Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Eprocure
Opening Date20 Aug 2021
Closing Date24 Sep 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Head load cartage of small material from Dump store to pit site ava. Lead distance 3.5 Km

30

-

650

... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole

1.53

-

250

... More
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr

0.86

-

250

... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 23 Pole

0.38

-

4800

... More
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.

2

-

564

... More
Fixing, tightening and nozzaling of stay with pole as per RESPO

2

-

500

... More
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 CuM

0.22

-

4800

... More
Laying, Spreading, Stringing and Sagging of 11 KV line in Weasel Conductor Complete including Fixing of all accessories including Binding and Jumpering as per RESPO (1ph to 3 Ph)

6.6

-

15500

... More
Electrode Earthing of SP/DP of GI no 6 SWG with Pole & Earth Rod and nuts & Bolts.etc Complete as per specification.

1

-

600

... More
Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete

30

-

20

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 55 Km ST Pole SP-21

22

-

580

... More
Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 55 Km Small Material

32

-

450

... More
Head load cartage of pole & material from road site to work site distance aprox 3.5 Km SP-21

22

-

750

... More
Head load cartage of pole & small material from road site to work site distance aprox 3.5 Km

32

-

650

... More
Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole

16.83

-

250

... More
Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr

9.5

-

250

... More
Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21.

22

-

550

... More
Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole

4.21

-

4800

... More
Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc.

22

-

564

... More
Fixing, tightening and nozzaling of stay with pole as per RESPO

22

-

450

... More
Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3

2.38

-

4800

... More
Laying, Sagging & Stringing of LT Line AB Cable 3 Phase LT line Complete

8.19

-

15500

... More
Cartage of material by road transport from store Almora to dump store Upto distance 55 Km. including loading & un-loading both end. 25 KVA T/F

9

-

3900

... More
Cartage of material by road transport from store Almora to dump store Upto distance 55 Km. including loading & un-loading both end. Small material

21

-

450

... More
Head load cartage from Dump Store to pit site ava. Lead dist. 3.5 Km 25 KVA T/F

9

-

4300

... More
Head load cartage of small material from Dump Store to pit site ava. Lead dist. 3.5 Km

21

-

650

... More
Dismentling of T/F from DP including opening of connections, circuits & earthing strip etc.

9

-

1500

... More
Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 25 KVA T/F

9

-

2000

... More
Laying of LT cable of all Size

225

-

25

... More
Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete

990

-

20

... More
Earthing of T/F with MS earth Rod by Hammering of Rod to proper depth and connectioning of earth electrode with GI wire No 6 3 No of earth rod for delta earthing for neutral, 1 no for T/F body and 1 No Structure earthing

45

-

600

... More
Mounting and fixing of Fuse set on Double Pole structure including making of connection complete work.

9

-

3000

... More
Mounting and fixing of Lightening arrester set (3 No) on Double Pole structure including making of connection complete work.

9

-

2200

... More
Back Head load cartage of 16 KVA T/F from site to Dump Store ava. Lead dist. 3.7 Km

9

-

3200

... More
Cartage of 16 KVA Transformer by road transport from Site to Almora store Upto distance 55 Km.including loading & un-loading both end.

9

-

3900



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.