Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date28 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 1,36,91,000
Costs
EMD
₹ 2,74,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replacement Of Bare Conductor Lt Line By Aerial Bunch Cable On 11 Kv Rathuadhab Feeder At Various Villages Under Edd Nainidanda On Semi Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_75029_1Bid Award Id
ViewTender No
E-Tender no.27/EDC(s)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
3 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
26
-
-
1 Phase LT Distribution Box With inbuilt panel lock, Al Bus Bar RYB 25x6mm,Al Busbar N 40x6mm
309
-
-
Insulated piercing connector size 70-70/35-35 sqmm for line to line tapping
1482
-
-
Insulated piercing connector size 70/35 sqmm to 16 sqmm for energising disribution box
387
-
-
Dead End Clamp With I Hook.(Insulated)
390
-
-
Suspension Clamp With I Hook.(Insulated)
884
-
-
LT Wire Neutral Connector PG Clamp 50/25-25sqmm single bolt as per UPCL specificationfor energising distribution box
335
-
-
LT Wire Neutral Connector PG Clamp 50-50/25-25sqmm single bolt as per UPCL specification for line to line tapping
950
-
-
Head shink type end caps suitable for LT ABC
300
-
-
Lug size 16 Sqr Mm
618
-
-
Lug size 50 Sqr Mm
103
-
-
1x16 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1234
-
-
1x50 sq mm XLPE insulated Al. Cable for energising the distribution boxes
208
-
-
LT AB Cable 3x35+1x25 Sqr mm
49.55
-
-
LT AB Cable 1x35+1x25 Sqr mm
6.5
-
-
Holding clamp for J-hook
1274
-
-
Mid span Joint
215
-
-
Various type Nut and Bolt.
350
-
-
Labour
-
-
-
Cartage of ST Pole SP-21 pole from Store Centre Kotdwar/Risikesh/ Dehradun to Work Site with Stacking site in 1Km Distance Including Loading & unloading (distance 5kms-225 kms)
-
-
-
ST Pole SP-21
10
-
-
ST Pole SP-10
23
-
-
Head Load Cartage of ST Pole SP-21 From Road Site to work site distance approx 3.0 km By Man Power
-
-
-
ST Pole SP-21
10
-
-
ST Pole SP-10
23
-
-
Cartage of small Line material from Store Centre Dehradun /Kotdwar to road Side Including loading & unloading (distance 5kms-2225 kms)
20.89
-
-
Head Load Cartage of Road Site to work site distance approx 3.0 km By Man Power
-
-
-
LT AB Cable 3x35+1x25 Sqr Mm
49.55
-
-
LT AB Cable 1x35+1x25 Sqr Mm
6.5
-
-
Erection charge of ST Pole SP-21/10 pole in long span as per UPCL norms
-
-
-
ST Pole SP-21
10
-
-
ST Pole SP-10
23
-
-
Fixing and Grouting of stay Complete Work
33
-
-
Removing & Reconnection of Single phase/Three phase LT Consumer Service Connection
728
-
-
Painting of poles
-
-
-
ST Pole SP-21
330
-
-
ST Pole SP-10
260
-
-
Dismantling of Old ACSR weasel Conductor from existing LT line including Re Rolling cartage from worksite to JE Store after Head Load cartage from different site.
-
-
-
LT line 3 Phase 4 Wire
4
-
-
LT line 2 Phase 3 Wire
9.5
-
-
LT line 1 Phase 2 Wire.
42.55
-
-
Head load cartage of dismantled old ACSR Weasel Conductor from work site to road side
117.86
-
-
Back cartage of dismantled old ACSR Weasel Conductor from JE Store to Rishikesh store
117.86
-
-
Laying stringing and sagging of AB cable including fixing of piercing Connector, dead end clamp with I hook, suspension clamps in all complete work.
-
-
-
LT AB Cable 3x35+1x25 Sqr Mm
49.55
-
-
LT AB Cable 1x35+1x25 Sqr Mm
6.5
-
-
Laying and fixing of 1x16/50 sq mm XLPE insulated Al. Cable for energising the distribution boxes
1442
-
-
Installation of LT Distribution Box complete work Three Phase
26
-
-
Installation of LT Distribution Box complete work One Phase
309
-
-
Lopping chopping of tree Branches
56.05
-
-
Fixing of Holding clamp and stay clamp
1307
-
-
Fixing of Nuts and Bolts
350
-
-
Straightening of tilted pole
56
-
-
Fixing of Aluminium Lugs
721
-
-
Fixing of Aluminium Lugs
-
-
-