Uttarakhand Renewable Energy Development Agency Tender

View complete overview of Uttarakhand UREDA Tender

Uttarakhand Renewable Energy Development Agency - UREDA Tender

Works
Water Storage And Supply
Eprocure
Opening Date7 Dec 2018
Closing Date15 Dec 2018
Tender Amount₹ 5,21,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

450

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

280

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

90

-

-

... More
Earth Work in back filling

310

-

-

... More
Dismantling of RCC structures

10

-

-

... More
Dismantling of Stone Masonry work

90

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

30

-

-

... More
Cement Concrete 1:2:4 ( M 15)

116

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

338.2

-

-

... More
Reinforced Cement Concrete 1:1:2 ( M 25)

55

-

-

... More
Steel Reinforcement for RCC

32

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

212

-

-

... More
C.R.R Stone Masonry in 1:4 Cement Mortar

150

-

-

... More
HP Stone Pitching

121.4

-

-

... More
Stone Filled Wire Crates

230

-

-

... More
Dewatering

615

-

-

... More
MS Pipe 400 Dia, for Flushing

30

-

-

... More
Providing & Fixing of Trash Rack

6

-

-

... More
Gates for Weir Intake and Flushing Conduit including Hoist etc.

2

-

-

... More
Coffer dam for river diversion

1

-

-

... More
FEEDER CHANNEL, DESILTING TANK

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

80

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

50

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

45

-

-

... More
Earth Work in back filling

75

-

-

... More
Dismantling of Stone Masonry work

25

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

20

-

-

... More
Cement Concrete 1:2:4 ( M 15)

25

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

150

-

-

... More
Reinforced Cement Concrete 1:1:2 ( M 25)

5

-

-

... More
Steel Reinforcement for RCC

15

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

20

-

-

... More
C.R.R Stone Masonry in 1:4 Cement Mortar

30

-

-

... More
HP Stone/ Boulder Pitching

50

-

-

... More
Stone Filled Wire Crates

260

-

-

... More
Providing & fixing of trash rack

0.5

-

-

... More
Plastering in 1:4 Cement Sand Mortar in channel

115

-

-

... More
Valves for Flushing Conduit (350 mm)

2

-

-

... More
Gate with Hoist

1.2

-

-

... More
WATER CONDUCTOR: POWER CHANNEL

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

140

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

80

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

35

-

-

... More
Earth Work in back filling

130

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

20

-

-

... More
Cement Concrete 1:2:4 ( M 15)

15

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

50

-

-

... More
Steel Reinforcement for RCC

4

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

130

-

-

... More
C.R.R Stone Masonry in 1:4 Cement Mortar

265

-

-

... More
HP Stone/ Boulder Pitching

45

-

-

... More
Stone Fill Wire Crates 8 gauge

340

-

-

... More
Plastering in 1:4 Cement Sand Mortar in channel

1650

-

-

... More
FOREBAY

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

30

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

25

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

10

-

-

... More
Earth Work in back filling

35

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

18

-

-

... More
Cement Concrete 1:2:4 ( M 15)

10

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

25

-

-

... More
Steel Reinforcement for RCC

2

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

80

-

-

... More
R.C.R Stone Masonry in 1:4 Cement Mortar

65

-

-

... More
Stone/ Boulder Pitching

25

-

-

... More
Stone Fill Wire Crates

125

-

-

... More
Providing & fixing of trash rack

1

-

-

... More
Gate & Hoisting arrangement

2.75

-

-

... More
Valves for Flushing Conduit

1

-

-

... More
PENSTOCK INCLUDING ANCHOR & SADDLE BLOCKS

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

45

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

18

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

10

-

-

... More
Earth Work in back filling

30

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

40

-

-

... More
Cement Concrete 1:2:4 ( M 15)

15

-

-

... More
Reinforced Cement Concrete 1:1.5:3 (M20)

65

-

-

... More
Steel Reinforcement for RCC

5

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

65

-

-

... More
Coursed R.R Stone Masonry in 1:4 Cement Mortar

45

-

-

... More
Stone/ Boulder Pitching

135

-

-

... More
Stone Fill Wire Crates

220

-

-

... More
Cutting re-welding of penstock after cleaning from inside 600 mm dia, 8 mm Thick

166.6

-

-

... More
POWER HOUSE BUILDING INCLUDING TURBINE FOUNDATION ETC. AND BATTERY ROOM, OPERATORS ROOM/GUEST HOUSE

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in over burden, soft rock or sand mixed with boulders

30

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

20

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

5

-

-

... More
Earth Work in back filling

35

-

-

... More
Dismantling of RCC structures

15

-

-

... More
Dismantling of Stone Masonry work

50

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand

25

-

-

... More
Cement Concrete 1:2:4 ( M 15)

15

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

55

-

-

... More
Reinforced Cement Concrete 1:1:2 ( M 25)

5

-

-

... More
Steel Reinforcement for RCC

5

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

50

-

-

... More
R.C.R Stone Masonry in 1:4 Cement Mortar

85

-

-

... More
Stone/ Boulder Pitching

30

-

-

... More
Stone Filled Wire Crates

110

-

-

... More
S/F of Doors & Windows

1

-

-

... More
Plastering in 1:4 Cement Sand Mortar

100

-

-

... More
Flooring & Tiles etc

1

-

-

... More
Painting & Finishing

1

-

-

... More
Internal & External Electrification

1

-

-

... More
Sanitary & Water Supply Arrangement

1

-

-

... More
Power Housel Treatment and Power House Area Development

1

-

-

... More
Security Fencing & Gate etc.

1

-

-

... More
Dewatering

120

-

-

... More
TAIL RACE & FLOOD PROTECTION WORKS

-

-

-

... More
Earth Work in Excavation in Foundation & Trenches in overburden, soft rock or sand mixed with boulders

30

-

-

... More
Earth Work in Excavation in Foundation & Trenches in medium rock

15

-

-

... More
Earth Work in Excavation in Foundation & Trenches in hard rock

10

-

-

... More
Earth Work in back filling

25

-

-

... More
Cement Concrete 1:3:6 with cement, coarse sand and 40 mm stone ballast.

15

-

-

... More
Cement Concrete 1:2:4 ( M 15)

5

-

-

... More
Reinforced Cement Concrete 1:1.5:3 ( M 20)

20

-

-

... More
Steel Reinforcement for RCC

1.5

-

-

... More
R.R Stone Masonry in 1:6 Cement Mortar

50

-

-

... More
R.C.R Stone Masonry in 1:4 Cement Mortar

55

-

-

... More
Stone/ Boulder Pitching

120

-

-

... More
Stone Filled Wire Crates

150

-

-

... More
COMMUNICATION

-

-

-

... More
Earth work in excavation in soft rock

210

-

-

... More
Earth work in excavation in medium rock

76.3

-

-

... More
Providing & Laying PCC 1:3:6

12.34

-

-

... More
RR stone masonry 1:6

209.25

-

-

... More
RCC 1:1.5:3

8.2

-

-

... More
Reinforcement steel TMT

9.6

-

-

... More
PCC 1:2:4 (40 mm)

49.5

-

-

... More
RR Dry Masonry

190.2

-

-

... More
SCHEDULE OF RATES FOR E&M WORKS/ EQUIPMENT with ERECTION, TESTING AND COMMISSIONING complete

-

-

-

... More
Renovation of Horizontal Pelton Turbine with Inlet Valve governing and lubricating oil system etc.

2

-

-

... More
Renovation of Synchronous Generator complete with P.M.G. AVR, excitation system, synchronizing panel, neutral, earthing and surge protection equipment etc.

2

-

-

... More
Checking and repairing if any in LT and HT switchgear for auxiliary power supply to powerhouse and switchyard including all cable etc.

1

-

-

... More
Checking of Control and relay panel for outgoing feeders complete with synchronizing equipments, annunciating and alarming equipment including all protection and indication lamps etc.

2

-

-

... More
Replacement of Lead-acid batteries, charging equipments D.C. distribution board complete (110 V, 200 AH) with new battery bank & charger

1

-

-

... More
Step-up transformers 3.3/33KV Renovation, change of oil & oil filtration & Replacement of one 630 KVA, 415V/33 KV Transformer

2

-

-

... More
Generator transformer connections, bus ducts/cables for current transformers, potential transformers, instrumentation and protection complete.

1

-

-

... More
250 KVA station service transformer Renovation, change of oil & oil filtration.

1

-

-

... More
Checking of Power and control cable, with cable racks support etc. complete and repair.

1

-

-

... More
Checking of Switch Gear s, circuit breaker, CT, PT, LA etc. & there Renovation, repairs & replacement of damaged equipments

1

-

-

... More
Maintenance of illumination of Switchyards and tail race.

1

-

-

... More
Maintenance of Fire protection Equipments at various places in powerhouse and switchyards etc.

1

-

-

... More
Maintenance of Station grounding materials

1

-

-

... More
Switchyards structure and bus bar.

1

-

-

... More
Miscellaneous work/item (provide details of the extra work/item, if any, in a separate sheet)

1

-

-

... More
SCHEDULE OF RATES FOR TRANSMISSION & GRID CONNECTION WORKS

-

-

-

... More
Repairing & Maintenance of 33 KV Double circuit Line & equipments including terminal equipments at feeding & receiving ends.(refer details list annexed as 1)

-

-

-

... More
33 KV ST Pole 9.5 Meter long SP-33

44

-

-

... More
M.S Channel 150X50X6 mm

0.55

-

-

... More
Disk Insulator 4500 KG

88

-

-

... More
Pin Insulator

28

-

-

... More
Pin with nut

28

-

-

... More
V Type X arm

20

-

-

... More
Stay rod

44

-

-

... More
Stay wire

264

-

-

... More
Earth rod

8

-

-

... More
GI Earth wire

48

-

-

... More
ACSR weasel conductor

18

-

-

... More
GI Earth wire

508

-

-

... More
Earthing strip 35X6 mm

38

-

-

... More
CC work in 1:4:8

9.32

-

-

... More
Barbed wire

35

-

-

... More
Stay clamp

44

-

-

... More
Earth wire clamp

10

-

-

... More
Bracing holding clamp

44

-

-

... More
Nut and bolt

40

-

-

... More
Crossing brash 65X65X6 mm

22

-

-

... More
Danger plate with nut & bolt

22

-

-

5

-

-

... More
Excavation of double pole base platform & protection work

450

-

-

... More
R.R. Stone Masonry in 1:6 for double pole foundation & protection

137.5

-

-

... More
Supply, Installation & commissioning of 33KV pole mounted Tri Vector Import-Export MRI enabled meter (2 sets) including CTs/PTs and all associated equipment/accessories complete work at substation.

1

-

-

... More
Civil works for protection of sub-station equipments etc.

1

-

-

... More
Miscellaneous work/item (provide details of the extra work/item, if any, in a separate sheet)

1

-

-

... More
SCHEDULE OF TOTAL O&M PRICE

-

-

-

... More
Energy Cost for First Year with taxes

6500000

-

-

... More
Energy Cost for Second Year with taxes

6500000

-

-

... More
Energy Cost for Third Year with taxes

6500000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.