Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Telecommunication Services
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Sep 2024
Closing Date26 Sep 2024
Tender Amount₹ 2,47,00,000
Costs
EMD
₹ 4,94,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Summary
Replace Of Bare Conductor Into Ab Cable At Diff. Area In Khatyari Section Under 33/11 Kv S/s Khatyari Under Edd, Almora On Turnkey Basis
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL9_74952_1Bid Award Id
ViewTender No
EDC(R)-11/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stay Wire GI 7/3.15 mm 7/10 SWG
499
-
-
LT XLPE Cable 1x120 SQ. mm
3224
-
-
LT XLPE AB Cable 3x120+1x95+1x16 mm2
20368
-
-
LT XLPE Cable 1x70 SQ. mm
5500
-
-
LT XLPE AB Cable 3x95+1x70 Sq mm
17356
-
-
NON-CENTRALIZED MATERIAL (SUPPLY)
-
-
-
LT Bare N. Connector PG Clamp L-L 120-120 mm2
450
-
-
Nut & Bolts
500
-
-
Stay Clamp for SP-21 with N&B
100
-
-
Suspension Clamp with Eye Hook
1053
-
-
Piercing Clamp for 120 Sq.mm-120 Sq.mm
1298
-
-
Dead end Clamp with I Hook
411
-
-
Piercing Connector for 95 Sq.mm-120 Sq.mm
1995
-
-
LT AB cable 3x50+1x35+1x16 Sq.mm
4590
-
-
LT Distribution Box 3 Phase
1275
-
-
Al Lug Long Barrel 120 Sq.MM
420
-
-
Al Lug Long Barrel 95 Sq.MM
125
-
-
MS Half Clamp for LT Distribution Box
1275
-
-
LABOUR PART
-
-
-
Erection of Earthing Rod
110
-
-
Excavation of Pit for stay set
43
-
-
Grouting of Stay set
10.8
-
-
Headload Cartage of Material (0-1 Km)
854
-
-
Installation of LT Dist Box (1P & 3P)
1275
-
-
Laying of LT XLPE ABC 3x120+1x95+1x16 Sq. mm
19775
-
-
Laying of LT XLPE ABC 3x95+1x70 Sq. mm
16851
-
-
Laying & Fixing LT XLPE Cable
8724
-
-
Fixing of Piercing Connector L2L 120-120 Sqmm
1298
-
-
Erection of Dead end Clamp
411
-
-
Erection of Suspension clamp
1053
-
-
Fixing of Piercing Connector 120-95 Sqmm
1995
-
-
Fixing of PG Clamp 120-120 Sqmm
450
-
-
Laying of LT AB Cable 3x50+1x35+1x16 Sq. mm
4457
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements