Asansol Durgapur Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Asansol Durgapur Development Authority - ADDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Sep 2022
Closing Date23 Sep 2022
Tender Amount₹ 12,56,709 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 28,890Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ADDA_401804_1Bid Award Id
ViewTender No
ADDA/DGP/ED/N-81/2022-23Tender Authority
Asansol Durgapur Development Authority ViewPurchaser Address
-Website
http://https://addaonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in excavation of foundation trenches or drains, in all shorts of soil (including mixed soil but excludinglaterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 meter as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.50 M .
95
-
119.27
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation foundation.
95
-
77.54
... More
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
126
-
640.86
... More
Supplying and laying polythene sheet (150gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
952
-
24
... More
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25mm to 30mm thick wooden shuttering without staging in foundation. For the work in foundation (PCC side and column raft sides)
371
-
205
... More
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. Ground Floor.
77
-
363
... More
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering & reinforcement, if any, in ground floor as per relevant IS codes. Pakur variety.
6.5
-
4747.69
... More
Ordinary cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering & reinforcement if any.Pakur Variety ground Floor
150
-
5256.11
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary) cuttings to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Tor steel/Mild steel, For the work in all Floor . JSW/JSPL/SHYAM/SRMB/ELECTROSTEEL/SSL
2
-
54413.87
... More
Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth .
16.1
-
4812
... More
Plaster (to wall,floor,ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (excluding cost of cheaping over concrete surface where necessary) For the work in all Floor . 15 mm thick (1:6) plaster Ground Floor
177
-
136
... More
Neat cement punning about 1.5 mm thick in wall, dado,window sills, floor, etc. Cement 0.152 cum per 100 sqm
177
-
34
... More
G S T As applicable @ 12% on total work done value ( SL NO. - 1 to 87 )
1
-
153234.57
... More
Labour Welfare Cess @ 1% on total work done value including G S T ( SL NO. - 1 to 88)
1
-
14301.89