Asansol Durgapur Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Asansol Durgapur Development Authority - ADDA Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date19 Oct 2022
Closing Date7 Nov 2022
Tender Amount₹ 12,32,975 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and delivery at site the PVC armoured Alumunium cable of size 16 sq.mm x 4 core of Make- KEI / Havells / Polycab

9

-

377

... More
Laying of above cable after cutting the trench in all sorts of soil of size 460 mm x 760 mm average depth, with sand & brick protection (08 Nos. brick per meter, width wise) including back filling of shifted soil to restore the surface in original conditions .

130

-

172

... More
Drawing / Laying of cable 2 core x 10 sq.mm on wall surface with S&F of MS saddles / concealed system with earthing attachment in 1 x10 SWG GI wire,making holes etc.as necy. mending good damages & painting.

120

-

57

... More
Cutting Channel on wall surface 40 mm x 40 mm for grouting the different sizes PVC cable in concealed systemalong with mending good the damages.

42

-

87

... More
Supply ,Instal, connection of Copper Busbar made with sheet steel enclosure for 315 Amps. ,415 Volt capacvity of make -Havells or equivalent

1

-

21945

... More
Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 mtrs.long and 1x4 SWG GI ( hot dip ) wire ( 4 mt.long ) 13 mm dia x 80 mm long GI bolts , double washers including supply and fixing of 15 mm GI pipe protection ( 1 mtr.long ) to be fitted with bitumen partly under the ground level driven to an average depth of 3.65 mtr.below the ground level and restoring surface duly rammed

6

-

1524

... More
Treatment of soil by using salt & charcoal or coke .

6

-

531

... More
Finishing the end of the PVC cable of size 95 sq.mm x 3.5 core.

21

-

310

... More
Finishing the end of the PVC cable of size 50 sq.mm x 3.5 core.

10

-

209

... More
Finishing the end of the PVC cable of size 35 sq.mm x 3.5 core.

12

-

158

... More
Finishing the end of the PVC cable of size 16 sq.mm x 4 core.

8

-

95

... More
Dismantling with proper care for re-use of existing LT mainswitches / Changeover switches / 3 Ph. Meters / Busbar etc. along with MS clamps etc. from existing position with mending good the damages in original position.

1

-

9500

... More
Re-installation of LT mainswitches / Changeover switches / 3 Ph. Meters / Busbar etc. along with MS clamps etc. and grouting the all equipments in new position wall surface with MS clamps.

1

-

11500

... More
Taken out all the existing cables from inside the wall surface after cutting the channel in surface and mending good the damages with necessary messonary work.

48

-

30

... More
Supply & fixing of LT Switches covering protection system made with colour coated sheet and the base fabricated with MS angle structurewith weldin & grouted on the wall with cement concrete

1

-

32200

... More
Rearrangement along with connection of all existing LT switches / Change over switch etc for proper use of Automatic function of DG set,

1

-

12000

... More
Sub Total

-

-

-

... More
GST 12%

1

-

130796.52

... More
CESS 1%

1

-

12207.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.