Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Nov 2023
Closing Date20 Nov 2023
Tender Amount₹ 1,15,60,111 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,21,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replacement Of Bare Conductor L.t. Line By Aerial Bunched Cable At Different Villages In 11kv Saterakhal, Koteshwar, Bhatwarisain, Rudraprayag Town And Collectorate Feeder Under 33/11 Kv S/s Rudraprayag Under Edd Rudraprayag On Semi-turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL4_65187_1Bid Award Id
ViewTender No
20/EDC(K)/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
357
-
-
... More
1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
294
-
-
... More
Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping
650
-
-
... More
Insulated piercing connector size 70/35 sqmm to 25 sqmm for energising disribution box
1365
-
-
... More
Dead End Clamp With I Hook & MS Clamp made of MS Flat for ST Pole SP-21/10 of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer for Dead End Assembly as per UPCL specification
326
-
-
... More
Suspension Clamp With I Hook & MS Clamp made of MS Flat for ST Pole SP-21/10 of Size 50x6 sqmm duly red oxide painted with suitable size with fitted Nut and Bolts and washer for Suspension Clamp as per UPCL specification
586
-
-
... More
LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box
651
-
-
... More
LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping
326
-
-
... More
Head shink type end caps suitable for LT ABC
650
-
-
... More
Lug size O type 35 Sqr Mm
2680
-
-
... More
1x35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
3550
-
-
... More
LT AB Cable 3x70+1x50 Sqr mm
7.35
-
-
... More
LT AB Cable 3x35+1x25 Sqr mm
10.5
-
-
... More
LT AB Cable 1x35+1x25 Sqr mm
14.7
-
-
... More
LABOUR PORTION
-
-
-
... More
Cartage of ST Pole SP-21 pole from Store Centre Dehradun to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-225 kms)
-
-
-
... More
ST Pole SP-21
80
-
-
... More
ST Pole SP-10
50
-
-
... More
Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power
-
-
-
... More
ST Pole SP-21
80
-
-
... More
ST Pole SP-10
50
-
-
... More
line material from including loading and unloading
337
-
-
... More
Erection charge of ST Poles SP-21/10 Pole in long Span as per UPCL Norms
-
-
-
... More
ST Pole SP-21
80
-
-
... More
ST Pole SP-10
50
-
-
... More
Fixing and Grouting of stay Complete Work
200
-
-
... More
Straighteing of Tilted Poles SP-21/10 at works site
70
-
-
... More
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection
1168
-
-
... More
Earthing of poles with earth electrode
65
-
-
... More
Painting of poles
-
-
-
... More
ST Pole SP-21
80
-
-
... More
ST Pole SP-10
50
-
-
... More
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
-
-
-
... More
LT line 3 Phase 4 Wire
7
-
-
... More
LT line 2 Phase 3 Wire
10
-
-
... More
LT line 1 Phase 2 Wire.
14
-
-
... More
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side
86
-
-
... More
Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store
86
-
-
... More
Laying stringing and sagging of ABC cable including fixing of piering Connecto,dead & clamp with I hook, suspension clamps with I hook in all complete work.
-
-
-
... More
LT AB Cable 3x70+1x50 Sqr Mm
7.35
-
-
... More
LT AB Cable 3x35+1x25 Sqr Mm
10.5
-
-
... More
LT AB Cable 1x35+1x25 Sqr Mm
14.7
-
-
... More
Laying and fixing of 1x35 sq mm XLPE insulated Al. Cable for energising the distribution boxes
3550
-
-
... More
Installation of LT Distribution Box complete work
651
-
-
... More
Lopping chopping of tree Branches
15
-
-
... More
Grouting and Muffing of Poles
130
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements