Asansol Durgapur Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Asansol Durgapur Development Authority - ADDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date4 Dec 2024
Closing Date19 Dec 2024
Tender Amount₹ 21,13,165
Costs
EMD
₹ 42,263Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ADDA_777115_1Bid Award Id
ViewTender No
ADDA/DGP/ED/N-28/2024-25(SL-3)Tender Authority
Asansol Durgapur Development Authority ViewPurchaser Address
-Website
http://https://addaonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
110
640
70494.6
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
275
324
89100
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. Pakur Variety
28
4693
131409.62
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Pakur Variety
99
5218
516642.8
... More
Supplying Steel reinforcement for R.C.C. work ready to use " cut and bend" rebars (i.e. Stirrups for all types & all shapes, bars of all shapes, tie bars, chairs, etc. for slabs, beams, columns, piles, raft etc.) of approved make from factory/ workshop to construction site including placing in position and binding all complete as per drawing & direction of engineer in Charge. Thermo-Mechanicully Treated bars of grade Fe-500D or more. For works in foundation and upto roof of ground floor/ upto 4m. Note:- Add extra over the rate of ground floor/initial 4m. or basement should follow. It-40(b) (P-44) of Seh. of Rates, Vol.-I (B) SRMB/ELEGANT STEEL, CAPTAIN, BALAJI SAKTI, HEXA, RUNGTA STEEL, ADHUNIK, SUPER SHAKTI, SALUJA GOLD, RASHMI TMT, SEL, SEL TIGER
10.1
54442
549864.25
... More
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25mm to 30mm thick wooden shuttering without staging in foundation. For the work in foundation (PCC side and column raft sides)
20
205
4100
... More
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. Ground Floor.
731
328
239768
... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications
134
115
15410
... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.Including supplying empty cement bags in good condition.
510
6
3468
... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge. (a) Depth upto 1.5 m.
150
376
56400
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 15 cm. Including watering and ramming etc. layer by layer, complete. With earth obtained from excavation of foundation.
138
77
10700.52
... More
Construction of Plaque with Brickwork Stracture providing letters embossed over Granite Board (900mm x 1200mm) & fixing it, Plastering, painting etc. complete at site as per drawing, spacification and direction of Executive engineer
1
10417
10417
... More
G S T As applicable @ 18% on total work done value ( SL NO. - 1 to 15)
1
319155
319155.67
... More
Labour Welfare Cess @ 1% on total work done value including G S T ( SL NO. - 1 to 16)
1
20922
20922.43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements