Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date13 Sep 2023
Closing Date19 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 4,97,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPCL9_63360_1Bid Award Id
ViewTender No
EDC(H)/51/2023-24Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
33 KV Tension Clamp with bail & IPC
133
-
-
... More
33 KV Cable Ties for Pin Insulator.
302
-
-
... More
33 KV IPC for covered to covered connections
20
-
-
... More
33 KV IPC for covered to Bare connections
15
-
-
... More
33 KV Mid Span Jointing Kit
10
-
-
... More
IPC with Aluminium Bail for earthing
3
-
-
... More
33 KV Disc insulator for AAAC Covered Conductor
94
-
-
... More
33 KV Pin Insulator 120 KN
36
-
-
... More
PP and Clamp for SP-55 with N&B
44
-
-
... More
Stay Clamp for SP-55 with N&B
72
-
-
... More
Bracing Clamp Top for SP 55 with N&B
44
-
-
... More
Bracing Clamp Bottom For SP 55 With N&B
44
-
-
... More
B Labour Charge: Cartage of following material from ESC to Road site of work dist. Apprx. 160 km Loading/unloading comp.
-
-
-
... More
ST pole SP-55
44
-
-
... More
Small Material
35.5
-
-
... More
Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp.
-
-
-
... More
(a) ST pole SP-55
44
-
-
... More
(b) Small Material
35.5
-
-
... More
Fabrication of steel by cutting and drilling properly
1848
-
-
... More
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole
43.48
-
-
... More
Erection of new 33 KV D/P Structure as per upcl norms
22
-
-
... More
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole
10.87
-
-
... More
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)
132
-
-
... More
Grouting of Stay as per norms (0.6*0.6*0.3)*stay
14.26
-
-
... More
Providing and Fixing of new 33 KV stay as per upcl norms
312
-
-
... More
Fixing , tightening and Nozzeling of Stay With pole and Stay rod on required Tension as per per drawing
47
-
-
... More
Removing of old conductor with opening of existing jumpering and making of bundle.
10844
-
-
... More
Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.
-
-
-
... More
33 KV AAAC AL-59 , 241 sq mm Covered Conductor
12350
-
-
... More
Excavation of earth and erection of 33 KV single support with CC Comp.
44
-
-
... More
Fixing of MVCC Accessories
-
-
-
... More
33 KV Tension Clamp with bail & IPC
133
-
-
... More
33 KV Cable Ties for Pin Insulator.
302
-
-
... More
33 KV IPC for covered to covered connections
20
-
-
... More
33 KV IPC for covered to Bare connections
15
-
-
... More
33 KV Mid Span Jointing Kit
10
-
-
... More
IPC with Aluminium Bail for earthing
3
-
-
... More
33 KV Disc insulator for AAAC Covered Conductor
94
-
-
... More
33 KV Pin Insulator
36
-
-
... More
Chemical Earthing on pole structure (Existing/New)
19
-
-
... More
Providing and fixing of 33 KV Termination Kit
13
-
-
... More
Providing and fixing Anti climbing device for 33 KV new structures
44
-
-
... More
Plinth for 33 KV D/P.
12
-
-
... More
Painting of Poles SP 55
120
-
-
... More
Back cartage of dismantled material from work site to work road side.Average distance 2 Km
-
-
-
... More
Line material
25.7
-
-
... More
Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km
-
-
-
... More
Line material
25.7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements