Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date14 May 2022
Closing Date8 Jun 2022
Tender AmountRefer Documents
Costs
EMD
₹ 30,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UPCL9_44424_1Bid Award Id
ViewTender No
01/E-TENDER/EDD(B)/2022-23Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Head load cartage of following materials from Dump store to pit site ava. Lead distance 1.5 Km Small materials
1
-
-
... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole
1
-
-
... More
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr
1
-
-
... More
Erection of Double Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23.
1
-
-
... More
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23.
1
-
-
... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23 Pole
1
-
-
... More
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.
1
-
-
... More
Fixing, tightening and nozzaling of stay with pole as per RESPO
1
-
-
... More
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 CuM
1
-
-
... More
Laying,Spreading, Stringing and Sagging of 11 KV line in Weasel Conductor Complete including Fixing of all accessories including Binding and Jumpering as per RESPO
1
-
-
... More
Electrode Earthing of SP/DP of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.
1
-
-
... More
Guarding of line with 2 No of Continious earth wire and cross wire of GI no 8 SWG upto 2 mtr distance in each including fixing of Guarding angle as per RESPO
1
-
-
... More
T-off connection complete 11 KV line
1
-
-
... More
Route clearance by cutting of tree brances/proning, loping and chopping of tree for 11 KV line
1
-
-
... More
Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete
1
-
-
... More
Motarable cartage of Material from Almora/Masi/Haldwan to road side dump store Including Loading & Un-loading both End.Dist 150 Km ST Pole SP-21
1
-
-
... More
Motarable cartage of Material from Almora/Masi/Haldwani to road side dump store Including Loading & Un-loading both End.Dist 150 Km ST Pole SP-10
1
-
-
... More
Motarable cartage of Material from Almora/Masi/Haldwani to road side dump store Including Loading & Un-loading both End.Dist 150 Km Small Material
1
-
-
... More
Head load cartage of pole & material from road site to work site distance aprox 1.5 Km SP-21
1
-
-
... More
Head load cartage of pole & material from road site to work site distance aprox 1.5 Km SP-10
1
-
-
... More
Head load cartage of pole & material from road site to work site distance aprox 1.5 Km Small Material
1
-
-
... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole
1
-
-
... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8 Mtr Sp 10 pole
1
-
-
... More
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr
1
-
-
... More
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21.
1
-
-
... More
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10.
1
-
-
... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole
1
-
-
... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole
1
-
-
... More
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.
1
-
-
... More
Fixing, tightening and nozzaling of stay with pole as per RESPO
1
-
-
... More
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3
1
-
-
... More
Errection of Earthing of pole of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.
1
-
-
... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3 phase to 4 wire
1
-
-
... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing AB Cable 1 Phase LT line Complete
1
-
-
... More
Laying, Sagging & Stringing of LT Line with ACSR Weasel conductor as Main and Neutral including laying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing AB Cable 3 Phase LT line Complete
1
-
-
... More
Route clearance by cutting of tree brances/proning, loping and chopping of tree for LT line
1
-
-
... More
Cartage of material by road transport from store Almora/Masi/Haldwani to dump store Upto distance 150Km.including loading & un-loading both end.25KVA T/F
1
-
-
... More
Cartage of material by road transport from store Almora/Masi/Haldwani to dump store Upto distance 150Km.including loading & un-loading both end. 63 KVA T/F
1
-
-
... More
Cartage of material by road transport from store Almora/Masi/Haldwani to dump store Upto distance 150 Km.including loading & un-loading both end. 100 KVA T/F
1
-
-
... More
Cartage of material by road transport from store Almora/Masi/Haldwani to dump store Upto distance 150Km.including loading & un-loading both end. Small material
1
-
-
... More
Head load cartage from Dump Store to pit site ava. Lead dist.1.5 Km 25 KVA T/F
1
-
-
... More
Head load cartage from Dump Store to pit site ava. Lead dist.1.5 Km 63 KVA T/F
1
-
-
... More
Head load cartage from Dump Store to pit site ava. Lead dist.1.5 Km 100 KVA T/F
1
-
-
... More
Head load cartage from Dump Store to pit site ava. Lead dist.1.5 Km Small material
1
-
-
... More
Mounting and fixing of TPMO in D/P with amking all connection
1
-
-
... More
Mounting and fixing of LA (Set of 3) in D/p with all respect
1
-
-
... More
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 25 KVA T/F
1
-
-
... More
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 63 KVA T/F
1
-
-
... More
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 100 KVA T/F
1
-
-
... More
Laying of LT cable of all Size
1
-
-
... More
Errection of Earthing of pole of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.
1
-
-
... More
Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements