Asansol Durgapur Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Asansol Durgapur Development Authority - ADDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date13 Jun 2024
Closing DateCancelled
Tender Amount₹ 80,57,779 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.2 mm). Manual Means.

927

2081967

2245.92

... More
Prime Coat.Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm) .

6180

152398

24.66

... More
Tack Coat.Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). On Granular surfaces treated with primer (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.)

6180

54322

8.79

... More
Open-Graded Premix Surfacing using Viscosity grade Paving Bitumen and HMP Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone ggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by tipper trucks or by any other suitable arrangements, laying the mixture uniformly over the surface with paver finisher, including manual operations as and when required for proper line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot Mix Plant and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Hot Mix Plant and other machinery, pay of operators, cost of fuel and lubricants etc. complete as per Clause 510 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). Using Drum mix Type HMP of minimum capacity 40-60 TPH.

6180

613983

99.35

... More
Seal Coat Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). By Manual Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)

6180

220317

35.65

... More
Spreading of sand over the bituminous surface @ 0.003 m3 per m2 of surface from the road side stacks and carriage of the same up to a distance of 150 m from stack complete including cost of sand.

6180

10691

1.73

... More
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD.

192

18201

94.8

... More
Removal of rubbish , earth etc from the working site and disposal of the same beyond the compound in conformity with the municipal corporation rules for such disposal loading into truck and cleaning the site in all respect as per direction of E.I.C

100

16600

166

... More
Construction of Plaque with Brickwork Structure providing letters embossed over Granite Board (900 mm x 1200 mm) & fixing it, Plastering , painting etc complete at site as per drawing , specification and direction of the Executive Engineer.

1

10417

10417

... More
Sub-Total Cost

1

6761015

6761015.87

... More
Add GST @ 18% on Sub-Total Cost, i.e.

18

1216982

6761015.87

... More
Add Labour Welfare Cess @ 1% on Total cost after GST, i.e.

1

79779

7977998.73



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.