Airports Authority Of India Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Airports Authority Of India - AAI Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 3,39,92,860 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) Second Year

12

-

-

... More
SH-II: Replacement of media in ACF, OC & PSF

-

-

-

... More
Complete Removal and dismantling of old media from existing Pressure Sand Filter of WTP, including cleaning the same, check for any cracks and making good the same through welding, painting the same with two coats of anti corrosive paint and topping up the PSF with new media including supply of new media and replacement of all old PVC stainer with new as per site requirement & Manufacturer's standard complete etc. as required for followings. WTP-Specifications of existing PSF:- Diameter: 2.6 meters Height on straight: 1500 mm Maximum pressure: 4.5kg/cm2 Minimum pressure: 1.0kg/cm2 Average:flow(Each): 45,000 LPH Media quantity: As per OEM requirement

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
Complete Removal and dismantling of old media from existing Activated Carbon Filter of WTP, including cleaning the same, check for any cracks and making good the same through welding, painting the same with two coats of anti corrosive paint and topping up the ACF with new media including supply of new media including supply of new media and replacement of all old PVC stainer with new as per site requirement & Manufacturer's standard complete as required. WTP-Specifications of existing ACF:- Diameter: 1.0 meters Height on straight: 2000 mm maximum Maximum pressure: 4.5kg/cm2 Minimum pressure: 1.0kg/cm2 Average:flow(Each): 45,000 LPH Media quantity: As per OEM requirement

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
Complete Removal & dismantling of old media from existing softner tank with new media including cleaning the same, check for any cracks and making good the same through welding, painting the same with two coats of anti corrosive paint and topping up the softner tank with new media including supply of new media and replacement of all old PVC stainer with new one & ION exchange resins as per site requirement & Manufacturer's standard complete as required. Specifications of existing Softner at WTP Expected Raw Water Hardness:- 500 ppm Expected Treated Water Hardness:- Less than 5 ppm Min. Expected Rate of flow: 60 Cub. Mtr./Hr. Media quantity: As per requirement & OEM Standard and as per instruction of EIC

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
Complete Removal and dismantling of old media from existing Oxidation Chamber of Water Treatment Plant, cleaning the same, check for any cracks and making good the damages through welding, painting the same with two coats of anti corossive paint and topping up the OC with new media including supply of new media as per site requirement & Manufacturer's standard complete as required. Specifications of existing OC:- Capacity: 95 cum/hr, 40,000 ltr/sqm/hr. Media quantity: As per OEM requirement and as per instruction of E-I-C.

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
Complete Removal and dismantling of old media from existing FRP Bobbin Wound Filter With Sand & Multiport Valve Top Mount of Water Body, including cleaning the same, check for any cracks and making good the same and supply and topping up the filter with new media and replacement of all old PVC stainer with new as per site requirement & Manufacturer's standard etc. complete as required to make serviceable.

-

-

-

... More
a) First Year

5

-

-

... More
b) Second Year

5

-

-

... More
SH-III : Cleaning works for Water Tanks

-

-

-

... More
Complete dewatering and cleaning of storage tanks (having depth of 8 mtrs./2 mtrs. approx.) through high pressure mechanized cleaning of water tank to get rid of calcination, algae, sludge, sediment and other contaminants by bleaching solution, sodium hypochlorite and other standard chemical treatment to arrest microbiological contaminants etc. as required and as per instruction of Engineer-in-Charge of following volumes (approx.) including providing relevant safety kit and breathing appratus (oxygen mask, cylinder etc.) to cleaning personnel:

-

-

-

... More
2.47 lakh litres volume of water

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
14.29 lakh litres volume of water

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
19.09 lakh litres volume of water

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
6.46 lakh litres volume of water

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
8.00 lakh litres volume of water

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
SH-IV Electrical Work

-

-

-

... More
Supply, installation, testing & commissioning of Star Delta starter's on delay timer having range upto 120 sec and operating voltage 110-415 V AC, 30V DC and suitable current upto 5A.

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Supply, installation, testing & commissioning of Overload Relay having Ampere range upto 10 Amp, operating voltage 110V - 415 V AC.

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Complete rewinding the following capacity defective motor suitable for 230/415 volts with necessary copper winding and heat varnishing, replacement of bearing etc. complete as required including dismantling and reinstallation of the same at site.

-

-

-

... More
Upto 10 KW

-

-

-

... More
a) First Year

8

-

-

... More
b) Second Year

8

-

-

... More
Above 10 KW to 20 KW

-

-

-

... More
a) First Year

10

-

-

... More
b) Second Year

10

-

-

... More
Above 20 KW to 30 KW

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
Above 30 KW to 40 KW

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
SH-V : Supply of minor spares for Pumps for replacement.

-

-

-

... More
Providing & fixing of suitable size o-ring rubber for following capacity water pump as and when required

-

-

-

... More
for 0.75 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 1 hp pump

-

-

-

... More
a) First Year

12

-

-

... More
b) Second Year

12

-

-

... More
for 2 hp pump

-

-

-

... More
a) First Year

14

-

-

... More
b) Second Year

14

-

-

... More
for 3 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 5 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 7.5 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 10 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 15 hp pump

-

-

-

... More
a) First Year

11

-

-

... More
b) Second Year

11

-

-

... More
for 20 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 30 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 50 hp pump

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Providing & fixing of suitable size Mechanical seal for following capacity water as and when requiredpump

-

-

-

... More
for 0.75 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 1 hp pump

-

-

-

... More
a) First Year

12

-

-

... More
b) Second Year

12

-

-

... More
for 2 hp pump

-

-

-

... More
a) First Year

14

-

-

... More
b) Second Year

14

-

-

... More
for 3 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 5 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 7.5 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 10 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 15 hp pump

-

-

-

... More
a) First Year

11

-

-

... More
b) Second Year

11

-

-

... More
for 20 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 30 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 50 hp pump

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Providing & fixing of suitable size Bush for following capacity water pump as and when required

-

-

-

... More
for 0.75 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 1 hp pump

-

-

-

... More
a) First Year

12

-

-

... More
b) Second Year

12

-

-

... More
for 2 hp pump

-

-

-

... More
a) First Year

14

-

-

... More
b) Second Year

14

-

-

... More
for 3 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 5 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 7.5 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 10 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 15 hp pump

-

-

-

... More
a) First Year

11

-

-

... More
b) Second Year

11

-

-

... More
for 20 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 30 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 50 hp pump

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Providing & fixing of suitable size Coupling for following capacity water pump as and when required

-

-

-

... More
for 0.75 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 1 hp pump

-

-

-

... More
a) First Year

12

-

-

... More
b) Second Year

12

-

-

... More
for 2 hp pump

-

-

-

... More
a) First Year

14

-

-

... More
b) Second Year

14

-

-

... More
for 3 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 5 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 7.5 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 10 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
for 15 hp pump

-

-

-

... More
a) First Year

11

-

-

... More
b) Second Year

11

-

-

... More
for 20 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 30 hp pump

-

-

-

... More
a) First Year

4

-

-

... More
b) Second Year

4

-

-

... More
for 50 hp pump

-

-

-

... More
a) First Year

3

-

-

... More
b) Second Year

3

-

-

... More
Providing & fixing of suitable size oil seal for following capacity water pump as and when required

-

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
Providing & fixing of suitable size moisture sensor for following capacity water pump as and when required.

-

-

-

... More
for 13 hp pump

-

-

-

... More
a) First Year

2

-

-

... More
b) Second Year

2

-

-

... More
SH-VI : Miscellaneous works

-

-

-

... More
Supply, installation, testing & commissioning of Water Pressure Gauge having pressure range upto 16 kg/cm2 and suitable size as per site condition.

-

-

-

... More
a) First Year

5

-

-

... More
b) Second Year

5

-

-

... More
Scrubbing, cleaning the existing surface of cubicle panels / MS pipes and spray painting the same with two coats of synthetic enamel paint of approved brand and manufacturer of required colour over one coat of red oxide metal primer etc. to give an even shade as required.

-

-

-

... More
a) First Year

1000

-

-

... More
b) Second Year

1000

-

-

... More
Supply, installation, testing & commissioning of 6 lph @ 4 kg/cm2 dosing pump complete etc. as required.

-

-

-

... More
a) First Year

1

-

-

... More
b) Second Year

1

-

-

... More
Replacement of damaged old RO membrane from RO water Generation plant and installation of new RO membrance (8 inch dia DOW RO membrance BW 30-365), testing & commissioning of the same complete etc as required.

-

-

-

... More
a) First Year

10

-

-

... More
b) Second Year

10

-

-

... More
Supply of NACL (Iodind Free)

-

-

-

... More
a) First Year

250000

-

-

... More
b) Second Year

250000

-

-

... More
Supply of Sodium Hypochlorite (NaOCl 8% free chlorine)

-

-

-

... More
a) First Year

25000

-

-

... More
b) Second Year

25000

-

-

... More
Supply of Sodium Metabisulphite (SMBS) food grade

-

-

-

... More
a) First Year

150

-

-

... More
b) Second Year

150

-

-

... More
Supply of RO Antiscalant food grade

-

-

-

... More
a) First Year

230

-

-

... More
b) Second Year

230

-

-

... More
Supply of TCCA 90 granular

-

-

-

... More
a) First Year

75

-

-

... More
b) Second Year

75

-

-

... More
Supply of TASKI R2 (Cleaning chemical agent) or approved equivalent.

-

-

-

... More
a) First Year

75

-

-

... More
b) Second Year

75

-

-

... More
Supply of TASKI R3 (Cleaning chemical agent) or approved equivalent.

-

-

-

... More
a) First Year

75

-

-

... More
b) Second Year

75

-

-

... More
Supply of SUMA Inox D7.1 (Cleaning chemical agent) or approved equivalent.

-

-

-

... More
a) First Year

150

-

-

... More
b) Second Year

150

-

-

... More
Dismantling the existing panel and Supply, installation, testing, commissioning of indoor type wall mounted starter panel made out of 2 mm thickness CRCA sheet for suitable size confirming to IP 54, including hinged lockable double doors on the size of panel door & Framing & finishing with powder coating color shade RAL 7032 with complete wiring. The Panel Consists of 1. Provision of 7.5 Hp Star-Delta Starter-2 Nos. and 2 nos. DOL Starter with all accessories. 2. Emergency Switch 3. R Y B Indication Lamp for main line installed after MCCB 4. ON, OFF, TRIP indication lamp for each pump 5. Ammeter & Volt meter in main line 6.Ammeter for each pump 7. Exhaust Fan for panel cooling 8. Main Switch (100A TPN MCCB) 9. 2 nos. Selector Switch 1no. for volt meter and 1 no. for Ammeter 10. All pump will have separate MCB 11. Single phase 2 nos. spare terminal with 16A MCB. Panel are completely wiring with suitable size copper wire.

1

-

-

... More
Supply, installation, testing, commissioning of outdoor type SMPS panel made out of 2 mm thickness CRCA sheet for suitable size confirming to IP 65, including hinged lockable double doors( inner & outer) on the suitable size of panel door & Framing & finishing with powder coating color shade RAL 7032 with complete wiring. The Panel Consists of 1. 3 Nos. SMPS operating in 220V AC input and 18V/15A DC output having 3 nos. (+ve) terminal and 3nos. (-ve) terminal each 2. Single phase 16A MCB for panel switching 3. "ON" indication light 4. Panel Base frame (minimum height 2 ft. from ground) 5. Terminal Block (all DC terminal should connect in terminal block) Panel are completely wiring with suitable size copper wire.

1

-

-

... More
Supply and laying on surface/ trench etc. as per site conditions of 1100 volt grade PVC sheathed/XLPE 4 core 25 Sq. mm aluminium armoured conductor cable conforming to IS 7098 (Part-I) 1988.

100

-

-

... More
Supply, installation, testing & commissioning of online digital Flow meter with recording & monitoring device and other necessary equipment as required of INLET & OUTLET of WTP plant having suitable up to 200 mm dia pipe.

2

-

-

... More
RO FEED PUMPS :

-

-

-

... More
Supply, installation, testing and commissioning of vertical Multistage Inline Pump (SS 316 Impeller & Chamber) with 3 kw IE5 efficiency motor inbuild VFD & Pump Controller (anti hammering facility available) making base with concrete foundation etc. complete as required

2

-

-

... More
Capacity 20 M3/Hr.

-

-

-

... More
Head-30mtr

-

-

-

... More
Quantity-2 Nos(1W+1S)

-

-

-

... More
Supply, installation, testing and commissioning of down flow ACTIVATED CARBON FILTER having capacity 20000 LPH consisting vertical cylindrical mild steel pressure vessel with dished end, having size of 1200 mm dia X 1875mm height Vertical type one set of 80 mm dia nominal bore frontal mild steel pipe work for inlet, outlet, back wash and rinse line and 5 No butterfly valve having hand lever type complete all as specified and directed.

1

-

-

... More
Note: - (i) The pressure vessel shall be made of medium Grade MS Sheet 5 mm thick

-

-

-

... More
(ii) Dished ends shall be machine made of medium Grade MS Sheet 5 mm thick

-

-

-

... More
(iii) The filter plant shall ensure even distribution across the surface area of the filter bed, header, lateral system & bottom collecting system.

-

-

-

... More
(iv) The plant shall have Air release arrangement with 2 No pressure gauge to monitor head loss across the filter and sampling cocks on inlet and outlet ends. The filter plant shall have full charge of filter media as per manufacturer’s design

-

-

-

... More
(v) Depth of filter media shall 1000 mm and total media quantity shall 1130 kgs (Gravels, Pebbels, Silex, Core Silex & Activated Carbon).

-

-

-

... More
(vi) The filter have man hole, hand hole and supporting legs.

-

-

-

... More
(vii) The job shall include necessary surface dressing, PCC/RCC foundation as required complete all as specified & as directed by  manufacturer & the same duly approved by officer.

-

-

-

... More
(viii) The vessel shall be painted internally with 2 coats of anticorrosive and non toxic black bituminous paint (compatible with drinking water) and external surface shall be painted with 2 coats of Synthetic Enamel paint over a coat of red oxide primer

-

-

-

... More
(xviii) The plant shall be designed for a flow of 20000 LPH

-

-

-

... More
(xxi) The backwash frequency shall be every 12 hours (twice a day) for continuous operating unit. If unit is operated intermittently, the total operating time in service cycles shall be limited to 5-6 hours before next back wash & back wash time 15-20 minutes.

-

-

-

... More
ACTIVTAED CARBON FILTER - ACF1200

-

-

-

... More
FLOW RATE(m3/hr) - 20

-

-

-

... More
QUANTITY(NOS) - 1

-

-

-

... More
FILTER DIA(MM) - 1200

-

-

-

... More
FILTER HEIGHT(MM) - 1875

-

-

-

... More
SHELL THICKNESS(MM) - 5

-

-

-

... More
DISHEND THICKNESS(MM) - 5

-

-

-

... More
FRONTAL PIPE WORK(MM) - 80

-

-

-

... More
MEDIA DEPTH(MM) - 1000

-

-

-

... More
MEDIA QUANTITY - 1130

-

-

-

... More
BACKWASH TIME - 20-30MINUTES

-

-

-

... More
Supply, Installation, Testing & Commisioning of 10M3/HR RO plant system shall be having capacity to treat the raw water. The treated water should have TDS less as per WHO standards. The operating voltage to 230 volt AC +/- 10% alongwith required capacity high pressure pump and solenoid valves, dry run protection of pump, automatic tank level control, inbuilt auto flush timer for periodic flushing of membranes, over voltage and over current protection with switch mode power supply system complete in all respects including installation, fittings etc. complete as required.

1

-

-

... More
Capacity-10m3/hr

-

-

-

... More
Maximum Permate Flow-10m3/hr

-

-

-

... More
Array-1:0

-

-

-

... More
Membrane Quantity-10 Nos

-

-

-

... More
Membrane Size-8 inch

-

-

-

... More
Number of Pressure Tube-2Nos

-

-

-

... More
Pressure Tube Rating-250PSI

-

-

-

... More
Size of Pressure Tube-8 Inch

-

-

-

... More
Element of Pressure Tube-5 nos

-

-

-

... More
Membrane -Hydramem

-

-

-

... More
Recovery of RO plant-50% to 75%

-

-

-

... More
High Presure Pump-2 nos(1W+1S)

-

-

-

... More
Capacity of High Pressure Pump-14.5m3/hr

-

-

-

... More
Head of High Pressure Pump-170mtr

-

-

-

... More
MOC of High Pressure Pump-SS316

-

-

-

... More
Motor Rating of High Pressure Pump-11KW

-

-

-

... More
Motor Speed of High Pressure Pump-2900 RPM

-

-

-

... More
Micron Cartrige Filter-2 nos

-

-

-

... More
Micron Cartridge Size-Jumbo 20" Long

-

-

-

... More
Micron Cartridge MOC-PP

-

-

-

... More
Micron CartridgeElement/Type-PP Spiral Wound

-

-

-

... More
Micron Cartridge Rating-5 Microns

-

-

-

... More
Electrical Panel-1Set

-

-

-

... More
ORP Meter-1et

-

-

-

... More
Drump Valve-1 Set

-

-

-

... More
Instrument List

-

-

-

... More
Pressure Gauge Quantity in Nos-1Nos

-

-

-

... More
Pressure Gauge Type-Bourdon with Glycerine Filled

-

-

-

... More
Pressure Size-150mm

-

-

-

... More
Pressure Range-0-40kg/cm2

-

-

-

... More
Location-RO Wet Panel

-

-

-

... More
Low Pressure Switch Quantity-1 Nos

-

-

-

... More
Low Pressure Switch Type-Spring Actuated

-

-

-

... More
Low Pressure Location-RO Feed

-

-

-

... More
High Pressure Switch Quantity-1 Nos

-

-

-

... More
High Pressure Switch Type-Spring Actuated

-

-

-

... More
High Pressure Location-High Pressure Pump Delivery

-

-

-

... More
Conductivity Indicator Quantity-1 NOs

-

-

-

... More
Type-Digital Indicator

-

-

-

... More
Location-RO Permate Outlet

-

-

-

... More
The complete set should be factory assembled and tested .

-

-

-

... More
ALL NECESSARY INTER CONNECTING PIPING

-

-

-

... More
Providing and fixing all piping (as described below) and isolation control valves, non return valves etc. complete as required for making the system complete in all respect.

1

-

-

... More
UPVC piping (Schedule 40 PVC) - For all interconnecting piping for RO plant (Approx qty. 75 mtr)

-

-

-

... More
MS CLASS B - For all interconnecting piping for filter plant (Approx qty. 75 mtr)

-

-

-

... More
RO WATER DOMESTIC SUPPLY

-

-

-

... More
Supply & installation, testing and commissioning of 2 nos Vertical Multistage Inline Pump (SS 316 Impeller & Chamber) with 2.2 kw IE5 efficiency motor, inbuild VFD & Pump Controller (anti hammering facility available),With Modbus for BMS. base frame, SS 316 Suction & Discharge Manifold, Pressure Transmitter,Pressure Gauge & 200 LTR PN 10 Pressure tank etc. complete as required.

1

-

-

... More
Capacity-6.5m3/hr

-

-

-

... More
Head-60mtr

-

-

-

... More
Quantity-2 Nos(1W+1S)

-

-

-

... More
RO WATER INTERNATIONAL SUPPLY

-

-

-

... More
Supply & installation, testing and commissioning of 2 nos Vertical Multistage Inline Pump (SS 316 Impeller & Chamber) with 2.2 kw IE5 efficiency motor, inbuild VFD & Pump Controller (anti hammering facility available),With Modbus for BMS. base frame, SS 316 Suction & Discharge Manifold, Pressure Transmitter,Pressure Gauge & 200 LTR PN 10 Pressure tank etc. complete as required.

1

-

-

... More
Capacity-1.2m3/hr

-

-

-

... More
Head-40mtr

-

-

-

... More
Quantity-2 Nos(1W+1S)

-

-

-

... More
Supply & installation, testing and commissioning of horizontal centrifugal pump motor set with Stainless Steel SS 304 stage casing,impellers,shaft,sucton & discharge casing as per IEC standrads of handing salt water suitable operation on 3phase,50Hz,415+/- volts AC supply set with IE3 induction motor including mounting baseframe & including all neccessary accessories complete as required.

2

-

-

... More
Capacity-20m3/hr

-

-

-

... More
Head-18mtr

-

-

-

... More
Quantity-2 Nos(1W+1S)

-

-

-

... More
Dismalting of Salt suction pump with other accessories and including lifting, cutting, grinding, breaking etc. complete as required.

1

-

-

... More
Supply & installation, testing and commissioning of continues type twin rotary Air Blower with construction in cast iron with V belt drive of capacity 200 cum/hr ,pressure 0.42kg/cm2 suitable for operation on 3 phase,50HZ,415+/- ac supply with suitable IE3motor 4 pole mounted on a channel base plate including all necessary accessories compete as required in compliance to the SCC & GCC and as per direction and complete satifaction of the Enginneering in Charge.

1

-

-

... More
Dismalting of Existing Air blower with other accessories and including lifting, cutting, grinding, breaking etc. complete as required.

1

-

-

... More
Softener feed pump Supply & installation, testing and commissioning of vertical inline multistage centrifugal pump motor set with SS04 stage casing,impellers,shaft,uction,& discharge casing as per IEC standards of capacity 64.8m3/hr & head-40m suitable for operation on 3phase ,50hz415+/- AC supply set with suitable IE5 motor of 2pole 15kw including all necessary accessories complete as required in complaince to the SCC & GCC and as per direction and complete satisfaction of the Engineer in Charge.

2

-

-

... More
Dismalting of Existing Softener Feed Pump with other accessories and including lifting, cutting, grinding, breaking etc. complete as required.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.