Asansol Durgapur Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Asansol Durgapur Development Authority - ADDA Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date15 Sep 2022
Closing Date23 Sep 2022
Tender Amount₹ 4,77,414 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in filling in foundation trenches or plinth with goode earth , in layers not exceeding 150 mm. Including watering and ramming etc. layer by layer, complete. With earth obtained from excavation of foundation.

1

-

77.54

... More
Flling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water and ramming complete including cost of sand. [ By Fine sand ]

13.1

-

640.86

... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand .

124.5

-

324

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. [ Pakur variety]

4.1

-

4827.05

... More
Brick work with 1st class bricks in cement mortar (1:6)

-

-

-

... More
In foundation and plinth

16.1

-

4812

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with rewuired bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting , fixing and stricking out after completion of works.

-

-

-

... More
25 mm to 30 mm shuttering without staging in foundation etc.

11

-

205

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes In Ground Floor & foundation with Concrete mixture

34

-

5391.65

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, strips binders etc. including supplying of roads, initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending etc. complete as per drawing and direction For M.S. / Tor steel.[SAIL/TATA /RINL] upto Ground floor roof level.

0.03

-

55009.08

... More
125mm thick brick work with 1st ciass bricks in cement mortar (1:4) in ground floor.

5.6

-

664

... More
Plaster (to wall, floor, etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints roughening of concrete surface including chipping and application of cement slurry where necessary etc. complete.

-

-

-

... More
With 6:1 cement mortar ,15 mm thick plaster in ground floor.

286

-

136

... More
With 6:1 cement mortar ,20 mm thick plaster in ground floor.

148

-

155

... More
Neat cement punning about 1.5 mm thick in wall , dado, window sills, floor, drain etc.

148

-

34

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

14.5

-

166

... More
Sub-Total

1

-

422041.95

... More
GST-12% (SGST=6% & CGST=6%)ADD

1

-

50645.03

... More
WEST BENGAL LABOUR WELFARE CESS =1% ADD

1

-

4726.87



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.