Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date9 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SP-21/23

1

430

430

... More
SP-33

1

450

450

... More
SP-55

1

500

500

... More
SP-72

1

750

750

... More
PCC Poles

1

480

480

... More
Other Small material.

1

360

360

... More
Cartage of the following capacity transformers from store center to construction site with loading and unloading at both points. (Loading, unloading plus carriage of T/F) (0-20 Km)

-

-

-

... More
25 KVA

1

2400

2400

... More
63 KVA

1

2640

2640

... More
100 KVA

1

2640

2640

... More
Head load cartage of following Poles from road to site (Rates are per pole / KM Upto 0 to 1 Km.)

-

-

-

... More
SP-10

1

265

265

... More
SP-21/23

1

375

375

... More
SP-33

1

430

430

... More
SP-55

1

570

570

... More
SP-72

1

720

720

... More
PCC Poles

1

540

540

... More
Small material.

1

300

300

... More
Head load cartage/ manual shifting / lifting with crane/hydra of the following transformers along with loading/Unloading at both points (the rates are per transformer/Km).

-

-

-

... More
25 KVA Transformer 11/0.4KV

1

1200

1200

... More
63 KVA Transformer 11/0.4KV

1

1450

1450

... More
100 KVA Transformer 11/0.4KV

1

1680

1680

... More
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work

1

250

250

... More
Erection of following Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.

-

-

-

... More
SP-10

1

550

550

... More
SP-21

1

600

600

... More
PCC Pole

1

1250

1250

... More
SP-23

1

600

600

... More
SP-33

1

1000

1000

... More
SP-55

1

1250

1250

... More
SP-72

1

1500

1500

... More
Erection of following Double pole support in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESSPO construction Manual (labour charges).

-

-

-

... More
PCC Pole

1

2300

2300

... More
SP-23

1

1380

1380

... More
SP-33

1

1850

1850

... More
SP-55

1

2400

2400

... More
SP-72

1

2800

2800

... More
Erection of following Four pole support in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESSPO construction Manual (labour charges).

-

-

-

... More
SP-23

1

3000

3000

... More
SP-33 (11KV/33KV)

1

3680

3680

... More
SP-55 (11KV/33KV)

1

4750

4750

... More
SP-72 (11KV/33KV)

1

5750

5750

... More
Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.

1

4720

4720

... More
Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.

1

550

550

... More
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.

1

22

22

... More
Erection of following special type Bracket in proper level and alignment along with fixing of all accessories, like chanel, angle and clamps as per RESSPO construction manual.

-

-

-

... More
Fixing of D-type bracket in LT line

1

500

500

... More
Fixing of triangular type bracket in 11 KV line

1

600

600

... More
Fixing of triangular type bracket in 33 KV line

1

700

700

... More
Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work

1

225

225

... More
Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing / RESSPO manual.

-

-

-

... More
LT stay

1

375

375

... More
11 KV line

1

460

460

... More
33 KV line

1

460

460

... More
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.

1

4720

4720

... More
Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the helpof G.I. wire as per construction manual.

1

390

390

... More
Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.

-

-

-

... More
Weasel

1

14400

14400

... More
ACSR Rabbit

1

16100

16100

... More
Raccoon

1

18400

18400

... More
Dog

1

26500

26500

... More
Panther

1

46000

46000

... More
AAAC 70 Sq mm

1

98000

98000

... More
AAAC 50 Sq mm

1

95000

95000

... More
Laying, Spreading, Stringing and sagging of L.T. Lines of the following wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO Specn.

-

-

-

... More
ACSR Weasel Conductor

-

-

-

... More
3 phase 5 wire length

1

18000

18000

... More
3 phase 4 wire length

1

14400

14400

... More
2 phase 3 wire length

1

10700

10700

... More
1 phase 2 wire length

1

7150

7150

... More
ACSR Rabbit Conductor

-

-

-

... More
3 phase 5 wire length

1

20200

20200

... More
3 phase 4 wire length

1

16100

16100

... More
2 phase 3 wire length

1

11000

11000

... More
1 phase 2 wire length

1

8100

8100

... More
ACSR Raccoon Conductor

-

-

-

... More
3 phase 5 wire length

1

23000

23000

... More
3 phase 4 wire length

1

18400

18400

... More
2 phase 3 wire length

1

13800

13800

... More
1 phase 2 wire length

1

9200

9200

... More
ACSR Dog Conductor

-

-

-

... More
3 phase 5 wire length

1

33000

33000

... More
3 phase 4 wire length

1

26500

26500

... More
2 phase 3 wire length

1

19800

19800

... More
1 phase 2 wire length

1

13200

13200

... More
Laying, Spreading, Stringing and sagging of LT XLPE ABC

-

-

-

... More
3X120+1X95+1X16 SQ. mm

1

45

45

... More
3X95+1X70 Sq.mm+1x16 sq mm

1

45

45

... More
3X25+25 Sq.mm

1

30

30

... More
3X16+25 Sq.mm

1

30

30

... More
Making Special type separate earthing for neutral /body of Power transformer by digging 3x4x12 feet deep pit at corner of Swithchyard with duly provided 1 No. coal Iron earth plates of size 18''x18''x½'' jointing them with 6'' long bolt duly coverod with layer of softcoal 60 Kg. and salt 20 Kg. (Total 80 Kg.) connecting them with the main erath mat, The earth plate shall be connected with 35x6 mm GI Strip and GI strip shall be laid upto the neutral and T/F body separately (Including supply of steel).

1

13000

13000

... More
Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.

1

11000

11000

... More
Guarding of Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESSPO manual. L.T./11KV /33KV

-

-

-

... More
L.T./11KV Line.

1

2100

2100

... More
33KV Line.

1

3000

3000

... More
Construction of Transformer Plinth with size 2x2x1.1 meter above ground level and 0.6 meter below ground level including the cost of material such as cement, brick, ballast, sand etc. complete work as RESSPO norms.

-

-

-

... More
Excavation of earth of size 2.1x2.1x1.2 meter

1

225

225

... More
Cement concreting work in ratio 1:4:8

1

4900

4900

... More
Brick work in 1:4 ratio

1

6500

6500

... More
RR massonary work in 1:6 ratio

1

4800

4800

... More
RCC Work of 1:2:4 ratio 15 cm thickness

1

6500

6500

... More
Cement Plaster on side walls in 1:4 ratio

1

510

510

... More
Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material)

1

30

30

... More
Laying and erection of L.T. PVC single lead Cable including crimping of lugs of size 1x240, 400, 630 Sq.mm etc. (Including all cost of material)

1

45

45

... More
Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S angle iron 35x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the height of 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material)

1

4200

4200

... More
Mounting & Fixing of TPMO on double pole structures including making of connections complete work

1

2550

2550

... More
Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work

1

2550

2550

... More
Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.I. strip size 35x6 mm to earth point complete work (excluding cost of G.I.Strip)

1

2100

2100

... More
INSTALLATION OF MCCB WITH BOX AT DTRS

1

5500

5500

... More
Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level.

-

-

-

... More
ST Pole SP-55

1

1260

1260

... More
ST Pole SP-33

1

1080

1080

... More
ST Pole SP-23/21

1

900

900

... More
ST Pole SP-10

1

720

720

... More
ST Pole SP-72

1

1440

1440

... More
Jointing and Fixing of cable jointing Kits indoor /outdoor cable boxes.

-

-

-

... More
11 KV XLPE heat shrinkable

1

3000

3000

... More
33 KV XLPE heat shrinkable

1

3800

3800

... More
Straight through 11 KV XLPE

1

4800

4800

... More
Straight through 33 KV XLPE

1

8400

8400

... More
Fixing & Installation of LT Fuse set

1

1200

1200

... More
Installation / mounting of new Tranformer on plinth pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.

-

-

-

... More
On Double Pole

-

-

-

... More
100 KVA

1

2550

2550

... More
63 KVA

1

2150

2150

... More
25 KVA

1

1600

1600

... More
16KVA

1

1400

1400

... More
Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.

1

850

850

... More
T-off Connection Complete

-

-

-

... More
11 KV line

1

960

960

... More
33 KV Line

1

1250

1250

... More
Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11''x7'' size (Including cost of all material)

1

500

500

... More
Laying of LT service Cable From Pole to consumer end meter along with supporting GI wire

1

48

48

... More
Digging of trench of size 0.60x0.15 x 0.9 mtr. and laying of underground LT cable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone blast

1

230

230

... More
Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with ramming. & repairing of road including cost of cement sand and stone blast

1

380

380

... More
Re- alignement of TPMO on existing Double pole with digging of pit and fixing of TPMO on the double pole with smooth operating including making of gung and jumper with binding kit.

1

700

700

... More
Making of section pole for existing LT/HT/33KV line complete in all respect.

1

2900

2900

... More
Installation of 33/11 KV Metering cubical in the Metering room with grouting and making all connection

1

9600

9600

... More
Fixing of GI pipe.

1

240

240

... More
Fixing of RCC cable route marker Including cost material

1

1800

1800

... More
Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC.

1

2900

2900

... More
Construction of Metering room for Metering Cubical at S/s end Including cost of building / material and it also include the cost of gate etc. Of 10 feet height

1

1850

1850

... More
Laying of LT Cable in Half circle Hume pipe of Dia 150 mm including cost of hume pipe in depth 0.9 meter

1

650

650

... More
Laying of 11 KV Cable in Half circle Hume pipe of Dia 150 mm including cost of hume pipe in depth 1.5 meter

1

700

700

... More
Laying of 33 KV Cable in Half circle Hume pipe of Dia 150 mm including cost of hume pipe in depth 1.5 meter

1

750

750

... More
Laying of 11KV Cable in 1.5 mtr depth with suitable trencheless technology including laying in trench with providing & fixing of HDPE pipe PE 80 PN 6 & having dia 160 mm conferming to IS 4984/1995 & having thickness 9.1 to 10.3mm.

1

2500

2500

... More
Laying of 33 KV Cable in 1.5 mtr depth with suitable trencheless technology including laying in trench with providing & fixing of HDPE pipe PE 80 PN6 & having dia 160 conferming to IS 4984/1995 & having thickness 9.1 to 10.3mm.

1

2950

2950

... More
LAYING OF O/H 11KV XLPE CABLE

-

-

-

... More
3Cx120 SQMM

1

300

300

... More
3Cx70 SQMM

1

260

260

... More
3Cx50 SQMM

1

260

260

... More
3Cx35 SQMM

1

260

260

... More
Release of Single phase connection:Complete erection of LT PVC Cable 2X4sq.mm/2x6sq.mm & installation of single phase electronic meter 10-60 Amp on pole or outside the permises of applicant

1

300

300

... More
Release of Three phase connection:Complete erection of LT PVC Cable4x6 / 4X10sq.mm & installation of Three phase electronic meter 10-60 Amp on pole or outside the permises of applicant with in 24 hours after payment of applicant.

1

420

420

... More
Replacement of 11 KV CT inside the 11 KV metering cubicle including cleaning of metering cubicle

1

1200

1200

... More
Replacement of 33 KV CT inside the 33 KV metering cubicle including cleaning of metering cubicle

1

1400

1400

... More
De-Centralized Material

-

-

-

... More
PP Clamp With Nuts & Bolts

-

-

-

... More
ST Pole SP-72

1

500

500

... More
ST Pole SP-55

1

350

350

... More
ST Pole SP-33

1

330

330

... More
ST Pole SP-23

1

300

300

... More
PCC Pole

1

280

280

... More
Holding Clamp With Nuts & Bolts

-

-

-

... More
ST Pole SP-72

1

290

290

... More
ST Pole SP-55

1

290

290

... More
ST Pole SP-33

1

260

260

... More
ST Pole SP-23

1

240

240

... More
PCC Pole

1

260

260

... More
Stay Clamp With Nuts & Bolts

-

-

-

... More
ST Pole SP-72

1

280

280

... More
ST Pole SP-55

1

280

280

... More
ST Pole SP-33

1

250

250

... More
ST Pole SP-23

1

240

240

... More
ST Pole SP-23

1

240

240

... More
PCC Pole

1

260

260

... More
Earth Clamp With Nuts & Bolts

-

-

-

... More
ST Pole SP-72

1

290

290

... More
ST Pole SP-55

1

290

290

... More
ST Pole SP-33

1

260

260

... More
ST Pole SP-23

1

240

240

... More
ST Pole SP-23

1

240

240

... More
PCC Pole

1

260

260

... More
LT Clamp With Nuts & Bolts

-

-

-

... More
ST Pole SP-72

1

290

290

... More
ST Pole SP-55

1

290

290

... More
ST Pole SP-33

1

250

250

... More
ST Pole SP-23

1

240

240

... More
ST Pole SP-23

1

240

240

... More
PCC Pole

1

250

250

... More
Supply of Alumminium Lug

-

-

-

... More
35 sq mm

1

85

85

... More
50 sq mm

1

85

85

... More
70 sq mm

1

85

85

... More
95 sq mm

1

95

95

... More
120 sq mm

1

95

95

... More
150 sq mm

1

140

140

... More
185 sq mm

1

160

160

... More
240 sq mm

1

230

230

... More
400 sq mm

1

230

230

... More
630 sq mm

1

280

280

... More
Supply of Piercing Connector

-

-

-

... More
120-120 sq mm

1

160

160

... More
120-95 sq mm

1

160

160

... More
120-35 sq mm

1

140

140

... More
95-95 sq mm

1

140

140

... More
95-35 sq mm

1

125

125

... More
25-35 sq mm

1

100

100

... More
25-25 sq mm

1

100

100

... More
16-16 sq mm

1

100

100

... More
Supply of 1x35 sq mm Single core LT XLPE Cable for Connecting distribution box

1

150

150

... More
Supply of Suitable lug for energizing LT distribution Box 1x35 sq mm

1

110

110

... More
Supply of J-hook with Clamps suitable for LT XLPE AB CABLE

1

240

240

... More
Supply of Dead End Clamp suitable for LT XLPE AB Cable

1

190

190

... More
Supply of stay Insulator 90x65 mm with Nuts & Bolt

1

70

70

... More
Supply of Shackle insulator 100x115 mm with Nuts&bolt

1

95

95

... More
Supply three Phase Distribution box with Clamp Nut&bolt

1

3500

3500

... More
Supply of LT MCCB Microprocessor 200 amp. 4 Pole with Pannel

1

35000

35000

... More
11 KV Class Polymeric Ball and Socket Polymeric tension insulator with Hardware for 11KV AAAC Conductor

1

740

740

... More
11 KV Class tension hardware(single String)

1

1350

1350

... More
IPC for 11KV MVCC

1

1350

1350

... More
Insulated Cable ties 11KV MVCC

1

450

450

... More
GST Extra As Per Applicable.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.