Uttarakhand Power Corporation Limited Tender

View complete overview of Uttarakhand UPCL Tender

Uttarakhand Power Corporation Limited - UPCL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date16 Jun 2023
Closing Date27 Jun 2023
Tender Amount₹ 96,65,916 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
33 KV Tension Clamp with bail & IPC

48

-

-

... More
33 KV Cable Ties for Pin Insulator.

48

-

-

... More
33 KV IPC for covered to covered connections

29

-

-

... More
33 KV IPC for covered to Bare connections

17

-

-

... More
33 KV Mid Span Jointing Kit

34

-

-

... More
IPC with Aluminium Bail for earthing

8

-

-

... More
33 KV Disc insulator for AAAC Covered Conductor

48

-

-

... More
33 KV Pin Insulator 120 KN

24

-

-

... More
PP Clamp for SP-55 with N&B

8

-

-

... More
Stay Clamp for SP-55 with N&B

24

-

-

... More
Bracing Clamp Top for SP 55 with N&B

8

-

-

... More
Bracing Clamp Bottom For SP 55 With N&B

8

-

-

... More
LABOUR PORTION

-

-

-

... More
Cartage of following material from ESC to Road site of work dist. Apprx. 160 km Loading/unloading comp.

-

-

-

... More
ST pole SP-55

8

-

-

... More
Small Material

35.5

-

-

... More
Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp.

-

-

-

... More
ST pole SP-55

8

-

-

... More
Small Material

35.5

-

-

... More
Fabrication of steel by cutting and drilling properly

336

-

-

... More
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole

7.9

-

-

... More
Erection of new 33 KV D/P Structure as per upcl norms

4

-

-

... More
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole

1.98

-

-

... More
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)

24

-

-

... More
Grouting of Stay as per norms (0.6*0.6*0.3)*stay

2.59

-

-

... More
Fixing, tightening and Nozzeling of Stay with pole and Stay rod on required Tension as per drawing

24

-

-

... More
Removing of old conductor with opening of existing jumpering and making of bundle. Length of line 2.800 KM

8048

-

-

... More
Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.

-

-

-

... More
33 KV AAAC AL-59 , 160 sq mm Covered Conductor

8289

-

-

... More
Excavation of earth and erection of 33 KV single support with CC Comp.

8

-

-

... More
Fixing of MVCC Accessories

-

-

-

... More
33 KV Tension Clamp with bail & IPC

48

-

-

... More
33 KV Cable Ties for Pin Insulator.

48

-

-

... More
33 KV IPC for covered to covered connections

29

-

-

... More
33 KV IPC for covered to Bare connections

17

-

-

... More
33 KV Mid Span Jointing Kit

34

-

-

... More
IPC with Aluminium Bail for earthing

8

-

-

... More
33 KV Disc insulator for AAAC Covered Conductor

48

-

-

... More
33 KV Pin Insulator

24

-

-

... More
Chemical Earthing on pole structure (Existing/New)

20

-

-

... More
Providing and fixing Danger board for 33 KV new structures

20

-

-

... More
Providing and fixing 33 KV termination kit

12

-

-

... More
Providing and fixing Anti climbing device for 33 KV new structures

40

-

-

... More
Plinth for 33 KV D/P.

4

-

-

... More
Painting of Poles SP-55

8

-

-

... More
Back cartage of dismantled material from work site to work road side.Average distance 2 Km

-

-

-

... More
Line material

22.16

-

-

... More
Back cartage of dismantied material from work site to Store center Rishikesh. Average destance 160 Km

-

-

-

... More
Line material

22.16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.