Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Eprocure
Opening Date5 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 1,84,23,000 
Notes
Download

Costs

Summary

Tn 38/2024-25/edc(ch) Replacement Of Acsr Weasel Conductor By Lt Arial Bunched Cable Under Shaktifarm No. 02

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Suspension Clamps I Hook with nut & bolts as per drawing and UPCL Specification.

1450

-

-

... More
Supply of PCC Pole Clamps with fitted nuts & bolts as per drawing and UPCL Specification.

900

-

-

... More
Supply of Shear head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 70sq.mm to 70sq.mm jumpering for Line to line DB taping ( Tyco/ RPG/3M. make) as per UPCL Specification.

400

-

-

... More
Supply of Shear head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 70sq.mm to 35sq.mm jumpering for Line to line DB taping ( Tyco/ RPG/3M. make)as per UPCL Specification.

700

-

-

... More
Supply of Shear head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 70sq.mm to16 sq.mm jumpering for Line to line DB taping ( Tyco/ RPG/3M. make) as per UPCL Specification.

900

-

-

... More
Supply L.T. bare Neutral Connector PG clamp made of Al 50x50 sq.mm. double bolt for line to line jumpering as per UPCL specifciation.

1500

-

-

... More
Supply L.T. bare Neutral Connector PG clamp made of Al 50x16 sq.mm. double bolt for line to line jumpering as per UPCL specifciation.

700

-

-

... More
Supply fo mid span insulated jointing sleeves suitable for LT ABC as per specifiction of UPCL

500

-

-

... More
Supply of head shrink type of cap sutaible for suitable for LT ABC as per specifiction of UPCL

500

-

-

... More
Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex make or other ISI mark reputed company ) with Panel Lock with key) ( As per drawing attached )

600

-

-

... More
Supply of M.S. Clamp made of M.S. flate for PCC Pole 8.5 Mtr. Long and other size pole, size 35x5mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead & Clamps assemble.painted by primers.

1500

-

-

... More
Supply of 1x25 Sqmm XLPE including AI cable for energiging the distribution box.

5500

-

-

... More
Supply of MS Stay Clamp for PCC Pole 8.5 Mtr. long, made of M.S. flate size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm) for suspension clamps assemble without cracks & burrs Painted by primers.

25

-

-

... More
Supply of special type holding for J-I hooks with nut & bolts assemble without cracks & burrs Painted by primers, as per specification of UPCL

330

-

-

... More
Supply of 1x25 Sqmm all Lugs, as per specification of UPCL

2800

-

-

... More
Supply of L.T. Arial Bunch Cable size 3x95+1X50 SQ.MM. ISI Mark.

2000

-

-

... More
Supply of L.T. Arial Bunch Cable size 3x70+1X50 SQ.MM. ISI Mark.

20000

-

-

... More
Annexure-B (Work)

-

-

-

... More
Charges for Dismentaling of Old ACAR Conductor L.T. Line A-3 Phase 4 Wire including re-rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store.

0.5

-

-

... More
Charges for Dismentaling of Old ACAR Conductor L.T. Line B-2 Phase 3 Wire including re-rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store.

1

-

-

... More
Charges for Dismentaling of Old ACAR Conductor L.T. Line C-1 Phase 2 Wire including re-rolling back its conductor, wire, clamp insulator etc. including stacking & transportation of material to the UPCL store

20.52

-

-

... More
Charges for Carrying the material (PCC Pole 8.5 Mtr Long) from dump store to site of work including Loading / Unloading distance 01-02 KM.

170

-

-

... More
Charge for Carrying the material (cable and De- Centrelisz Other materials ) from dump store to site of work including Loading / Unloading distance 51-70 KM.

250

-

-

... More
Charges of Head Load Cartage (PCC Pole 8.5 Mtr Long) from Road site To work Site as per RESP Specification of Engineer incharge distance 01-03 KM

170

-

-

... More
Charge of Head Load (Cable and other materials) from Road site To work Site as per RESP Specification of Engineer incharge distance 01-02 KM

250

-

-

... More
Alligment of Trilited pole at site before stringing AB cable as per direction of Engineer Incharge

75

-

-

... More
Charges of Erection of P.C.C. Pole8.5 Mtr. Long ( 180 kg. W/L )for reducing span of LT, ABC line including digging of pits 0.6x0.9x2.15 Mtr.& with fixing of all accessories & back filling with soil & boulder earthing complete work as per RESPO specification & as per direction of Engineer in charge.

170

-

-

... More
Charges of Erection of stay set 16x1800mm. pit size 0.6x0.9x1.2 Mtr. as per specifications including 7/16SWG stay wire, binding, nozzling of stay with bcking filling of pit with CC 1:4:8 in bottom to pit in size 0.60 complete work stay set will be provided by UPCL.as per RESPO specification & direction of Engineer in charge

25

-

-

... More
Charges of Laying, Stringing, sagging of AB Cable3x95+1x50Sqmm /AB 3x70+1x50 Sqmm including fixing of Insulated, Piercing Connector in all complete work. as per direction of Engineer in charge.

22000

-

-

... More
Charges of Fixing of Dead end clamp with I Hook in all complete work as per drawing, upcl specification and direction of Engineer-In- Charge.

950

-

-

... More
Charges of Fixing of Suspension clamp with I Hook with nut & bolts in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

1450

-

-

... More
Charges of Fixing of shear head type insulation piercing connectors jumpering for line to line/ tapping 70-70sqmm in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

400

-

-

... More
Charges of Fixing of shear head type insulation piercing connectors jumpering for line to line/ tapping 70-35sqmm in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

700

-

-

... More
Eraction of M.S Earthing rod 20-2500 mm for earthing of supports as per RESPO drawing no RES-12 including driving earth rod 2.5mtr Deep Below ground level connected to support with G.I earthing with Nut & bolts work complete.

150

-

-

... More
Charges of Fixing of LT bare neutral connectors PG clamps made of A.I. 50 Sqmm to 50 Sqmm double bolt (for line to line jumpering) in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

1500

-

-

... More
Charges of Fixing of LT bare neutral connectors PG clamps made of A.I. 50 Sqmm to 25Sqmm double bolt (for line to line jumpering) in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

700

-

-

... More
Charges of Erection of mid span insulated jointing sleeves suitable for LT AB cable in all complete work as per UPCL specification & direction of Engineer-In-Charge.

500

-

-

... More
Charges of Fixing of heal shrink type and caps suitable for LT AB cable in all complete work as per direction of Engineer-In-Charge.

500

-

-

... More
Charges of Installation & Fixing of SMC three phase L.T.Distribution Box with inbuilt pannel lock, AI bus bar RYB 25x6 mm AI bus bar size including all complete work as per drawing, upcl specification and direction of Engineer-In- Charge.

600

-

-

... More
Charges of Fixing of all type MS clamps, LT clamps for PCC pole with nut & bolts without cracks & burrs painted by primer including all complete work as per direction of Engineer in charge.

2400

-

-

... More
Charges of Fixing of 1x25 sqmm XLPE including Al. cabl including all complete work as per direction of Engineer in charge.

5500

-

-

... More
Charges of Fixing of 35 sqmm all lugs as per direction of Engineer in charge

2800

-

-

... More
Charges of Removal & Re connection of exising cable of single phase and three phase LT consumer service connection as per direction of Engineer in charge.

1950

-

-

... More
Charges of Fixing of shear head type insulation piercing connectors jumpering for line to line/ tapping 120-120 sqmm in all complete work as per drawing, upcl specification and direction of Engineer-In-Charge.

900

-

-

... More
Charges of Fixing M.S. Clamp made of M.S. flate for PCC Pole 8.5 Mtr. Long and other size pole, size 50x6mm. with 2 Nos. Nut & Bolts ( size 65x16mm)without cracks & burrs for Dead & Clamps assemble.painted by primers.

1200

-

-

... More
Charges of Fixing & Eraction of J-Hook

330

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.