC.

-

-

-

... More
One Coat

-

-

-

... More
Ground floor

17.5

549

31.4

... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer

-

-

-

... More
Two Coat

-

-

-

... More
Normal Acrylic Emulsion

17.5

1172

67

... More
Supplying and laying Polythene sheet (150 gm / sqm ) over damp proof course or below flooring or in foundation trenches .

67

1608

24

... More
Artificial stone in floor , dado, staircase etc.with cement concrete (4:2:1) laid in panels as directed, with topping made with ordinary or white cement (as necessary) and marble dust in proportion (2:1) including smooth finishing and rounding off corners including application of cement sullry before flooring works, using cement @ 1.75 kg/sqm all complete including all materials and labour.(In G Floor/ With graded stone chips :3 mm thick topping (High polishing grinding on this item is not permitted) with ordinary cement.

-

-

-

... More
35 mm thick artificial stone.

-

-

-

... More
In Ground floor.[roof]

59.17

19110

323

... More
Sub-Total

1

262813

262813.69

... More
GST-18% (SGST=9% & CGST=9%)ADD

1

47306

31537.64

... More
WEST BENGAL LABOUR WELFARE CESS =1% ADD

1

3101

2943.51



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.