Uttarakhand Power Corporation Limited Tender
View complete overview of Uttarakhand UPCL Tender
Uttarakhand Power Corporation Limited - UPCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date18 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 2,03,41,000
Costs
EMD
₹ 4,07,000Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPCL4_73678_1Bid Award Id
ViewTender No
E-Tender no.16/EDC(s)/2024-25Tender Authority
Uttarakhand Power Corporation Limited ViewPurchaser Address
-Website
http://https://www.upcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
33 KV Tension Clamp with bail & IPC
120
-
-
... More
33 KV Cable Ties for Pin Insulator.
450
-
-
... More
33 KV IPC for covered to covered connections
110
-
-
... More
33 KV IPC for covered to Bare connections
110
-
-
... More
33 KV Mid Span Jointing Kit
25
-
-
... More
IPC with Aluminium Bail for earthing
15
-
-
... More
33 KV Disk Insulator for AAAC Covered Conductor
60
-
-
... More
33 KV Pin Insulator 70 KN
65
-
-
... More
PP and Clamp for SP-55 with N&B
24
-
-
... More
Stay Clamp for SP-55 with N&B
115
-
-
... More
Bracing Clamp Top for SP 55 with N&B
20
-
-
... More
Bracing Clamp Bottom For SP 55 With N&B
20
-
-
... More
Labour
-
-
-
... More
Cartage of following material from ESC to Road site of work dist. Apprx. 160 km Loading/unloading comp.
-
-
-
... More
ST pole SP-55
9
-
-
... More
Small Material
25.5
-
-
... More
Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp.
-
-
-
... More
ST pole SP-55
9
-
-
... More
Small Material
25.5
-
-
... More
Fabrication of steel by cutting and drilling properly
1420
-
-
... More
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole
43.48
-
-
... More
Erection of new 33 KV D/P Structure as per upcl norms
1
-
-
... More
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole
4.82
-
-
... More
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)
56
-
-
... More
Grouting of Stay as per norms (0.6*0.6*0.3)*stay
3.02
-
-
... More
Fixing , tightening and Nozzeling of Stay With pole and Stay rod on required Tension as per per drawing
128
-
-
... More
Removing of old conductor with opening of existing jumpering and making of bundle. Length of line 2.800 KM
9050
-
-
... More
Laying, spreading, stringing, sagging of 33 KV line in 3 Phase of the following wire as phase wire including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.
-
-
-
... More
33 KV AAAC AL-59 , 241 sq mm Covered Conductor
14450
-
-
... More
Excavation of earth and erection of 33 KV single support with CC Comp.
9
-
-
... More
Fixing of MVCC Accessories
-
-
-
... More
33 KV Tension Clamp with bail & IPC
120
-
-
... More
33 KV Cable Ties for Pin Insulator.
450
-
-
... More
33 KV IPC for covered to covered connections
110
-
-
... More
33 KV IPC for covered to Bare connections
110
-
-
... More
33 KV Mid Span Jointing Kit
25
-
-
... More
IPC with Aluminium Bail for earthing
15
-
-
... More
33 KV Disc insulator for AAAC Covered Conductor
68
-
-
... More
33 KV Pin Insulator
70
-
-
... More
Providing and fixing of 33 KV Termination kit
15
-
-
... More
Providing and fixingAnti Climbing device for 33 KV new structures
24
-
-
... More
Plinth for 33KV D/P
2
-
-
... More
Painting of Poles SP 55
21
-
-
... More
Back cartage of dismantled material from work site to work road side.Average distance 2 Km
-
-
-
... More
Line material
26.7
-
-
... More
Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km
-
-
-
... More
Line material
26.7
-
-
... More
Fixing of Aluminium Lugs
-
-
-