Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date25 Jul 2023
Closing Date16 Aug 2023
Tender Amount₹ 9,39,406 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 30,000Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Maintenance Of Lines, Painting Of Poles, Muffing And Replacement Of Damaged Connectors
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_61254_1Bid Award Id
ViewTender No
EDD(R)/15/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
LT Clamp for PCC Pole
56
-
-
LT Shakkle Insulator
56
-
-
SMC Three Phase LT Distribution Box
38
-
-
Stay Insulator for new and replacement of existing damage Insulator
70
-
-
Stay Clamp for SP-55
14
-
-
Shear Head type insulated piecing connector suitable for jumpering for Line to line taping 120 sqmm- 120 sqmm
124
-
-
Shear Head type insulated piecing connector suitable for jumpering for Line to Line Double Pole taping 120 sqmm-25 sqmm
114
-
-
LT Wire Neutral Connector PG Clamp 120 sqmm to 25 sqmm
38
-
-
LT Wire Neutral Connector PG Clamp 120 sqmm to 120 sqmm
42
-
-
Lug Size 0 type 25 mm (for connecting cable PVCX 4x25)
152
-
-
Stay clamp for PCC Pole
26
-
-
Nut and Bolt offsizes
15
-
-
Cartage of Following Work:-
-
-
-
Cartage of Material from store centre to work site including loading & unloading (from store centre Rudrapur/Haldwani/Kashipur) upto 70 km
-
-
-
Small Material with cond
16
-
-
ST Pole SP-55
8
-
-
PCC Pole 8.5 Mtr
14
-
-
Head Load Cartage from road site to work site including loading & unloading
-
-
-
ST Pole SP-55
8
-
-
PCC Pole 8.5 Mtr
14
-
-
Small Material with cond
16
-
-
Charges for breaking of RCC top for errection of pole and stay set with help of power hammer and other T&P
62
-
-
Charges for breaking of RCC top near by pole for making space for welding with help of power hammer and other T&P
30
-
-
Excavation of Earth for pole pt size 9*6*1/6 of pole length for following pole
-
-
-
a ST Pole SP 55 (0.99x14 cum)
7.92
-
-
b SP Structure on PCC Pole
10.71
-
-
Errection of structures including exvation of earth/hard rcc road with hammer drill and back filling and grouting complete work including rebinding of conductors on insulator
-
-
-
S/P Structure on SP-55 Pole
8
-
-
S/P Structure on PCC Pole
14
-
-
Grouting of SP-55 pole in size 0.45*0.45*1/6 of pole length by CC in raio 1:4:8 and proper back filling
2.97
-
-
Charges for straightening of tilted pole after opening of lines and rebinding again
32
-
-
Charges fir repairing of STP pole by welding with help of MS Angle including providing welding set and other T&P
30
-
-
Muffing of new SP-55 pole and existing steel pole in CC Ratio 1:2:4 size 600*600 mtr including cost of material
58
-
-
Paintng of S/P Support on new SP 55 and existing SP 55/45/33
8
-
-
Charges for rabrication of MS Angle/Channel including cutting drilling as per requirement
900
-
-
Charges for replacement of LT Dist Box
38
-
-
Resagging of AB Cable. Including replacement of damaged insulated piecing connector, all complete work
8.5
-
-
Fixing of stay with excavation of earth for stay pit size 0.6x0.6x1.2 mtr complete work
40
-
-
Grouting of stay in CC 1:4:8 of size 0.6*0.6*0.3 mtr including cost of cement complete work (.108 cum each)
4.32
-
-
Charges for removing and reconnection of consumer service cable
165
-
-
Charges for fixing of stay insulator at existing stay set including opening of stay wire and rebinding nuzling and tightening again
30
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements