Shifting Of Existing Lines, S/s From Sh-70 Phase-1jhankat-khatima Under Edd,khatima

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of F- Clamps for STP,SP-55made of M.S. flat of size 50X6 mm. with 65x16mm.size ( 2 Nos. ) M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

244

-

-

... More
Supply of Brecing Clamps for STP,SP-55 made of M.S. flat of size 50X6 mm. with 65x16mm.size ( 2 Nos. ) M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

14

-

-

... More
Supply of L.T. Clamps for STP,SP-55 made of M.S. flat of size 50X6 mm. with 65x16mm.size ( 2 Nos. ) M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

120

-

-

... More
Supply of l..T. Clamps for P.C.C. Pole, made of M.S. flat of size 50X6 mm. with 65x16mm.size ( 2 Nos. ) M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

990

-

-

... More
Supply of earth Clmaps for STP-SP-55made of M.S. flat of size 50x6 mm. with 65x6mm.size ( 2 Nos. ) M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

260

-

-

... More
Supply of suspension clamp with I hook for LT cable STP,SP-55 M.s. Flate 50x6mm. Wth suitable size of nut& bolts.

28

-

-

... More
Supply of Dead End clamp with I hook for LT cable STP,SP-55 M.s. Flate 50x6mm. Wth suitable size of nut& bolts.

10

-

-

... More
Supply Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer ( Sintex make or other ISI mark reputed company ) with Panel Lock with key) ( As per drawing attached ) with clamp for STP-55 M.S. flate 50x6mm. with nut and bolts.

15

-

-

... More
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 120sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )

24

-

-

... More
Supply of Share head type Insulated piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120sq.mm to 25sq.mm ( Tyco/ RPG/3M. make) ( As per drawing attached )

45

-

-

... More
Supply of Eye Bolt 12x110mm.

320

-

-

... More
Turn Buckle for Guarding.

120

-

-

... More
Supply of Stay clamp single ended SP-55,M.S. flate 50x6mm. M.S. Bolt, Nut & washer duly painted by red oxide primer. The clamps should be free from any crack, welding & burrs complete in all respect as per sample.

175

-

-

... More
Supply of Stay Insulator P.C.C. Pole M.S. Flate 50x6mm with nut & bolts.The inslator should be free from any crack, welding & burrs complete in all respect as per sample. B&B.

175

-

-

... More
Supply of Nut & Bolts( Suitable size ) with washer suitable size for bracing .

340

-

-

... More
Supply of Suspension/Dead end clamp assembly with all fittings ( For HT ABC )

274

-

-

... More
11KV. GO/TPMO Switch set ( 600 Amp) with 2No. Mounting channel of 100x50mm. 2200mm.long for fixing arrangement complete with clamps, Nuts, Bolts & Washers all galvanized.

8

-

-

... More
11KV. 3Ph,( 400 Amp) 3 pin type, Vertical Mounting type, Gang Operated, AB switch/TPMO set with 2No. mounting channel 75x40x6mm., 2800 mm long with clamps, nuts bolts & Washers all galvanized.

9

-

-

... More
11KV, 3-PH,Drop Out Fuse units( set of 3 Units) along with support Insulators, Base Channel, Fuse barrel etc, complete with clamps, Nuts,Bolts & washers all galvanized as per technical specification, scope of works and approved drawings.

9

-

-

... More
T-Connector( one no. for each phase) of suitable size ( Incomer-150 sqmm. & outing as per site requirement )

24

-

-

... More
Universal Hook with bots & nuts all galvanized for handing of HT ABC, 11KV.

490

-

-

... More
PP of suitable size for Top portion of STP-410, SP-23 Pole.

89

-

-

... More
Suspension Clamp assembly including pole clamps( ST Pole ) suitable for 11KV. AB Cable.

442

-

-

... More
Dead end Anchor clamp assembly Brackets pole clamps (ST Pole) for 11KV. AB Cable.

50

-

-

... More
Earthwire clamp made of MS flate 50x8mm.for STP, SP-23 with Nut & bolts wahsers all galvanised.

9

-

-

... More
G.I. Earth pipe 40mm dia 2500mm. Long( with clamp of M.S. flat 40x3mm. Nuts,bolts & washers complete all galvanized.

27

-

-

... More
11KV. Danger Board with clamp, Nuts, Bolts & washers all galvanized.

442

-

-

... More
Anti-Climbing Device( 2.5mm.dia( 12SWG)galvanized barbed wire 3.5kg per pole ) with 2No. Clamp made of 50x8mm. Strip with nuts ,bolts & washers all galvanized.

435

-

-

... More
Supply of Holding clamps of 40x3mm. With bolts, Nuts and washers all galvanized( For GI Strip of DTR suitable for SP-23 Pole)

45

-

-

... More
Supply of Nut & Bolts( Suitable size ) with washer suitable size for bracing .

160

-

-

... More
Particulars of works.

-

-

-

... More
Cartage of STP.SP-55. including Loading / Unloading from store centre at Haldwani to Khatima Sub Station Avg..load 60KM.

336

-

-

... More
Cartage of P.C.C. Pole. including Loading / Unloading from store centre at Haldwani to Khatima Sub Station Avg.load 60Km.

712

-

-

... More
Cartage of STP.SP-23. including Loading / Unloading from store centre at Haldwani to Khatima Sub Station Avg..load 60KM.

34

-

-

... More
Cartage of small material . including Loading / Unloading from store centre at Haldwani to Khatima Sub Station.Avg..load 60KM.

510

-

-

... More
Cartage of STP.SP-55. including Loading / Unloading and carriage load from work site dump store at Khatima to dofferent work site load distance 1KM-20Km.

336

-

-

... More
Cartage of P.C.C. Pole.8.5Mtr long including Loading / Unloading and carriage load from work site dump store at Khatima to dofferent work site load distance 1KM-20Km.

712

-

-

... More
Cartage of STP.SP-23. including Loading / Unloading and carriage load from work site dump store at Khatima to dofferent work site load distance 1KM-20Km.

34

-

-

... More
Cartage of small material .including Loading / Unloading and carriage load from work site dump store at Khatima to different work site load distance 1KM-20Km.

510

-

-

... More
Errection &of P.C.C. Pole 8.5Mtr long single pole inlcuding digging of pit size 0.6x0.6x1.5M. , filling earth,boulder,fixing of all accessories upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

330

-

-

... More
Errection &of P.C.C. Pole 8.5Mtr long single pole inlcuding digging of pit size 0.6x0.6x1.5M. , filling earth,boulder,stone grouting, stone pad and kaing kicking block, fixing of all accessories upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

382

-

-

... More
Errection &of ST Pole SP-55, single pole inlcuding digging of pit size 0.6x0.6x2.15M. , without grouting suppoting proper level and alignment alongwith fitting of all accessories like top channel with the cost of required cement, sand stone with fixing of all accessories upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

245

-

-

... More
Errection &of ST Pole SP-55, Double pole inlcuding digging of pit size 0.6x0.6x2.15M. , without grouting suppoting proper level and alignment alongwith fitting of all accessories like top channel with the cost of required cement, sand stone with fixing of all accessories upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

42

-

-

... More
Errection &of ST Pole SP-55, Tri pole inlcuding digging of pit size 0.6x0.6x2.15M. , without grouting suppoting proper level and alignment alongwith fitting of all accessories like top channel with the cost of required cement, sand stone with fixing of all accessories upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

1

-

-

... More
Errection &of ST Pole SP-55, Four pole inlcuding digging of pit size 0.6x0.6x2.15M. , without grouting supporting proper level and alignment alongwith fitting of all accessories like top channel bracing & clamps with the cost of required cement, sand stoneupto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

1

-

-

... More
Errection &of ST Pole SP-23, Double pole inlcuding digging of pit size 0.6x0.6x1.5 M.Grouting stone pad and making kicking block inE&B, fitting of all accessories like top channel bracing & clamps with the cost of required cement, sand stone upto energisation, etc complete work as per RESPO Specification and as per direction of Engineer In Charge.

17

-

-

... More
Febrication and fixing of channel/bnracing complete for double pole 100x50mm.incouding fixing of channel with clamps including cutting, drilling holes and fabrication as requrired and direction of Engineer-In-Charge.

7247

-

-

... More
Errection & grouting of Stay set including diffing of pit size 0.60x0.60x1.5 Mtr. With stay rod 16x1800mm., stay wire 7/8 swg. With proper nozzeling with back filling of pit with CC 1:4:8 in bottom of pit stay wire 7/8 SWG( Stay set and stay wire will be provided by the department ) and grouting of stay in pit with CC 1:4:8 in bottom of pit in size 0.60x0.60x0.60 Mtr. and earth filling complete in all respect with cost of cement , sand , & stone ballast and supply and fixing of all other items with stay clamps, stay elbow including proper nozelling etc. required for proper completion of work, as per direction of Engineer- In- charge.

175

-

-

... More
Fixing of 11KV. X-arm angle including drilling hole and fabrication as required material.

244

-

-

... More
Fixing of Special type of bracket for composite line.

28

-

-

... More
Fixing of Aluminium Crimping lugs suitabnle for HT< sides Transformers.

144

-

-

... More
Laying , sprreading, stringing and sagging of 11KV.AB Cable Cable by providing proper sag including handing on suspension clamp etc fixing of T connector and hositing on dead end clamp with continous earth wire complete work upto energisation,including removing old conductor including fixing of all accessories with binding & jumpering in canal section.

13

-

-

... More
Laying , sprreading, stringing and sagging of 11KV.line on ACSR dog conductor by providing proper sag including binding etc. fixing of 11KV. pin insulator and hositng of disc insuoator. as per RESPO specification

13

-

-

... More
Laying , sprreading, stringing and sagging of L.T .line on ACSR weasel conductor wire by providing proper sag including binding etc. fixing of L.T. clamp & insulator complete work as per RESPO specification. 3 phase 4 wire.

5.2

-

-

... More
Laying , sprreading, stringing and sagging of LT .line on ACSR wesel conductor wire by providing proper sag including binding etc. fixing of L.T. clamp & insulator complete work as per RESPO specification. 2 phase 3wire.

5

-

-

... More
Laying , sprreading, stringing and sagging of LT .line on ACSR wesel conductor wire by providing proper sag including binding etc. fixing ofL.T. clamp & insulator complete work as per RESPO specification. 1 phase 2wire.

5

-

-

... More
Laying , sprreading, stringing and sagging of L.T. A.B. Cable 1x120 sq.mm. complete work as per RESPO specification.

1.16

-

-

... More
Shifting charges of existing 11/0.4 KV. Tranformers with L.T. Cable to new Double pole plinth with help of hydra,chainpulley, Crain & labour etc.Fabrication of complete DP with complete fixing of all accessories, earthing including LA., 25KVA.

16

-

-

... More
Shifting charges of existing 11/0.4 KV. Tranformers with L.T. Cable to new Double pole plinth with help of hydra,chainpulley, Crain & labour etc.Fabrication of complete DP with complete fixing of all accessories, earthing including LA., 63KVA.

12

-

-

... More
Shifting charges of existing 11/0.4 KV. Tranformers with L.T. Cable to new Double pole plinth with help of hydra,chainpulley, Crain & labour etc.Fabrication of complete DP with complete fixing of all accessories, earthing including LA., 100KVA.

8

-

-

... More
Shifting charges of existing 11/0.4 KV. Tranformers with L.T. Cable to new Double pole plinth with help of hydra,chainpulley, Crain & labour etc.Fabrication of complete DP with complete fixing of all accessories, earthing including LA., 160KVA.

1

-

-

... More
Painting of S.T. Pole Structure one red oxide & trwo coat aluminium paint.

370

-

-

... More
Guarding of Line over(Road/LT line/over constructed buklding crossing as per drawing with 6/8 SWG, G.I. Wire including fixing of guarding channel/angle as per direction of Engineer-In-Charge.

40

-

-

... More
Fixing of triangular type Guarding bracket with supporting angle at middle position in 33KV.linewith complete fitting by mean of clamp Nut bolt & welding as per site.

40

-

-

... More
Construction of transformetr plenth ( 7x4x3)fit, filled by concrete andmud, with matrerial, including cartage of material.

1

-

-

... More
Installationof mesh fecing arout DT for protection of DT having gate and lock arrangement ( 9x5x4 fit).

1

-

-

... More
Dismentaling of old poles by dydra loading in tractor/truck includking removing of conductor, carriage loading, unloading upto JE store.

13

-

-

... More
Dismentaling of old ACSR conductor 11KV/LT line including removing of conductor making roll, safe carriagfe loading unloading upto JE Store ( 11KV & L.T. conductor line )

15

-

-

... More
Cartage of old ACSR conductor from JE store to store centre including loading & unloading at both end ( 11KV and LT conductor line )

1

-

-

... More
Cartage of old ACSR Conductor from JE store to store centre including loading & unloading at both end ( 11KV and LT conductor line )

1

-

-

... More
Cartage of old damaged poles from JE store to store centre including loading & unloading at both end ( 11KV & LT conductor line )

1

-

-

... More
Cartage of old damaged poles from JE store centre including loading & unloading at both end( Agriculture feeder )

1

-

-

... More
Dismentaling of old poles by hydra loading in tractor/truck including removing of conductor, carriae loading unloading upto JE store ( agricultrure feeder )

442

-

-

... More
Cartage of old scrap material from JE store to store centre including loading and unloading at both end( Agriculture feeder )

40

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.