Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Civil And Construction
Electrical and Electronics
Eprocure
Opening Date16 Dec 2024
Closing Soon26 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,70,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Installation Of Distribution Transformers And Construction
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_78802_1Tender No
36/EDCT/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
STAY CLAMP FOR SP-23 WITH NUT &
BOLT
14
-
-
... More
STAY CLAMP FOR SP-10 WITH NUT & BOLT
14
-
-
... More
EARTH WIRE CLAMP FOR SP-23 WITH
N/B
15
-
-
... More
DEAD END CLAMPS WITH I HOOK AND
N/B INS
60
-
-
... More
PP & CLAMP WITH N&B ST POLE SP-23
48
-
-
... More
Susp. Clamp With I Hook (Ins.),Clamp,N&B
269
-
-
... More
STAY INSULATOR
42
-
-
... More
BRACING CLAMP TOP FOR SP-23 WITH
N/B
18
-
-
... More
BRACING CLAMP BOTTOM FOR SP-23
WITH N/B
18
-
-
... More
PVC Wire 6sqmm
23
-
-
... More
Piercing Connector 70 Sq.mm-70Sq.mm
120
-
-
... More
Piercing Connector 70 Sq.mm-35Sq.mm
90
-
-
... More
LT XLPE Cable 1x25 sqmm
390
-
-
... More
LT XLPE AB CABLE 3X70+1X50 SQ.MM.
5000
-
-
... More
LT AB Cable 3x35+1x25 sqmm
10130
-
-
... More
LT XLPE AB CABLE 1CX16+25 SQ.MM.
7600
-
-
... More
LT AB CABLE 3CX50+1X35 SQ.MM
10800
-
-
... More
AL TO AL CONNECTOR AB CABLE 50-50
SQ.MM.
120
-
-
... More
LT DISTRIBUTION BOX 1 PHASE
180
-
-
... More
LT Fuse Set With Fuse Wire
8
-
-
... More
Aluminium lug 25 sq. mm
260
-
-
... More
CONNECTOR FOR SERVICE CONNECTION I PH
150
-
-
... More
LABOUR(SERVICES)
-
-
-
... More
FABRICATION OF STEEL
730
-
-
... More
EXCAVATION OF PIT FOR STAY SET
18.14
-
-
... More
ERECTION OF LT STAY SET
42
-
-
... More
GROUTING OF STAY SET
4.54
-
-
... More
EXCAVATION OF PIT FOR POLE
49.47
-
-
... More
ERECTION OF SINGLE SP-10 POLE
18
-
-
... More
ERECTION OF SINGLE SP-21 POLE
24
-
-
... More
ERECTION OF SINGLE SP-23 POLE
6
-
-
... More
ERECTION OF SP-23 DOUBLE POLE
9
-
-
... More
GROUTING OF POLE
12.33
-
-
... More
DISMANTLING OF SP-10 SINGLE POLE
9
-
-
... More
DISMANTLING OF SP-21/SP-23 SINGLE
POLE
15
-
-
... More
DISMANTLING OF LT LINE 1 P 2
W(WEASEL)
21.3
-
-
... More
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
2.45
-
-
... More
INST. OF 63 KVA DTR ON POLE
STRUCTURE
2
-
-
... More
INST. OF 25 KVA DTR ON POLE
STRUCTURE
1
-
-
... More
FIXING OF FUSE SET
3
-
-
... More
FIXING OF LT FUSE SET
8
-
-
... More
LAYING OF WEASEL CONDUCTOR IN
HT LINE
1.5
-
-
... More
LOPPING & CHOPPINGOF TREE BRANCHES
27.9
-
-
... More
CARTAGE SP-10 POLE, 100-150KM
9
-
-
... More
CARTAGE SP-21/23 POLE, 100-150KM
33
-
-
... More
CARTAGE OF PETTY MATERIAL,100-150KM
450
-
-
... More
CARTAGE OF 16/25 KVA DTR, 71-100 KM
1
-
-
... More
CARTAGE OF 63 KVA DTR, 100-150KM
2
-
-
... More
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
9
-
-
... More
HEADLOAD CARTAGE SP-21/23
POLE(0-1 KM)
33
-
-
... More
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
450
-
-
... More
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
1
-
-
... More
HEADLOAD CARTAGE OF 63 KVA
DTR(0-1 KM)
2
-
-
... More
DISCONNECTION & RECONNECTION
OF CONsumer
400
-
-
... More
LAYING OF LT AB CABLE 3X70+1X50 SQMM
5000
-
-
... More
LAYING OF LT AB CABLE 3X35+1X25
SQMM
10130
-
-
... More
Installation of LT DB 1 Ph for LT AB
180
-
-
... More
Laying of AB Cable 1x16+25 mm
7.6
-
-
... More
BACK CARTAGE OF PETTY
MATERIAL,100-150KM
30.8
-
-
... More
Laying & Fixing LT XLPE Cable
390
-
-
... More
Chemical Earthing of T/F
16
-
-
... More
BACK HEAD LOAD CART. OF PETTY
MAT. 0-1KM
30.8
-
-
... More
LAYING OF LT AB CABLE 3CX50+1X35
10800
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%