Uttarakhand Renewable Energy Development Agency Tender
View complete overview of Uttarakhand UREDA Tender
Uttarakhand Renewable Energy Development Agency - UREDA Tender
Eprocure
Opening Date15 Jun 2021
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UREDA_33485_1Bid Award Id
ViewTender No
01/UREDA/SHP/Badrinath/2021-22Tender Authority
Uttarakhand Renewable Energy Development Agency ViewPurchaser Address
-Website
http://http://ureda.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation in foundation trenches in ordinary soil and softrock and disposal of excavated earth as obtalined to a distance upto 1 km including all leads and lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, specifications and direction of E/I.
450
-
-
... More
Providing PCC. M-10 with nominal mix of 1:3:6 with 4 cm down coarse aggregate, approved coarse sand and cement including vibrating finishing, curing, T&P etc. as per direction of E/I.
2.1
-
-
... More
Providing P.C.C. M-20 with nominal mix of (1:2:4) with 4 cm down coarse aggregate, approved coarse sand and cement including scaffolding, vibrating, providing construction joints, finishing, curring , T&P etc. complete as per direction of E/I.
24.5
-
-
... More
Providing RCC. M-20 with nominal mix of (1:1.5:3) with 2 cm down graded, approved coarse aggregates approved coarse sand and cement excluding cost of reinforcement and including shuttering, scaffolding vibrating, providing construction joints, finishing, curings, T&P etc. complete as per direction of E/I.
18.9
-
-
... More
Providing and laying boulder in wire crates including labour, material, T&P etc. as per specification of drawing and direction of E/I.
33.66
-
-
... More
Providing River Bed Material as per drawing specifications & directions of E/I.
25
-
-
... More
Stone Boulder
9.8
-
-
... More
Gravel
7.35
-
-
... More
Sand
7.35
-
-
... More
Dewatering during construction including labour, T&P etc. complete as per direction of E/I.
1
-
-
... More
Fabrication and erection of 2 nos intake gates including fabrication, painting, transport, erection etc. as per drawings and specifications.
2
-
-
... More
Supplying and placing in position the mild steel trash rack including fabrication, painting, transport, erection etc. as per drawings and specifications.
3400.62
-
-
... More
Providing TOR steel reinforcement as per approved design and drawings including cartage to work site, bending and binding with annealed wire with cost of wire removal of rust, placing in position all complete as per specifications and directions of E/I.
1975.83
-
-
... More
Feeder Channel Cum Power Channel
-
-
-
... More
Repairing of the damaged plaster (60% of the total area) providing 15mm thick cement plaster (1:4) with clean coarse sand of 1.5 F.M. including cost of carriage screening curing, with all leads & lifts of scaffolding, taxes and royalty all complete as per specifications and directions of E\I.
552
-
-
... More
Repairing of slab covering channel P.C.C M-10 including material, labour T&P etc. complete as per specifications & direction of E/I.
9.6
-
-
... More
Clearance of silt and boulders from channel including labour, T&P etc. complete as per direction of E/I.
120
-
-
... More
Desilting Cum Forebay Tank
-
-
-
... More
Replacing of forebay gate including fabrication, painting, transport, erection etc. as per drawings and specifications.
1
-
-
... More
Clearing of flushing pipe including labour T&P etc. complete as per direction of E/I.
1
-
-
... More
Penstock
-
-
-
... More
Penstock painting in two coats including surface cleaning, cost of material, labour, T & P etc. complete as per specifications & direction of E/I
1243.44
-
-
... More
Maintence & Repair of 2No.Main inlet valves in P.H including material, labour T&P etc. as per directions of E/I
1
-
-
... More
Repairing of one no anchor block R.C.C M-20 (1:1.5:3) including material, labour T&P etc. as per directions of E/I.
3.24
-
-
... More
Power House and Switchyard
-
-
-
... More
Construction of boundary wall around power house and switchyard in stone masonry in CM 1:6 with fencing at top including excavation, PCC M-10, stone masonry, PCC M- 15 at top, angle iron post and fencing wire including all material labour T&P specifications & directions of E/I .
-
-
-
... More
Excavation
51
-
-
... More
PCC M-10 in foundation base
12.75
-
-
... More
Providing Stonemasonry1:6 C:M
106.88
-
-
... More
PCC M -15 at top of the wall
1.88
-
-
... More
Fencing with wire mesh & angle iron post
11.4
-
-
... More
M.S Angle (50*50*6)
250.57
-
-
... More
Wire Mess (100*100)
75
-
-
... More
Providing painting in power house, switchyard and staff quarters including material ,labour T&P etc. complete as per specifications & direction of E/I
-
-
-
... More
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete
1687.25
-
-
... More
White washing with lime to give an even shade
1687.25
-
-
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade
1687.25
-
-
... More
Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade
386.33
-
-
... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
106.46
-
-
... More
Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
42
-
-
... More
Foundation Base / Pillars for Electric Poles
-
-
-
... More
Earth work in excavation in foundation trenches in ordinary soil and softrock and disposal of excavated earth as obtained to a distance upto 1 km including all leads and lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, specifications and direction of E/I.
4.8
-
-
... More
Providing PCC. M-10 with nominal mix of 1:3:6 with 4 cm down coarse aggregate, approved coarse sand and cement including vibrating finishing, curing, T&P etc. as per direction of E/I.
0.8
-
-
... More
Stone masonry for erecting poles on either bank of river in C:M(1:6) including material, labour, T&P etc. complete as per drawing specification and direction of E/I.
9.99
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements