Asansol Durgapur Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Asansol Durgapur Development Authority - ADDA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date26 Oct 2024
Closing Date9 Nov 2024
Tender Amount₹ 18,77,665
Costs
EMD
₹ 37,553Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ADDA_764971_1Tender No
ADDA/DGP/ED/N-22/2024-25(SL-3)Tender Authority
Asansol Durgapur Development Authority ViewPurchaser Address
-Website
http://https://addaonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in excavation of foundation trenches or drains, in all shorts of soil (including mixed soil but excludinglaterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 meter as directed.The item includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1.50 M .
102
119
12165.54
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation foundation.
102
77
7909.08
Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
52
640
33324.72
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
158
324
51192
Supplying and laying polythene sheet (150gm/sqm) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
55
24
1320
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering & reinforcement, if any, in ground floor as per relevant IS codes. Pakur variety.
19
4673
88801.63
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25mm to 30mm thick wooden shuttering without staging in foundation.
25
205
5125
Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth .
13
4812
62556
Brick work with 1st class bricks in cement mortar (1:6) In superstructure, Ground Floor
43
5035
216505
Hire and labor charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns , lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) . Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. Ground Floor.
360
363
130680
Ordinary cement concrete ( mix 1:1.5:3) with graded stone chips ( 20 mm nominal size) excluding shuttering & reinforcement if any.Pakur Variety ground Floor
51
5183
264377.37
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary) cuttings to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Tor steel/Mild steel, For the work in all Floor . SRMB/Elegant Steel/Captain/Balaji Shakti/Hexa/Rungata Steel/Adhunik/Super Shakti/Saluja Gold/Rasmi TMT/Sel/Sel Tiger
6.28
56498
354808.95
Labour for Chipping of concrete surface before taking up Plastering work.
255
21
5355
Plaster (to wall,floor,ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (excluding cost of cheaping over concrete surface where necessary) . 10 mm thick (1:4) plaster Ground Floor
192
123
23616
Plaster (to wall,floor,ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (excluding cost of cheaping over concrete surface where necessary) .15 mm thick (1:6) plaster Ground Floor
230
136
31280
Plaster (to wall,floor,ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (excluding cost of cheaping over concrete surface where necessary). 20 mm thick (1:6) plaster Ground Floor
125
155
19375
Neat cement punning about 1.5 mm thick in wall, dado,window sills, floor, etc. Cement 0.152 cum per 100 sqm
52
34
1768
M.S gate of jail type as per approved design made of strong M.S frame work, intermediate stiffners and round / square bars or angles.M.S.sheet ( not less than 14 gauge) gussets, cleats etc including necessary riverting, bolting, welding , locking and hanging arrangements, fitting & fixing complete as per direction of the Engineer- in- charge.
1300
100
131170
M.S. or W.I. Ornamental grill of approved design joints continuously welded with M.S. or W.I. flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.Grill weighing above 16 Kg./sq.mtr and above
260
96
25209.6
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. All Floor
75
29
2175
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface :With super gloss (hi-gloss) -Two coats (with any shade except white) All Floor
75
79
5925
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.35 mm. thick. Ground Floor
138
323
44574
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed .
9.75
178
1735.5
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. Two Coat.
260
45
11726
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.Normal Acrylic Emulsion. (Two Coat )
260
67
17420
White washing including cleaning and smoothening surface thoroughly.All floors :Three coats (on new works only).
326
20
6523.26
Supplying, fitting and fixing UPVC pipes A-Type and fittings confirming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor, etc. cutting trenches in any soil through masonary concrete structures etc. if necessary and mending good damagaes including jointing with joining materials(spun,yarn,valamoid/M-seal etc.) complete i) 110 mm dia UPVC Pipes:
22.2
251
5572.2
UPVC Fittings . Bend 87.5 degree 110mm dia.
6
140
840
Shoe 110mm dia.
6
111
666
Construction of Plaque with Brickwork Structure providing letters embossed over Granite Board (900 mm x 1200 mm) & fixing it, Plastering , painting etc complete at site as per drawing , specification and direction of the Executive Engineer
1
10417
10417
G S T As applicable @ 18% on total work done value ( SL NO. - 1 to 33 )
1
283587
283587.6
Labour Welfare Cess @ 1% on total work done value including G S T ( SL NO. - 1 to 34)
1
18590
18590.74
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements