Civil Works Including Hm Works For Construction Of 130.6 M High Concrete Gravity

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For river diversion- river diversion pipe & cofferdam : Providing and laying M25/ A20 Grade Concrete for Intake and River Diversion Pipe as per drawing

1225.24

-

-

... More
For river diversion- river diversion pipe & cofferdam : Providing, fabricating and placing in position reinforced steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25 mm diameter annealed steel wire, welding whenever required, including cost of all matter

94.69

-

-

... More
For river diversion- river diversion pipe & cofferdam : Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2) for river diversion pipe

173.49

-

-

... More
For river diversion- river diversion pipe & cofferdam : Providing & placing of Colcrete (1:2:4) as shown in drawing in all respect

6985.93

-

-

... More
For river diversion- river diversion pipe & cofferdam : Drilling for Cement grouting

211.04

-

-

... More
For river diversion- river diversion pipe & cofferdam : Consolidation grouting with cement slurry in the drilled holes

633.13

-

-

... More
For river diversion- river diversion pipe & cofferdam : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.

7537

-

-

... More
For conventional concrete dam: Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(In area of thorny jungle)

20

-

-

... More
For conventional concrete dam: Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.

169478.3

-

-

... More
For conventional concrete dam: Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.

395449.36

-

-

... More
For conventional concrete dam: Underground Excavation of Galleries

1790.74

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying PCC (M-15/ A40), for backfilling

13831.88

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying RCC M-20/ A40 (Below Dam Foundation Level, where NSL is below foundation level)

3562.26

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying RCC M25/A20 in Dam Body as per design

146565.17

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying M15/A80 in the dam as per design

753933.54

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing and laying Cement Concrete Block (M25/ A20 Grade) for Protection Works

38232.28

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes

21099.44

-

-

... More
For conventional concrete dam (concreting & reinforcement in structure) : Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2) for Ecological Release

37.36

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.

49664

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c

4872

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)

24808.42

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Welded Wiremesh 100x100x4 mm for shotcreting

24808.42

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : 2500 long 25 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered (In Gallery Portion)

1137.5

-

-

... More
For conventional concrete dam (Rock Stabilization and Support in Dam Area) : Shotcreting of excavated gallery (at crown and sides) with 50mm thick shotcrete (M-35 grade) in Gallery Portion

1611.73

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.

300000

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : 76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c

5838

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)

150000

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Welded Wiremesh 100x100x4 mm for shotcreting

150000

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Drilling for consolidation grouting

66670

-

-

... More
For conventional concrete dam (Slope Stabilization in U/S & D/S of Dam Body (800 m U/S length & 200 m D/S length) : Consolidation grouting with cement slurry in the drilled holes (8 Bags / m length on Left bank and 5 bags / m length on right bank)

333350

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : 8000 long 32 mm Dia . Anchor bars at 2000c/c spacing both ways Staggered.

95760

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : 76 mm Dia. Drainage hole 7m long with perforated pipe @ 6000c/c

9310

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)

47880

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Welded Wiremesh 100x100x4 mm for shotcreting

47880

-

-

... More
For conventional concrete dam (Left Bank Cable Anchor) : 35000 long Cable Anchors at 1500 c/c spacing both ways Staggered.

4690

-

-

... More
For conventional concrete dam (Foundation Treatment) : 76 mm dia Hose Pipe for connecting the Gallery with Drainage Hole

3200

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Drilling for curtain grouting

6400

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Drilling for consolidation grouting

20770

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Curtain grouting with cement slurry in the drilled holes (3 bags / m length of grout hole)

19200

-

-

... More
For conventional concrete dam (Reservoir Rim Slope Stabilization Work) : Consolidation grouting with cement slurry in the drilled holes (8 Bags / m length of grout hole)

166160

-

-

... More
For conventional concrete dam: Providing & placing of formed drains in dam as per drawing .

4926.95

-

-

... More
For conventional concrete dam: Providing & placing of 300 dia ventilation pipe as per drawing

778.78

-

-

... More
For conventional concrete dam: 76 mm dia Hose Pipe for connecting the Gallery with Drainage Hole

778.78

-

-

... More
For conventional concrete dam: 300 mm wide PVC Water Stop

38686.6

-

-

... More
For conventional concrete dam: 200 mm dia Trap Drain

940

-

-

... More
For conventional concrete dam: Copper Water Stop

940

-

-

... More
For conventional concrete dam: GEVR Concrete to be provided on Dam Body in M15 Grade ( flyash- cement Ratio = 50:50)

22939.66

-

-

... More
For conventional concrete dam: Providing,fixing & installation of Lift in Dam (Capacity 340 kg/5 person)

1

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Providing and laying in position specified grade of reinforced cement concrete including the cost of centring. Shutterring, finishing and reinforcement-All work M25/ A20 GRADE CEMENT CONCRETE

150

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Providing, fabricating and placing in position reinforced steel for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, binding with 1.25 mm diameter annealed steel wire, welding whenever required, including cost of all matter

12

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Brick work with F.P.S. bricks of class designation 7.5 in superstructure in Cement mortar 1:6 ( I cement :6 coarse sand)

130

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Steel Railing in all respect. (30 m length @ 12 kg/m length)

0.36

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Doors in all respect

15

-

-

... More
For conventional concrete dam (Control Room & Power Pack Room) : Providing & fixing of Windows in all respect.

10

-

-

... More
For conventional concrete dam : Grounding System

1

-

-

... More
For conventional concrete dam : W- section/three beam section railing of corrugated sheet 3.0 mm thick at top of Dam ,parts of reservoir touching Dam & approches

27

-

-

... More
For conventional concrete dam : General Lighting for Dam and Galleries

1

-

-

... More
For conventional concrete dam : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.

952287

-

-

... More
For Water Conveyance System : Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.

61909.41

-

-

... More
For Water Conveyance System : Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.

61909.41

-

-

... More
For Water Conveyance System : Sand Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

49552.9

-

-

... More
For Water Conveyance System : Gravel Back filling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.9

287.75

-

-

... More
For Water Conveyance System : Plum Concrete (M-15 Grade)

287.75

-

-

... More
For Water Conveyance System : Providing & placing of PCC (M-15/ A40 Grade) as shown in drawing including all.

2228.67

-

-

... More
For Water Conveyance System : Providing & placing of RCC M-20/ A40 grade as shown in drawing including all.

11989.64

-

-

... More
For Water Conveyance System : Providing & placing of RCC M-30/ A20 grade as shown in drawing including all.

460.94

-

-

... More
For Water Conveyance System : Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes

809.29

-

-

... More
For Water Conveyance System : Supply,fabrication & erection of steel truss bridge as per detailed drawing including supply of all structural steel E-250 confirming IS 226 -1969 required for proper completion of the bridge including ground errection of the bridge and one coat of approved quality anticorrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting,labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.

480

-

-

... More
For Water Conveyance System : Supplying, fabrication & erection of pressure pipe conforming to IS 2002:2009 (Grade 2) of varying thickness 20 -30 mm for water conveyance system

14000

-

-

... More
For Water Conveyance System : Manholes for pipe dia of 1.5 m to be provided on WCS

30

-

-

... More
For Water Conveyance System : Air Supply Valves for pipe dia of 1.5 m to be provided on WCS

5

-

-

... More
For Water Conveyance System : Expansion Joints (Low Head)for pipe dia of 1.5 m to be provided on WCS

40

-

-

... More
For Water Conveyance System : Expansion Joints (Medium Head)for pipe dia of 1.5 m to be provided on WCS

20

-

-

... More
For Water Conveyance System : Expansion Joints (High Head)for pipe dia of 1.5 m to be provided on WCS

20

-

-

... More
For Water Conveyance System : Rock Anchor

90000

-

-

... More
For Water Conveyance System : Drainage Holes

22500

-

-

... More
For Water Conveyance System : Shotcreting of excavated rock slopes with 100mm thick shotcrete (M-35 grade) in 2 layers with wiremesh in between the layers (excluding wiremesh)

60000

-

-

... More
For Water Conveyance System : Welded Wiremesh 100x100x4 mm for shotcreting

60000

-

-

... More
For Water Conveyance System : Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material,labour and T&P etc. required for proper completion of the work.

134228

-

-

... More
For valve house: Excavation in all kinds of soil, soft rock, fissured rock, disintegrated and weathered rock including boulders exceeding 0.15 cum and up to 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling.

42.19

-

-

... More
For valve house: Excavation in hard rock including boulders exceeding 1.0 cum in volume and depositing the excavated materials in dump yard in regular layers with necessary leveling, sorting and stockpiling the useful materials separately as and where directed.

42.19

-

-

... More
For valve house: Providing & placing of PCC M15/A40 as shown in drawing including all.

2.7

-

-

... More
For valve house: Providing & placing of RCC M20/ A40 as shown in drawing including all.

23.11

-

-

... More
For valve house: Providing, cutting, bending and laying in position, binding, tack welding of reinforcement steel of different diameter and sizes

2.31

-

-

... More
For valve house: Supply,fabrication & erection of steel truss structure as per detailed drawing including supply of all structural steel E-250 confirming IS 226 -1969 required for proper completion of the structure including ground erection and one coat of approved quality anticorrosive (red oxide) paint of confirming IS 5660, all T&P, nuts and bolts, washers and also including supply and fixing of shop rivets required as per drawing. The work shall be executed in accordance to IS - 1915. The rates shall include cost of all material, its wastage, cutting, bending if required, welding, making holes, shop riveting,labour, T&P etc. required for proper completion of the work. including cost of cartage from workshop to Bridge Site including safe stacking of parts.

3

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Main Orifice Spillway Service Gates (Radial Type) 2 nos size(7x8.5m)

158.13

-

-

... More
Embedded Parts for Main Orifice Spillway Service Gates (Radial Type) 2 nos size(7x8.5m)

20.56

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Main Orifice Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(7x7.5m)

65.18

-

-

... More
Embedded Parts forMain Orifice Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(7x7.5m)

11.73

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : High Level Spillway Service Gate (Vertical Lift Fixed Wheel Type) 01 nos size(5x6.5m)

7.79

-

-

... More
Embedded Parts for High Level Spillway Service Gate (Vertical Lift Fixed Wheel Type) 01 nos size(5x6.562m)

2.34

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : High Level Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(5x 6m)

6.43

-

-

... More
Embedded Parts for High Level Spillway Stoplog Gate (Vertical Lift Slide Type) 01 nos size(5x 6m)

1.16

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Intake Trash Rack (Inclined) @ 400 kg/m size(2.2x2.50m)

2.2

-

-

... More
Embedded Parts for Intake Trash Rack (Inclined) @ 400 kg/m size(2.2x2.50m)

4.4

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Intake Stoplog Gate (Vertical Lift Slide Type) 01 nos size(1.5x 1.5m)

2.55

-

-

... More
Embedded Parts for Intake Stoplog Gate (Vertical Lift Slide Type) 01 nos size(1.5x 1.5m)

5.09

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Environmental Release Valve (Butterfly Valve) 0.3 mtr Dia

1

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : butterfly Valve at start of Water Conductor system (Butterfly Valve) 1.5 mtr Dia

1

-

-

... More
For HM Works (Trashrack, Gates, Hoist and Valves) : Stoplog Gate at Upstream of River Diversion Channel 01 nos size(4x 4m)

4.27

-

-

... More
Embedded Parts for Stoplog Gate at Upstream of River Diversion Channel 01 nos size(4x 4m)

8.53

-

-

... More
Contractor's infrastructure: Dispensary/First Aid Centre single floor Temporary Type

40

-

-

... More
Contractor's infrastructure: Temporary Fire Station (single floor)

100

-

-

... More
Contractor's infrastructure: working Shed for storage of Special T&P and Equipment Temporary Building single floor 2Nos

240

-

-

... More
Construction of 2 lane haul road on right bank to dam top as per guidelines of MORTH inclusive of all cost of labor, machinery, excavation, filling, GSB, WBM-I,II,III, scupper, catch pit, culvert, retaining wall, breast wall, drains, edge stone, parapet, gabion walls, bituminous prime coat, tack coat, Bituminous concrete & semi dense bituminous concrete, road safety & road furnitures and maintenance during the project construction period.

2.8

-

-

... More
Construction of 2 lane haul road on left bank to dam top as per guidelines of MORTH inclusive of all cost of labor, machinery, excavation, filling, GSB, WBM-I,II,III, scupper, catch pit, culvert, retaining wall, breast wall, drains, edge stone, parapet, gabion walls, bituminous prime coat, tack coat, Bituminous concrete & semi dense bituminous concrete, road safety & road furnitures and maintenance during the project construction period.

3.75

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.