Asansol Durgapur Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Asansol Durgapur Development Authority - ADDA Tender
Civil And Construction
Building Construction
Eprocure
Opening Date15 Sep 2022
Closing Date23 Sep 2022
Tender Amount₹ 4,77,414
Costs
EMD
₹ 9,548Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ADDA_405815_2Bid Award Id
ViewTender No
ADDA/ASN/ED/N-34(2022-2023)Tender Authority
Asansol Durgapur Development Authority ViewPurchaser Address
-Website
http://https://addaonline.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in filling in foundation trenches or plinth with goode earth , in layers not exceeding 150 mm. Including watering and ramming etc. layer by layer, complete. With earth obtained from excavation of foundation.
1
-
77.54
... More
Flling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating same by through saturation with water and ramming complete including cost of sand. [ By Fine sand ]
13.1
-
640.86
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand .
124.5
-
324
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. [ Pakur variety]
4.1
-
4827.05
... More
Brick work with 1st class bricks in cement mortar (1:6)
-
-
-
... More
In foundation and plinth
16.1
-
4812
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with rewuired bracing for concrete slabs, beams, columns, lintels, curved or straight including fitting , fixing and stricking out after completion of works.
-
-
-
... More
25 mm to 30 mm shuttering without staging in foundation etc.
11
-
205
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes In Ground Floor & foundation with Concrete mixture
34
-
5391.65
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, strips binders etc. including supplying of roads, initial straightening and removal of loose rust (if necessary) cutting to requisite length hooking and bending etc. complete as per drawing and direction For M.S. / Tor steel.[SAIL/TATA /RINL] upto Ground floor roof level.
0.03
-
55009.08
... More
125mm thick brick work with 1st ciass bricks in cement mortar (1:4) in ground floor.
5.6
-
664
... More
Plaster (to wall, floor, etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints roughening of concrete surface including chipping and application of cement slurry where necessary etc. complete.
-
-
-
... More
With 6:1 cement mortar ,15 mm thick plaster in ground floor.
286
-
136
... More
With 6:1 cement mortar ,20 mm thick plaster in ground floor.
148
-
155
... More
Neat cement punning about 1.5 mm thick in wall , dado, window sills, floor, drain etc.
148
-
34
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
14.5
-
166
... More
Sub-Total
1
-
422041.95
... More
GST-12% (SGST=6% & CGST=6%)ADD
1
-
50645.03
... More
WEST BENGAL LABOUR WELFARE CESS =1% ADD
1
-
4726.87