Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_61823_1Bid Award Id
ViewTender No
EDC(H)/46/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth wire Clamp with nut and bolt for SP- 55
4
-
-
PP & Clamp with nut and bolts
8
-
-
Brasing Clamp with nut and bolts
4
-
-
Labour Charge: Cartage of 8 MVA Power Transformer
-
-
-
Transportation of 8 MVA T/F from Store to Site by truck with the help of 2 No. of crane at safe place..
1
-
-
Shifting of 08 MVA power T/F
-
-
-
Unloading of 8 MVA T/F at 33/11KV S/S Chilkia Ramnagar with all accessories like conservator tank, Radiators etc with the help of 2 No. of crane at safe place.
1
-
-
Shifting and mounting of 08 MVA power T/F with accessories from safe place in S/S to the plinth with help of crane and truck.
1
-
-
Errection Work of 8 MVA Power Transformer
-
-
-
11KV ( 300 Sq.mm ) XLPE Cable Cartage from store centre to Chikia site
100
-
-
Cartage charges for RAIL 3.5 M X 2 Nos.
170
-
-
Assembling of T/F fitting , i.e. radiators and conservator tanks etc. with main tank.
1
-
-
11KV ( 300 Sq.mm )Cable Laying in Trunch
100
-
-
Control Cable ( 4 x 2.5 ) sq. mm) Laying.
100
-
-
Making of 11KV Cable Loop in Trunch
2
-
-
Making of 11KV Cable termination I/D and O/D
2
-
-
Demolish the wall to enter the Power Transformer ( 3x5x .23 ) = 3.45 cum
3.54
-
-
Reconstruct the wall after work ( 0.23 x 3 x 5 ) =3.45 cum
3.45
-
-
12 mm thick plaster in 1:6 mortar (3x5) x 2= 30 Sqm.
30
-
-
Painting work exterior cement paint on boundary wall ( 160 x 3 ) = 480 Sqm.
480
-
-
Making of control cable trunch 150 mm below the ground level by 75 x 2 mm PVC Pipe (cost of pvc pipe include)
40
-
-
Special Earthing Work
-
-
-
Laying and moulding of M S Earth strip and GI Earth strip
210
-
-
Welding of G I Earth strip with yard equipment complete welding work including enty corosion paint on welded area
1
-
-
Driving the earth electrode in earth pit
50
-
-
Fixing of Neutral earthing with T/F and body earthing (Diagonial) by electric arc welding in proper way.
1
-
-
New 11 kv VCB Panels and Transformer (N) Earth work by digging mannualy 12 feet below the ground level for chemical earth system and connect with GI Strip (50X6mm) and making of chamber with cover on it.
2
-
-
Fencing work
-
-
-
Dismentling of palefencing after cutting by cutter or electric welding machine for yard extention work
20
-
-
Cartage of MS Angle and Channel and other small material
3993.6
-
-
Grouting of pale fencing support angle ( 65x65x6)
36
-
-
Providing and assembling of pale fencing 2.5 meter in height with horigentle angle 3 nos.(35x5)and support angle (35x5) at every 3 meter distance along with one no. gate.
30
-
-
Making of palefencing toe wall foundation with 1:6 brick work 1st step (0.45x0.15x 60 Rm)= 4.05cum + 2nd step (0.35x0.15x 60 ) = 3.15 + 4.05= 7.2 cum
7.2
-
-
RCC work1:1.5:3 on Toe wall plinth beam (0.23x0.15x 60)= 2.07 cum
2.07
-
-
Mild steel or iron work in plinth work such as rainforced concreat Qty.of steel 1.5% of RCC Qty. ( 2.07m3x1.5/100x7850)= 244 kg
244
-
-
Centering and shuttering for plinth beam (0.25x 60) x2= 30 Sqm.
30
-
-
Making of palefencing toe wall super structure with 1:4 brick work (0.23x0. 45x 60 Rm)= 6.21cum
6.21
-
-
12 mm thick plaster in 1:6 mortar (0.90+0.45+0.23)=1.6x60= 96 Sqm.
96
-
-
Fixing of fencing on toe wall by electric welding after addeting aditional angle to increase the height ( 60x2.5)= 150 Sqm.
150
-
-
Painting work on Pale fancing after removing rust by amry paper then applying two coats of industrial paint (Green) ( 30 x 2.5 ) x 2 = 150 Sqm.
150
-
-
Excavation of Earth Turfing Work
-
-
-
Cutting and uprooting of grass and wild bushed plants in yard. 320 Sqm
320
-
-
Final desposal,dressing,leveling of each with proper ramming and compecting complete in all labor / T&P.
320
-
-
Fine sand filling in yard to maintain its height ( 320 x 0.70) = 224 cum
224
-
-
Laying of 1:6:12 cement concreat in flooring of yard 100 mm thick including cost of material and labor etc.proper complete. 320 + 95=415 (415x0.1)= 41.5 cum
41.5
-
-
Spreding and leveling of 15-25 mm grit single for making yard bed including cost of stone grit ,labor,T&P work etc. ( 320 - 20 ) = 300 x 0.1 = 30 cum
30
-
-
Fencing work
-
-
-
Excavation of earth 0.8 m deep width ( 1 m X 33 RM) (33 X 1 X 0.8) = 26.4 cum
26.4
-
-
PCC Work ( 1:4:8 ) in trunch base ( 33 x 0.1 )= 3.3 cum
3.3
-
-
Super structure brick work in 1:4 ratio ( 33 x.23x.9)x2 = 13.662 cum
13.66
-
-
DPC Work on top side 1:3:6 (33 x 0.23x0.05)x2 = 0.759 cum
0.76
-
-
Fabrication cutting and grouting of M S Angle on Top side of trunch ( 33 x 2 ) 66 Meters
66
-
-
Cost of M S Angle ( 40x3 ) 33x2= 66 m x 1.8 kg = 118.8 kg + 13.2 kg support angle = 132 kg
132
-
-
12 mm thick plaster in 1:6 mortar ( 33 x 0.9 ) x 2= 59.4 Sqm.
59.4
-
-
Making of control cable trunch cover with 1:2:4 cement concreat and fixing of 8 mm steel bar in (35x5) angle frame size (0.45x0.6)Sqm.33 Rm/0.6Rm= 55 Nos.
55
-
-
Excavation of 11 kv out going cable
90
-
-
Laying of out going 11kv XLPE Cable in open trunch .
90
-
-
Construction of Transformer Plienth
-
-
-
Excavation of earth 1 m deep (4 X 4 X 1) = 16 cum
16
-
-
PCC Work ( 1:4:8 ) in Plienth base ( 16 x 0.1 )= 1.6 cum
1.6
-
-
Super structure brick work in 1:4 ratio ( 16 x0.15x.1.5) = 3.6 cum
3.6
-
-
Laying the 1 : 3 : 6 CC in Transformer plienth ( 4 x 4 x1.5 ) = 24 cum
24
-
-
Inseart the steel bar nett 12mm three layer in plienth
270
-
-
12 mm thick plaster in 1:6 mortar (16 x .5 )= 8 Sqm.
8
-
-
Cuting work of Rail by gas cutter for fixing on the top of Transformer plienth
2
-
-
Erection of 33 KV CT Structure
-
-
-
Cartage of 33 kv CT from store centre to site
1
-
-
Fabrication of 33 kv CT Structure
1
-
-
Excavation of earth for CT Structure ( 4x1x.3 ) = 1.2 cum
1.2
-
-
Erection charges of CT Structure
1
-
-
Grouting of CT Structure 1:3:6 (4x1x.6 ) = 2.4 cum
2.4
-
-
Painting work on ct structure with one coat primer and two coats of alluminium paint
1
-
-
Installtion charges of CT with control cable
1
-
-
Installation work of 33 KV VCB Structure
-
-
-
Cartage work of 33 KV VCB Loading and unloading by Hydra
1
-
-
Cartage work of 33 KV VCB Control pannel , Loading and unloading by Hydra
1
-
-
Erection work of 33 KV VCB Structure by Hydra
1
-
-
Excavation of earth for VCB Structure (4x1x.3)=1.2 cum
1.2
-
-
Grouting of VCB Structure 1:3:6 (4x1x.6 ) = 2.4 cum
2.4
-
-
Making connection VCB to control panel
1
-
-
Laying charges of control cable
100
-
-
Erection of 33 KV Bus Isolator Structure
-
-
-
Fabrication of 33 kv CT Structure
1
-
-
Excavation of earth for Isolator Structure ( 4x1x.3 ) = 1.2 cum
1.2
-
-
Grouting of Isolator Structure 1:3:6 (4x1x.6 ) = 2.4 cum
2.4
-
-
Erection work of 33 KV Isolator Structure
1
-
-
Assembling and fixing of equipment including proper setting leveling adjusting of Isolator
1
-
-
Painting work on Bus Isolator structure with one coat primer and two coats of alluminium paint
1
-
-
Erection of 33 KV Post Insulator Structure
-
-
-
Fabrication of 33 kv Post Insulator Structure
1
-
-
Excavation of earth for Post Insulator Structure ( 4x1x.3 ) = 1.2 cum
1.2
-
-
Erection charges of Post Insulator Structure
1
-
-
Grouting of Post Insulator Structure 1:3:6 (4x1x.6 ) = 2.4 cum
2.4
-
-
Painting work on Post Insulator structure with one coat primer and two coats of alluminium paint
1
-
-
Installtion charges of Post Insulator
1
-
-
Cartage of 11 kv Pannels
3
-
-
Cartage of S P - 55 Pole
3
-
-
Errection of SP - 55 Double Pole
1
-
-
Errection of SP - 55 Single Pole
1
-
-
Installetion of HT PRMC
1
-
-
Errection of 11 kv stey set
3
-
-
Errection of earthing rod
2
-
-
Laying of Dog conductor in HT Line
0.05
-
-
11 KV VCB Panel Installation work
-
-
-
Shifting work of 11 kv VCB from out side of control room to in control room trunch by menpower.
3
-
-
Grouting work of 11 kv vcb including alignment and leveling and connecting busbar with each vcb.
3
-
-
Testing work of 11 kv VCB with wiring and energigation complete work in all respect
3
-
-